Pepper Construction Company
, mostly addition work
- 13 jobs in Chicago, 2022 to 2026
- Typical job $1,155,000
Chicago publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.
Jobs by type of work
Most recent jobs
| Date | Work | ZIP |
|---|---|---|
| 2026-08-26 | ReroofSCOPE: ROOF REPLACEMENT. AREA: 1800 SQ. FT. ROOF COVERING: BUILT-UP ROOF. LOCATION: THE ROOF - SCOPE -NO TILE. JUST THE FLAT PORTIONS.. IL R | |
| 2025-04-30 | RemodelSCOPE: NONSTRUCTURAL INTERIOR REMODEL OF EXISTING RESTROOMS, REPLACE PLUMBING AND ELCTRICAL FIXTURES AND FINISHES. LOCATIONS: 0 RESIDENTIAL | |
| 2024-11-26 | AdditionDDS 2019 CBRC & CBC: ERS/EX ONLY (AS A REVISION PART OF DOB) PREVIOUS PERMIT 100994412 TO SHIFT ERS. REVISIONS INCLUDE ERS STRATEGY FOR FOUN | |
| 2024-06-11 | RemodelSC 2019 CBRC: REMODEL TWO EXISTING CLASSROOMS INTO ONE CLASSROOM. REMODEL EXISTING CORRIDOR. (OCCUPANCY GROUP B; TYPE IA CONSTRUCTION) | |
| 2024-03-22 | ReroofSELF-CERT 2019 CBRC: SELECTIVE INTERIOR AND EXTERIOR DEMOLITION OF EXISTING 4TH FLOOR TENANT CORRIDOR AND TERRACE SPACE. INTERIOR WORK TO IN | |
| 2023-10-25 | AdditionDDS 2019 CBRC & CBC: INTERIOR & EXTERIOR ALTERATIONS AT ALL 4 LEVELS OF THE EXISTING MUSEUM FOR A NEW SW ENTRY PAVILION AND NORTH TERRACE AD | |
| 2023-10-05 | AdditionDDS 2019 CBRC & CBC: FOUNDATION SYSTEMS ONLY AT EXISTING MUSEUM FOR NEW ENTRY PAVILION STRUCTURE AT SW ENTRANCE AND NEW NORTH TERRACE ADDITI | |
| 2023-09-28 | RemodelSELF_CERT 2019 CBC: REMODEL EXISTING THIRD FLOOR STUDENT LOUNGE AND LIBRARY STAFF SPACE INTO STUDENT AFFAIRS MEETING SPACES, INCLUDING ADDIN | |
| 2022-12-21 | Pool or spaDDS 2019 CBRC: INTERIOR RENOVATION TO THE EXISTING 8TH FLOOR POOL WITH ALTERATIONS TO 7TH FLOOR EQUIPMENT ROOM AT AN EXISTING HOTEL. WORK TO | |
| 2022-08-19 | Addition1601 SQ ADDITION IN TWO SEPARATE AREAS TO EXISTING 8TH FLOOR PENTHOUSE BUSINESS OFFICE USE | |
| 2022-08-12 | Addition(SELF-CERT PROJECT / 2019 CBRC) INTERIOR & EXTERIOR ALTERATIONS TO EXISTING OFFICE SPACE (FLOORS 1 & 2) IN AN EXISTING OFFICE BUILDING, TO | |
| 2022-07-11 | RemodelSELF-CERT 2019 CBRC: REMODEL EXISTING LOWER LEVEL COMPUTER ROOM INTO TWO CLASSROOMS AND A CORRIDOR. OCCUPANCY IS GROUP B (EDUCATIONAL USE FO |
More home addition contractors
- Bourn As Developers LLC
- Cmb Construction, Inc
- Dingle Bay Carpentry & General Contracting, Inc
- Hurtado Re-hab Inc
- Lg Construction Group LLC
- Northwest Remodelers & Builders, Inc
Get quotes from up to 3 home addition contractors
Tell us about the job. We pass your request to up to 3 contractors who do this work near your ZIP code. They contact you, and you decide.
Request sent
Up to 3 contractors will get your request. Expect a call or email from them in the next few days.
Paying for your addition
Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.
See all 213 home addition contractorsRanked by jobs in Chicago