Greenbelt Solar
Solar installer working in Austin.
- License active
100 jobs on Austin permits, 2021 to 2026: 79 solar installations, 21 EV charger installations. 17th most solar system permits of 115 contractors in Austin.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Texas electrical contractor license 28367, valid until Aug 17, 2027We matched it by the business name in the same city, Austin. | Checks out |
| Jobs on record | 100 jobs on Austin permits, 2021 to 2026: 79 solar installations, 21 EV charger installations17th most solar system permits of 115 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.Of their 79 solar system permits, 4 mention a battery. |
Records: City of Austin permits.
Cost and timing
Solar in Austin: $20,000 to $37,000
Half of 2,383 installs from January 2021 to February 2024 cost an amount in this range.
How to read this range
These are prices homeowners paid, as installers reported them to state programs. Lawrence Berkeley National Laboratory collects them in its Tracking the Sun data. A quarter paid less than this range, and a quarter paid more. The prices are before the federal tax credit.
Permit timeline
Across Austin, a solar system permit stays open about 85 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 7 days. How long solar system jobs take.
Track record
12 jobs in the last 12 months, down from 22 the year before
Where they work most
- 7874511 jobs
- 7875911 jobs
- 787049 jobs
- 787388 jobs
- 787577 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Sep 9, 2026 | Solar | 78748 | not stated |
| Sep 1, 2026 | Solar | 78730 | not stated |
| Aug 26, 2026 | Solar | 78745 | not stated |
| Aug 25, 2026 | SolarAdding a solar rooftop system to an existing building | 78745 | not stated |
| Jul 30, 2026 | SolarDetach and reset for an already installed solar system due to hail damage and roof replacement | 78729 | not stated |
| Mar 6, 2026 | EV chargerAdding a Level 2 EV Charger for an existing residence with an electric vehicle | 78723 | not stated |
| Dec 15, 2025 | SolarInstalling a rooftop residential solar system with battery backup on an existing residence | 78745 | not stated |
| Nov 23, 2025 | Solar | 78746 | not stated |
| Nov 8, 2025 | Solar | 78759 | not stated |
| Nov 7, 2025 | EV charger | 78759 | not stated |
| Oct 23, 2025 | Solar | 78738 | not stated |
| Oct 6, 2025 | EV charger | 78747 | not stated |
| Sep 18, 2025 | Solar | 78747 | not stated |
| Sep 17, 2025 | SolarInstalling a solar system in a non Austin Energy serviced area (territory grid serviced by… | 78717 | not stated |
| Sep 17, 2025 | SolarUpgrading a load center to accommodate adding a solar system on a separate active permit… | 78759 | not stated |
| Sep 15, 2025 | Solar | 78759 | not stated |
| Sep 6, 2025 | SolarShutdown to safely add a MDS breaker and tie in solar equipment | 78704 | not stated |
| Sep 6, 2025 | Solar | 78704 | not stated |
| Sep 4, 2025 | Solar | 78749 | not stated |
| Sep 4, 2025 | EV charger | 78749 | not stated |
| Sep 4, 2025 | EV charger | 78723 | not stated |
| Aug 19, 2025 | Solar | 78747 | not stated |
| Aug 19, 2025 | EV charger | 78747 | not stated |
| Jul 16, 2025 | Solar | 78753 | not stated |
| Jul 16, 2025 | Solar | 78750 | not stated |
| Jul 11, 2025 | Solar | 78723 | not stated |
| Jun 4, 2025 | EV chargerAdding a Level 2 EV Charger for an electric vehicle | 78745 | not stated |
| May 1, 2025 | EV chargerAdding a Level 2 charger for an electric vehicle | 78717 | not stated |
| Apr 9, 2025 | Solar | 78728 | not stated |
| Jan 12, 2025 | EV charger | 78722 | not stated |
| Dec 16, 2024 | Solar | 78735 | not stated |
| Nov 7, 2024 | EV charger | 78745 | not stated |
| Oct 9, 2024 | Solar | 78738 | not stated |
| Oct 2, 2024 | EV charger | 78757 | not stated |
| Sep 12, 2024 | Solar | 78703 | not stated |
| Sep 11, 2024 | SolarAdding a solar pv rooftop system and ESS battery storage to an existing residence | 78704 | not stated |
| Aug 28, 2024 | SolarRequest to disconnect Scheduling a shutdown to safely add ESS battery storage with solar (separate… | 78704 | not stated |
| Aug 5, 2024 | Solar | 78759 | not stated |
| Aug 5, 2024 | Solar | 78732 | not stated |
| Aug 5, 2024 | EV charger | 78759 | not stated |
What to ask before you hire
About Greenbelt Solar
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any solar installer
- Can you show me proof of liability insurance and your bond?
- What size system, which panels and inverter, and what will it make in a year?
- Is my roof good for 25 more years, and what if it needs work first?
- Who handles the permit and the utility's approval to turn it on?
Get a quote from Greenbelt Solar
Five quick questions. We pass your request to Greenbelt Solar.
Request for Greenbelt Solar
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Greenbelt Solar. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore solar installers near 78745 and 78759
- Horus Partners
- Power Home Remodeling
- Texas Solar and Roofing Pros
- Sunrun Installation Service Inc
- Titan Solar Power Tx Inc
- Ion Developer LLC
See all 115 solar installers in Austin, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.