Amsumkeni
, mostly panel upgrade work
- 27 jobs in Chicago, 2021 to 2026
- Typical job $2,000
- 25 of 27 jobs are panel upgrades
Chicago publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.
Jobs by type of work
Most recent jobs
| Date | Work | ZIP |
|---|---|---|
| 2026-08-18 | Panel upgradeLINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 800 AMP SERVICE DISCONNECTING MEANS WITH 60 CIRCUITS. RECEPTACLE OUTLETS: 50 . LIGHTING OUTLETS: | |
| 2026-08-18 | Panel upgradeLINE VOLTAGE ELECTRICAL WORK. ADD 3 CIRCUITS TO EXISTING 100 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 3 . LIGHTING OUTLETS: 1. S | |
| 2026-07-22 | Panel upgradeLINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1 | |
| 2026-06-16 | Panel upgradeLINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 100 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 2 . LIGHTING OUTLETS: 2 | |
| 2025-09-09 | Panel upgradeLINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 6 . LIGHTING OUTLETS: 2. SPECIFIC LOCATION: | |
| 2025-02-06 | Panel upgradeLINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 10 CIRCUITS. RECEPTACLE OUTLETS: 20 . LIGHTING OUTLETS: | |
| 2023-11-25 | Panel upgradeUPGRADE ELECTRICAL SERVICE TO 100 AMPS. INSTALL NEW METER SOCKET AND THIRTY (30) CIRCUIT PANEL. INSTALL AUXILIARY AND COLD WATER GROUND. INS | |
| 2023-11-10 | Panel upgradeUPGRADE ONE (1) INCH PIPE RUN TO 1 1/4 " PIPE FOR 100 AMP PANEL IN BASEMENT APARTMENT. INSTALL PROPER SIZE AUXILIARY AND COLD-WATER GROUND U | |
| 2023-08-16 | Panel upgradeINSTALL SMOKE AND CARBON MONOXIDE DETECTORS. CLOSE OPEN JUNCTION BOXES. INSTALL EMERGENCY LIGHTS. INSTALL ADDITIONAL OUTLETS TO ELIMINATE EX | |
| 2023-07-21 | Panel upgradeUPGRADE ELECTRIC SERVICE WITH A NEW 100 AMP METER SOCKET AND 30 CIRCUIT PANEL. REMOVE OLD SIXTY (60) AMP METER SOCKET AND FUSE PANEL. INSTAL | |
| 2023-06-06 | SolarINSTALL 100 AMP PANEL AND CHARGING PORT(S) FOR ELECTRIC VEHICLES FOR SOLAR PANELS INSTALLATION ON TOP OF CAR PORT....ONLY | |
| 2023-06-06 | EV chargerINSTALL 100 AMP PANEL AND CHARGING PORT(S) FOR ELECTRIC VEHICLES FOR SOLAR PANELS INSTALLATION ON TOP OF CAR PORT....ONLY |
More panel upgrade electricians
- Robert Milchling
- Taylor Electric Company
- Sleeth Electric, Inc
- Contrast Electrical Services
- Continental Electrical Constru
- Hartmann Electric Company, Inc
Get quotes from up to 3 panel upgrade electricians
Tell us about the job. We pass your request to up to 3 contractors who do this work near your ZIP code. They contact you, and you decide.
Request sent
Up to 3 contractors will get your request. Expect a call or email from them in the next few days.
Paying for your panel upgrade
Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.
See all 502 panel upgrade electriciansRanked by jobs in Chicago