Brian K Petersen

, mostly panel upgrade work

  • 5 jobs in Chicago, 2021 to 2024
  • Typical job $15,000
  • All 5 jobs are panel upgrades

Chicago publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.

Jobs by type of work

Most recent jobs

DateWorkZIPStated value
2024-03-10Panel upgradeREMOVE AND REPLACE EXISITNG 100A OH SERVICE WITH NEW 200A, NEW 2G METER, NEW BREAKER PANELS IN BASEMENT, NEW GEC TO WATER MAIN$2,000
2022-07-25Panel upgradeVERIZON#126922 REMOVE AND INSTALL 6 NEW PANEL STYLE ANTENNAS$15,000
2022-06-02Panel upgradeDISH NETWORK CHCHI00376A INSTALL 3 NEW PANEL STYLE ANTENNAS, 6 NEW RADIOS AND 1 NEW HYBRID CABLE. NEW EQUIPMENT PLATFORM, EQUIPMENT CABINET $16,000
2021-11-09Panel upgradeTMOBILE CH10027A REMOVE AND REPLACE 6 PANEL STYLE ANTENNAS AND RRUS. INSTALL NEW HPL3 CABINET WITH ADJACENT BATTERY BACKUP CABINET. UTILIZIN$15,000
2021-09-28Panel upgradeTMOBILE SPRINT RETAIN CH80452A/CH52XC271 - REMOVE (1) AC PANEL - REMOVE (2) AC UNITS - REMOVE (3) SPRINT EQUIPMENT RACKS - REMOVE DISCONNECT$16,000

More panel upgrade electricians

Get quotes from up to 3 panel upgrade electricians

Tell us about the job. We pass your request to up to 3 contractors who do this work near your ZIP code. They contact you, and you decide.

When do you want to start?

Request sent

Up to 3 contractors will get your request. Expect a call or email from them in the next few days.

Paying for your panel upgrade

Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.

Circuit breakers in a neatly wired electrical panelSee all 502 panel upgrade electriciansRanked by jobs in Chicago