contractors.fyi
Sign in

Singletrack Electric

EV charger installer working in Boulder.

  • Boulder publishes no contractor license list we can check

7 jobs on Boulder permits, 2023 to 2025: 3 EV charger installations, 3 panel upgrades, 1 heat pump installation. 29th most EV charger permits of 32 contractors in Boulder.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Boulder publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record7 jobs on Boulder permits, 2023 to 2025: 3 EV charger installations, 3 panel upgrades, 1 heat pump installation29th most EV charger permits of 32 contractors in Boulder. That counts jobs, not quality.Our Boulder permit records cover September 2021 to September 2026.Of their 3 EV charger permits, 1 mention a panel upgrade.

Records: City of Boulder permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $5,925 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What EV charger jobs cost in Boulder.

Get 2 or 3 written quotes.

Track record

Jobs per quarter

Q2 2023: 2 jobsQ2 2024: 2 jobsQ1 2025: 1 jobQ2 2025: 2 jobsBusiest: 2 jobsBusiest: 2 jobs20242025
Each bar is 3 months of permits. The tallest is 2 jobs, April to June 2023.

Where they work most

  • 803023 jobs
  • 803032 jobs
  • 803012 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
May 20, 2025EV chargerInstallation of an EV Charger80302$1,850
Apr 1, 2025Heat pumpThis is for a Bosch mini-split system with 2 outdoor units and 7 indoor units80303$18,761
Mar 26, 2025Panel upgradeUpgrade service to 200a main breaker panel with a meter bypass housing, grounding and bonding,…80303not stated
May 9, 2024EV chargerInstall Electric Vehicle Charger in garage of home80301not stated
Apr 5, 2024Panel upgradeReplacement of existing 100 amp service with new 100 amp service80301$2,500
May 24, 2023Panel upgradeInstallation of (6) Tesla GEN 3 EVSE wall chargers with power sharing in the parking garage, with…80302$10,000
May 24, 2023EV chargerInstallation of (6) Tesla GEN 3 EVSE wall chargers with power sharing in the parking garage, with…80302$10,000

What to ask before you hire

About Singletrack Electric

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Singletrack Electric

Five quick questions. We pass your request to Singletrack Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Singletrack Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 80302 and 80303

See all 32 EV charger installers in Boulder, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.