contractors.fyi
Sign in

Continental Electrical Constru

Panel upgrade electrician based in Oak Brook.

  • License active

22 jobs on Chicago permits, 2022 to 2026: 16 panel upgrades, 5 EV charger installations, 1 solar installation. 103rd most panel upgrade permits of 460 contractors in Chicago.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ECC96732, active in the city's records on Oct 2, 2026Electrical Contractor (General)We found this license by the business name. No other active license has that name.Checks out
Jobs on record22 jobs on Chicago permits, 2022 to 2026: 16 panel upgrades, 5 EV charger installations, 1 solar installationThey are based in Oak Brook. Work outside Chicago is not in these records.103rd most panel upgrade permits of 460 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: the city Department of Buildings and City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $143,176 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, panel upgrade permits usually take same day to be issued

How long panel upgrade jobs take.

Track record

8 jobs in the last 12 months, up from 4 the year before

Q2 2022: 1 jobQ2 2023: 1 jobQ3 2023: 2 jobsQ2 2024: 6 jobsQ1 2025: 1 jobQ2 2025: 2 jobsQ3 2025: 1 jobQ4 2025: 3 jobsQ1 2026: 1 jobQ2 2026: 4 jobsBusiest: 6 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, April to June 2024. Across Chicago, all contractors together had 8% more panel upgrade jobs in the last 12 months than in the 12 months before.

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
Jun 26, 2026Panel upgradeLine voltage electrical work$420,000
May 29, 2026Panel upgrade$60,100
Apr 22, 2026Panel upgrade$60,000
Apr 22, 2026EV charger$60,000
Feb 20, 2026Panel upgrade$141,285
Dec 30, 2025Panel upgrade$145,067
Oct 9, 2025Panel upgrade$1,865
Oct 9, 2025EV charger$1,865
Aug 12, 2025Panel upgrade$37,576
May 21, 2025Panel upgrade$585,000
Apr 3, 2025Panel upgrade$629,664
Mar 31, 2025Panel upgrade$435,961
May 6, 2024Panel upgradeInstallation of evse infrastructure system: 600a dp, (9x) 45kva xmfrs, (9x) 200a panels$271,590
May 6, 2024EV chargerInstallation of evse infrastructure system: 600a dp, (9x) 45kva xmfrs, (9x) 200a panels$271,590
Apr 16, 2024Panel upgradeFloor#2. installation of (2) 60 amp circuits for (2) chargers from existing ev panel$6,000
Apr 16, 2024EV chargerFloor#2. installation of (2) 60 amp circuits for (2) chargers from existing ev panel$6,000
Apr 10, 2024Panel upgradeFloors#1-12. install new panels for new it cabinets$2,200,000
Apr 10, 2024Panel upgradeFloors#2-12. install new panels for new it cabinets$1,900,000
Aug 15, 2023Panel upgradeFurnish & install (32) waps, (1) 48x port patch panel, (1) 24x port patch panel, (3) wireminders,…$25,000
Jul 13, 2023SolarRegular monthly maintenance, july-dec 2023 job #432-892 target cc; mgmtnot stated
May 7, 2023EV chargerNo details on the permit$3,105
Apr 28, 2022Panel upgradeService upgrade$1,000

What to ask before you hire

About Continental Electrical Constru

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Continental Electrical Constru

Five quick questions. We pass your request to Continental Electrical Constru.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Continental Electrical Constru. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 460 panel upgrade electricians in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.