Titus Electrical Services
, mostly panel upgrade work
- 27 jobs in Boulder, 2021 to 2026
- Typical permit value $2,134
- 23 of 27 jobs are panel upgrades
Boulder publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.
Jobs by type of work
Most recent jobs
| Date | Work | ZIP |
|---|---|---|
| 2026-08-18 | Panel upgrade | 80301 |
| 2026-08-18 | EV charger | 80301 |
| 2026-07-24 | Panel upgrade | 80305 |
| 2026-02-04 | Panel upgrade | 80301 |
| 2026-02-04 | EV charger | 80301 |
| 2026-01-13 | Panel upgrade | 80302 |
| 2026-01-13 | Panel upgradeInstall a new automatic transfer switch in the downstairs utility room approximately 25 feet from the main electrical panel. ? Instal | 80305 |
| 2026-01-13 | EV charger200A MAIN SERVICE UPGRADE ? Remove the existing main breaker panel and replace it with a new exterior-rated 200A, 8-space/16-circuit | 80304 |
| 2025-10-15 | Panel upgradeRun dedicated 50a 240v circuit from basement panel, through soffit (using existing can light openings) to garage. ? Install NEMA 14-5 | 80304 |
| 2025-10-15 | EV chargerRun dedicated 50a 240v circuit from basement panel, through soffit (using existing can light openings) to garage. ? Install NEMA 14-5 | 80304 |
| 2025-07-03 | Panel upgradeinstall 60 amp sub-panel next to main panel. Move circuits into sub-panel to make space for new 20A 240V circuit. -Install 20amp 240v circu | 80304 |
| 2025-06-06 | Panel upgrade? We will install a new 2? GRC service mast, extending through the roof to meet code. ? We will provide and install a new 100-amp | 80303 |
More panel upgrade electricians near 80301
- Precision Plumbing & Heating
- Exceed Electrical Contracting
- Mr Electric of Boulder
- Klm Electric
- Table Mountain Electric Inc
- Contractor of Record Not Designated
Get quotes from up to 3 panel upgrade electricians
Tell us about the job. Within one business day we email you up to 3 contractors who do this work near your ZIP code, and pass your request to them. You decide who to hire.
We got your request
Within one business day we will email you up to 3 contractors who fit, and pass your request to them.
Paying for your panel upgrade
Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.
See all 65 panel upgrade electriciansRanked by jobs in Boulder