Fg Real Estate Development Llc
, mostly adu work
- 25 jobs in Anaheim, 2022 to 2026
- Typical permit value $19,464
- 15 of 25 jobs are ADUs
Anaheim publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.
Jobs by type of work
- ADU
- Addition
- Panel upgrade
- Reroof
Most recent jobs
| Date | Work | ZIP |
|---|---|---|
| 2026-06-11 | ADU924 Sq. Ft. To Construct 2-story Attached Accessory Dwelling Unit With 35 Sq. Ft. Balcony (3bd/1bth) Ref:bld2025-05385 | 92804 |
| 2026-06-11 | Addition225 Sq. Ft. To Construct New Bedroom And Bathroom. Demo (2) Chimney Fireplaces And Attached Patio Cover. Install 400amp Dual-meter Panel. (4 | 92804 |
| 2026-05-18 | ADU(Adu) New Residential Construction: 1,199 Sq. Ft. To Construct Detached Accessory Dwelling Unit With 30 Sq. Ft. Covered Porch. (3bdrm/3bth) | 92804 |
| 2026-03-30 | ADU(Adu) New Residential Construction: 1,197 Sq Ft To Construct Two-story Detached Accessory Dwelling Unit. 400 Amp Dual Meter. (3bd/2ba) Ref: | 92804 |
| 2025-12-03 | ADU(Adu) New Residential Construction: 1,200 Sq. Ft. Detached Accessory Dwelling Unit. Install 400 Amp Dual Meter. (3bd/2bth) Ref: Bld2024-0063 | 92805 |
| 2025-11-12 | Addition538 Sq Ft For (2) Bedrooms And (2) Bathrooms. Convert An Existing Bedroom To Family Room. 400 Amp Dual Meter. (3bd/3ba) Ref: Bld2025-00863 A | 92804 |
| 2025-11-12 | ADU(Adu) New Residential Construction: 800 Sq Ft Detached Accessory Dwelling Unit. Install Roof Mounted Solar With (6) Modules And (6) Micro-in | 92804 |
| 2025-10-08 | ADU(Adu) New Residential Construction: 1,200 Sq Ft Two-story Detached Accessory Dwelling Unit With 30 Sq Ft Covered Porch. (3bd/3ba) Ref Bld202 | 92801 |
| 2025-01-23 | ADU403 Sq. Ft. To Convert Existing Attached Garage Into Accessory Dwelling Unit. (1bd/1ba) | 92804 |
| 2024-11-15 | ReroofReroof: Remove And Install (49) Squares Of Composition Shingles Over Existing House And Attached Garage Ref: Bld2024-02311 REROOF | 92801 |
| 2024-09-10 | Panel upgradeElectrical For 400 Amp Dual Panel Upgrade. Ref: Bld2023-05421 | 92805 |
| 2024-09-10 | ADU990 Sq. Ft. To Construct Attached Two-story Accessory Dwelling Unit. (3bd/2ba). | 92805 |
More ADU builders near 92804
- Modern Muse Construction Inc
- Next Construction Inc
- Longview Construction & Engineering
- Mohanad Alkhreisha
- T J Construction
- Dv Construction Inc
Get quotes from up to 3 ADU builders
Tell us about the job. Within one business day we email you up to 3 contractors who do this work near your ZIP code, and pass your request to them. You decide who to hire.
We got your request
Within one business day we will email you up to 3 contractors who fit, and pass your request to them.
Paying for your ADU
Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.
See all 45 ADU buildersRanked by jobs in Anaheim