Couper Electric LLC
Panel upgrade electrician working in Boulder.
- Boulder publishes no contractor license list we can check
23 jobs on Boulder permits, 2021 to 2026: 18 panel upgrades, 3 heat pump installations, 2 EV charger installations. 13th most panel upgrade permits of 64 contractors in Boulder.
What the public records show
From the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Boulder publishes no contractor license list we can checkThat says nothing about this business either way. | Ask them |
| Jobs on record | 23 jobs on Boulder permits, 2021 to 2026: 18 panel upgrades, 3 heat pump installations, 2 EV charger installations13th most panel upgrade permits of 64 contractors in Boulder. That counts jobs, not quality.Our Boulder permit records cover September 2021 to September 2026. |
Records: City of Boulder permits.
Cost and timing
All panel upgrade jobs in Boulder: $2,500 to $7,500
Half of 959 city permits list an amount in this range. Permit amounts are often lower than what you pay.
- Panel upgrades in Boulder: $2,700 to $7,200 (728 permits)
How to read this range
Contractors write a job value on the permit form, and the city uses it to set the permit fee. It is not the contract price, and it is often lower than what you pay. A quarter of the permits list less than this range, and a quarter list more. Use it to see if a quote is in the normal range.
Permit value (not a price)
Their typical permit lists $2,750 (half list more, half less)
That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Boulder.
Get 2 or 3 written quotes.
Track record
4 jobs in the last 12 months, about the same as 4 the year before
Where they work most
- 8030212 jobs
- 803045 jobs
- 803053 jobs
- 803033 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Sep 16, 2026 | Heat pumpInstalling: 1-BOHA-36MTB-M18S 34K BTU 18SEER2 BOSCH HEAT PUMP 1-BGH97M080B3A TWO STAGE BOSCH GAS… | 80302 | $24,713 |
| May 18, 2026 | Heat pumpReplacing SE 2nd floor head with a 1 to 1, MITSUBISHI 6K BTU HEAT PUMP & INDOOR HEAD | 80302 | $3,742 |
| Mar 26, 2026 | EV chargerUpgrade service to 200a, install meter/main panel on exterior and 200a panel in garage | 80305 | $7,000 |
| Oct 3, 2025 | Heat pumpReplace gas water heater with a heat pump water heater | 80303 | $4,268 |
| Sep 2, 2025 | Panel upgradeReplace existing recalled Sylvania electric panel with new Square D main panel | 80304 | $8,000 |
| Jan 28, 2025 | Panel upgradeReplace exterior meter with meter/main panel | 80304 | $6,000 |
| Dec 13, 2024 | Panel upgradeAdd subpanel in garage off of main panel in garage to make space for replacement driveway heat… | 80304 | $8,000 |
| Dec 13, 2024 | Panel upgradeKitchen remodel and house lighting upgrade Kitchen: -Junction in attic and move 220v line for range | 80305 | $15,000 |
| Dec 19, 2023 | Panel upgradeReplace Zinsco 100 amp panel with new 100 amp panel | 80302 | $3,000 |
| Sep 7, 2023 | Panel upgradeUpgrade the electrical panel from 150 amps to 200 amps | 80304 | $4,000 |
| Jul 20, 2023 | Panel upgrade | 80302 | $2,500 |
| Jul 14, 2023 | Panel upgrade (×2, same day) | 80302 | $2,500 each |
| Jul 5, 2023 | Panel upgrade | 80302 | $2,500 |
| Jun 30, 2023 | Panel upgradeReplace the Zinsco panel with a new panel | 80302 | $2,500 |
| Jun 30, 2023 | Panel upgradeReplace the FPE 200 amp main electrical panel with a new Square D 200 amp panel | 80305 | $4,500 |
| Apr 4, 2023 | Panel upgrade (×3, same day) | 80302 | $2,000 each |
| Mar 31, 2023 | Panel upgradeReplace the electrical panel | 80303 | $4,000 |
| Feb 28, 2023 | EV chargerUpgrade the main electrical service to 200 amps. Add a car charger receptacle in the garage | 80304 | $5,200 |
| Dec 28, 2022 | Panel upgradeSwap out the existing electrical panel for a new one | 80302 | $1,500 |
| Dec 14, 2021 | Panel upgradeElectrical service upgrade to 200 amps | 80303 | $3,900 |
What to ask before you hire
About Couper Electric LLC
- Ask for their license number and check it with the state.
- Ask what the warranty covers and for how long, in writing.
- Search their name on the Better Business Bureau site, and read their reviews.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Couper Electric LLC
Five quick questions. We pass your request to Couper Electric LLC.
Request for Couper Electric LLC
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Couper Electric LLC. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 80302 and 80304
- Precision Plumbing & Heating
- Exceed Electrical Contracting
- Mr Electric of Boulder
- Table Mountain Electric Inc
- Contractor of Record Not Designated
- Platinum Electrical Services LLC
See all 64 panel upgrade electricians in Boulder, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.