contractors.fyi
Sign in

E.j. Electric

Panel upgrade electrician based in Chicago.

  • License active

52 panel upgrade jobs on Chicago permits, 2021 to 2025. 30th most panel upgrade permits of 460 contractors in Chicago.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ECC68596, active in the city's records on Oct 2, 2026Electrical Contractor (General)We found this license by the business name. No other active license has that name.Checks out
Jobs on record52 panel upgrade jobs on Chicago permits, 2021 to 2025Every permit we have for them is panel upgrade.30th most panel upgrade permits of 460 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: the city Department of Buildings and City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $4,200 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Kitchen jobs alone: typical permit $2,500 (5 permits, a small sample). What panel upgrade jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, panel upgrade permits usually take same day to be issued

How long panel upgrade jobs take.

Track record

0 jobs in the last 12 months, down from 10 the year before

Q3 2021: 1 jobQ4 2021: 5 jobsQ1 2022: 4 jobsQ2 2022: 3 jobsQ3 2022: 2 jobsQ4 2022: 7 jobsQ1 2023: 3 jobsQ2 2023: 5 jobsQ3 2023: 5 jobsQ4 2023: 1 jobQ1 2024: 2 jobsQ2 2024: 1 jobQ3 2024: 3 jobsQ4 2024: 3 jobsQ1 2025: 2 jobsQ2 2025: 3 jobsQ3 2025: 2 jobsBusiest: 7 jobsLatest: 2 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 7 jobs, October to December 2022. Across Chicago, all contractors together had 8% more panel upgrade jobs in the last 12 months than in the 12 months before.

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkOn the permit form
Sep 11, 2025Panel upgrade$3,500
Jul 14, 2025Panel upgrade$2,500
May 30, 2025Panel upgrade$2,500
Apr 7, 2025Panel upgrade$3,500
Apr 3, 2025Panel upgrade$3,500
Feb 12, 2025Panel upgrade$5,000
Jan 2, 2025Panel upgrade$4,500
Nov 18, 2024Panel upgrade$3,500
Nov 8, 2024Panel upgrade$3,500
Oct 20, 2024Panel upgrade$2,500
Aug 31, 2024Panel upgradeTotal three meters one for public & 200amp service upgrade on rear add ten new circuits$4,000
Aug 27, 2024Panel upgradeTotal three meters one for public and 200 amp service upgrade on rear$2,500
Aug 15, 2024Panel upgrade$2,500
May 14, 2024Panel upgradeTotal one meter and 100amp service upgrade on rear no new circuits$5,200
Feb 16, 2024Panel upgradeUpgrade circuit breaker panel to 20 circuit toggle type, add two circuits in garage$2,500
Jan 17, 2024Panel upgrade$6,500
Oct 30, 2023Panel upgrade**electrical only permit**total seven meters one for public and 400amp service upgrade on rear no…$15,000
Aug 18, 2023Panel upgradeTotal three meters one for public and two hundred amp service upgrade on rear add twenty new…$5,200
Jul 28, 2023Panel upgrade$4,500
Jul 18, 2023Panel upgradeUpgrade existing circuit breaker panel, add gfis and smoke dictators as required, upgrade…$2,500
Jul 18, 2023Panel upgrade$4,500
Jul 12, 2023Panel upgradeTotal three meters one for public and 200amp service up grade on rear no new circuits$4,500
Jun 20, 2023Panel upgradeT0tal three meters one for public and 200amp service upgrade on rear no new circuits$4,200
Jun 20, 2023Panel upgradeTo replace four arc defective fault breakers with 20amp breakers & correct double lugging in…$1,500
Jun 4, 2023Panel upgradeT0tal three meters one for public and 200amp service upgrade on rear no new circuits$4,200
May 16, 2023Panel upgradeTotal four meters one for public & 200amp service upgrade on rear add five new circuits for third…$4,500
Apr 17, 2023Panel upgradeTotal four meters one for public and 200amp service up grade on rear, no new circuits re-locare…$4,500
Mar 7, 2023Panel upgrade200amp service upgrade three meters one for public add ten new circuits$2,500
Feb 20, 2023Panel upgradeUnit #523, remove existing plug fuse box, located near kitchen install new twelve circuit, circuit…$1,600
Jan 6, 2023Panel upgradeRemove existing plug fuse box located near kitchen, install new twelve circuit, circuit breaker…$2,500
Dec 22, 2022Panel upgradeRemove existing plug fuse box located in kitchen area make adjustment to opening, install new…$2,300
Nov 15, 2022Panel upgradeTotal four meters one for public & 200amp service upgrade on the rear add twenty new circuits$8,200
Oct 26, 2022Panel upgradeTotal three meters & 200amp service upgrade on rear no new circuits$4,500
Oct 25, 2022Panel upgradeTotal one meter & 100amp service upgrade on rear nu new circuits$3,700
Oct 11, 2022Panel upgrade (×2, same day)Total one meter & 100amp service upgrade on rear no new circuits$4,000 each
Oct 9, 2022Panel upgradeBack porch install light fixtures at each level with switch next to entry door basement switch…$3,200
Aug 2, 2022Panel upgradeRemove old cloth wire pull in new #12-thwn copper wire for basement, 1st., 2nd,& attic, update…$7,000
Jul 1, 2022Panel upgradeTotal one meter and 100amp service upgrade on rear, add twenty new circuits, remove old cloth…$6,500
Jun 28, 2022Panel upgrade$4,800
May 19, 2022Panel upgrade$2,600

What to ask before you hire

About E.j. Electric

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from E.j. Electric

Five quick questions. We pass your request to E.j. Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to E.j. Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 460 panel upgrade electricians in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.