Vikta Energy
Solar installer working in Austin.
- No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same city
12 jobs on Austin permits, 2022 to 2026: 9 solar installations, 2 EV charger installations, 1 panel upgrade. 65th most solar system permits of 115 contractors in Austin.
What the public records show
From the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | No Texas electrical contractor license matched this business by the phone on its permits, or by its name in the same cityLook them up on the state's license search. | Ask them |
| Jobs on record | 12 jobs on Austin permits, 2022 to 2026: 9 solar installations, 2 EV charger installations, 1 panel upgrade65th most solar system permits of 115 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.Of their 9 solar system permits, 4 mention a battery. |
Records: City of Austin permits.
Cost and timing
Solar in Austin: $20,000 to $37,000
Half of 2,383 installs from January 2021 to February 2024 cost an amount in this range.
How to read this range
These are prices homeowners paid, as installers reported them to state programs. Lawrence Berkeley National Laboratory collects them in its Tracking the Sun data. A quarter paid less than this range, and a quarter paid more. The prices are before the federal tax credit.
Permit timeline
Across Austin, a solar system permit stays open about 85 days, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 7 days. How long solar system jobs take.
Track record
7 jobs in the last 12 months, up from 2 the year before
Where they work most
- 787463 jobs
- 787362 jobs
- 787302 jobs
- 787381 job
- 787271 job
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Aug 3, 2026 | Solar, 24.92 kWInstallation of 24.92 kW roof mounted solar system and (2) Tesla Powerwall 3 Batteries | 78746 | not stated |
| Aug 3, 2026 | EV chargerInstallation of Tesla Universal EV Charger | 78746 | not stated |
| Jul 7, 2026 | Solar, 42.275 kWInstallation of 42.275 kW roof mounted solar system + 2 PW3s + 1 PW3 Expansion Pack | 78736 | not stated |
| May 15, 2026 | Panel upgradeShutdown needed for Gateway installation Transfer switch installation and load side service panel… | 78736 | not stated |
| Mar 11, 2026 | Solar, 33.82 kWInstallation of 33.82 kW roof mounted solar system + 7 Powerwall 3 Batteries + 3 Powerwall 3… | 78746 | not stated |
| Dec 2, 2025 | Solar, 22.695 kW22.695 kW roof mounted solar + 2 Powerwall 3 Batteries + Cybertruck Powershare Integration | 78730 | not stated |
| Dec 2, 2025 | EV chargerInstallation of (2) Level 2 EV Chargers | 78730 | not stated |
| Aug 28, 2025 | Solar, 61.92 kWInstallation of 61.92 kW Tesla Solar Roof (8) Tesla Powerwall 3 Batteries 1707000-xx-y and (12)… | 78738 | not stated |
| Mar 13, 2025 | SolarExpress: install tesla solar roof | 78727 | not stated |
| May 13, 2024 | SolarExpress: Tesla solar shingle roof solar panels tesla power walls | 78703 | not stated |
| Jan 3, 2022 | Solar, 4.970 kWInstallation of 4.970kW. Grid tied roof mounted solar array with rapid shutdown inverter | 78617 | not stated |
| Jan 3, 2022 | Solar, 10.075 kWInstallation of 10.075kW for 31 panels | 78744 | not stated |
What to ask before you hire
About Vikta Energy
- Ask for their electrical contractor license number and check it with the state.
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any solar installer
- Can you show me proof of liability insurance and your bond?
- What size system, which panels and inverter, and what will it make in a year?
- Is my roof good for 25 more years, and what if it needs work first?
- Who handles the permit and the utility's approval to turn it on?
Get a quote from Vikta Energy
Five quick questions. We pass your request to Vikta Energy.
Request for Vikta Energy
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Vikta Energy. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore solar installers near 78746 and 78736
- Hesolar LLC
- Titan Solar Power Tx Inc
- Adt Solar LLC
- Palmetto Solar LLC
- Approved Electrical
- Goodson Contracting & Services LLC
See all 115 solar installers in Austin, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.