contractors.fyi
Sign in

Freedom Solar Power

Solar installer working in Austin.

  • License active

56 jobs on Austin permits, 2023 to 2026: 48 solar installations, 7 panel upgrades, 1 EV charger installation. 27th most solar system permits of 115 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 28621, valid until Dec 22, 2026We matched it by the phone on their permits.Checks out
Jobs on record56 jobs on Austin permits, 2023 to 2026: 48 solar installations, 7 panel upgrades, 1 EV charger installation27th most solar system permits of 115 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.Of their 48 solar system permits, 2 mention a battery.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a solar system permit stays open about 85 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 7 days. How long solar system jobs take.

Track record

55 jobs in the last 12 months, up from 0 the year before

Q3 2023: 1 jobQ4 2025: 2 jobsQ1 2026: 9 jobsQ2 2026: 22 jobsQ3 2026: 22 jobsBusiest: 22 jobs202420252026
Each bar is 3 months of permits. The tallest is 22 jobs, April to June 2026. Across Austin, all contractors together had 9% fewer solar system jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787317 jobs
  • 787305 jobs
  • 787034 jobs
  • 787344 jobs
  • 787504 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 18, 2026Solar, 3.045 kWPH2 Install new 3.045 kw rooftop solar system for existing residential only78754not stated
Sep 10, 2026Solar, 5.81 kW78749not stated
Sep 9, 2026SolarPrewire permit for solar project78703not stated
Sep 1, 2026SolarInstall additional pv components78749not stated
Aug 27, 2026Solar, 2.289 kWPH2 Install new 2.289kw rooftop solar system for existing residential only78729not stated
Aug 26, 2026SolarDisconnect/reconnect to repair pv/ESS components78734not stated
Aug 25, 2026Solar, 4.3 kW78750not stated
Aug 25, 2026Solar, 17.2 kW78744not stated
Aug 25, 2026Panel upgradeDisconnect/reconnect to install new 200a utility meter and upgrade main distribution panel78750not stated
Aug 24, 2026SolarDisconnect/reconnect to repair pv/ESS components78744not stated
Aug 20, 2026Solar, 11.2 kW78731not stated
Aug 20, 2026Solar, 9.775 kW78723not stated
Aug 14, 2026SolarDisconnect/reconnect to repair pv/ESS components78734not stated
Aug 13, 2026Solar, 3.50 kW78731not stated
Aug 5, 2026Solar78731not stated
Aug 4, 2026Solar, 12.615 kW78717not stated
Aug 4, 2026Panel upgradeInstalling a 60a tesla ev charger eaton dt323frkats 30a inlet box for v2g backup and a backed up…78704not stated
Aug 4, 2026EV chargerInstalling a 60a tesla ev charger eaton dt323frkats 30a inlet box for v2g backup and a backed up…78704not stated
Jul 28, 2026Solar, 23.925 kW78731not stated
Jul 28, 2026Solar, 22 kWDisconnect/reconnect to tie in pv/ESS components78729not stated
Jul 22, 2026Solar, 1.962 kW78744not stated
Jul 10, 2026Solar, 5.22 kW78726not stated
Jun 26, 2026Solar, 8.925 kWInstall new 8.925kW rooftop solar system and 11.5kW energy storage system for existing residential…78757not stated
Jun 23, 2026SolarNo details on the permit78734not stated
Jun 16, 2026Solar78759not stated
Jun 3, 2026Solar, 9.775 kW78717not stated
Jun 1, 2026Solar, 22.68 kW78731not stated
Jun 1, 2026Solar, 4.25 kW78703not stated
Jun 1, 2026Solar78731not stated
May 20, 2026Solar, 3.924 kW78738not stated
May 19, 2026Solar, 18.27 kW78746not stated
May 19, 2026SolarPre-wire for solar78703not stated
May 18, 2026Solar, 8.265 kW78756not stated
May 18, 2026Panel upgradeDisconnect/reconnect to Upgrade main distribution panel78756not stated
May 11, 2026SolarGeneral work on existing solar system78660not stated
Apr 29, 2026Panel upgradeDisconnect/reconnect to upgrade the main distribution panel78746not stated
Apr 22, 2026Solar78734not stated
Apr 21, 2026Solar, 2.975 kW78717not stated
Apr 20, 2026Solar, 8.07 kW78748not stated
Apr 16, 2026SolarGeneral work on existing solar system78750not stated

What to ask before you hire

About Freedom Solar Power

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Freedom Solar Power

Five quick questions. We pass your request to Freedom Solar Power.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Freedom Solar Power. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 78731 and 78730

See all 115 solar installers in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.