Meco Electric Co

, mostly panel upgrade work

  • 6 jobs in Chicago, 2022 to 2025
  • Typical job $14,000

Chicago publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.

Jobs by type of work

Most recent jobs

DateWorkZIPStated value
2025-08-18Panel upgradeLINE VOLTAGE ELECTRICAL WORK. ADD 6 CIRCUITS TO EXISTING 100 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 6 . LIGHTING OUTLETS: 24. $50,000
2025-06-18Panel upgradeLINE VOLTAGE ELECTRICAL WORK. ADD 1 CIRCUITS TO EXISTING 3000 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. $525,000
2025-03-28Panel upgradeLINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 800 AMP SERVICE DISCONNECTING MEANS WITH 6 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1$20,000
2024-07-09Panel upgradeCORRECT SERVICE GROUNDING, REPLACE OVERHEAD LINE FROM THE BUILDING TO THE GARAGE, PROVIDE BONDING, REMOVE EXISTING PANEL GROUND WIRING, REMO$8,000
2023-05-18Panel upgradeREPLACE METER SOCKET FROM A 2 GANG TO A 3 GANG UNIT, FOR PUBLIC METER, INSTALL 100 A FEED TO THE EXISTING PANEL FOR THE BUILDING. THE EXISTI$2,000
2022-07-06Panel upgradeINSTALL A 60 A SINGLE PHASE SUB PANEL IN THE GARAGE, PROVIDE 4 OUTLETS, 2 LIGHTS, 2 CIRCUITS$1,200

More panel upgrade electricians

Get quotes from up to 3 panel upgrade electricians

Tell us about the job. We pass your request to up to 3 contractors who do this work near your ZIP code. They contact you, and you decide.

When do you want to start?

Request sent

Up to 3 contractors will get your request. Expect a call or email from them in the next few days.

Paying for your panel upgrade

Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.

Circuit breakers in a neatly wired electrical panelSee all 502 panel upgrade electriciansRanked by jobs in Chicago