16d LLC
Vashon, mostly panel upgrade work
- 28 jobs in Seattle, 2021 to 2026
- Typical job $14,115
Jobs by type of work
Most recent jobs
| Date | Work | ZIP |
|---|---|---|
| 2026-08-05 | Panel upgrade@ MPT - RESI REPLACE ELEVATOR DISCONNECT USING EXISTING FEEDERS AND UPSTREAM OCPD. RELOCATE ELEVATOR UTILIZATION CIRCUITS TO MACHINE ROOM | 98121 |
| 2026-07-13 | Panel upgradeFor the purpose of elevator modernization: Replace existing conventional FA panel with addressable. Add module for existing zone. Install co | 98133 |
| 2026-05-12 | Panel upgrade@ WATERMARK TOWER, REPLACE ELEVATOR DISCONNECTS. RELOCATE ELEVATOR UTILIZATION CIRCUITS OCPD TO MACHINE ROOM PANEL. UPGRADE MACH ROOM AND P | 98101 |
| 2026-05-12 | Panel upgrade@ ONE PACIFIC TOWER REPLACE ELEVATOR DISCONNECTS. RELOCATE ELEVTOR UTILIZATION CIRCUITS OCPD TO MACHINE ROOM PANEL. UPGRADE MACH ROOM AND P | 98121 |
| 2026-02-27 | Panel upgradeReplace elevator disconnects using existing feeders and upstream OCP. Relocate elevator utilization circuits OCP to machine room panel. Upgr | 98126 |
| 2025-11-19 | Panel upgradeFor the purpose of elevator modernization: Replace FA panel with addressable, replace initiating devices with addressable, install detection | 98119 |
| 2025-10-06 | Panel upgradeFor the purpose of elevator modernization: Replace FA panel and initiating devices with addressable. Add relays for elevator and monitoring | 98109 |
| 2025-09-09 | Panel upgradeFor the purpose of elevator modernization: Replace existing conventional panel with addressable. Install detection on all elevator landings | 98112 |
| 2025-09-04 | Panel upgradeFor the purpose of elevator modernization: Replace conventional FA panel with new addressable panel. Replace initiating devices with address | 98103 |
| 2025-07-16 | Panel upgradeREPLACE DAMAGED ELECTRICAL PANEL W NEW PANELBOARD AND BREAKERS. NO CHANGE TO CIRCUITS OR LOADS | 98115 |
| 2025-05-29 | Panel upgradeFor the purpose of elevator modernization: Replace existing FACP with new addressable. Install detection on all elevator landings and in the | 98116 |
| 2025-04-30 | Panel upgradeFor the purpose of elevator modernization: Replace FA panel and install detection in machine room, on each of four elevator landings, and at | 98119 |
Get quotes from up to 3 licensed panel upgrade electricians
Tell us about the job. We pass your request to up to 3 contractors with an active state license who do this work near your ZIP code. They contact you, and you decide.
Request sent
Up to 3 licensed contractors will get your request. Expect a call or email from them in the next few days.
Paying for your panel upgrade
Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.
See all 344 panel upgrade electriciansRanked by jobs in Seattle