contractors.fyi
Sign in

Moody Bible Institute

Panel upgrade electrician based in Chicago.

  • License active

7 panel upgrade jobs on Chicago permits, 2022 to 2024. 211th most panel upgrade permits of 460 contractors in Chicago.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ECX16918, active in the city's records on Oct 2, 2026Electrical Contractor (General)We found this license by the business name. No other active license has that name.Checks out
Jobs on record7 panel upgrade jobs on Chicago permits, 2022 to 2024Every permit we have for them is panel upgrade.211th most panel upgrade permits of 460 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: the city Department of Buildings and City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,400 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, panel upgrade permits usually take same day to be issued

How long panel upgrade jobs take.

Track record

Jobs per quarter

Q1 2022: 1 jobQ2 2022: 3 jobsQ3 2023: 1 jobQ3 2024: 2 jobsBusiest: 3 jobsLatest: 2 jobs202220232024
Each bar is 3 months of permits. The tallest is 3 jobs, April to June 2022.

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
Sep 13, 2024Panel upgradeReplace 36 2by2 fluorescent fixtures with 2by2 flat panel led fixtures in the basement hallway$2,268
Aug 5, 2024Panel upgradeReplace 2' by 4' fluorescent fixtures with 2' by 2' flat panel led fixtures$2,400
Aug 30, 2023Panel upgradeReplace 21 2' by 2' fluorescent fixtures with led flat panel fixtures$2,400
May 27, 2022Panel upgrade2nd floor replaced a 2x2 fluorescent fixture with an led flat panel fixturenot stated
May 27, 2022Panel upgradeRemove 8 2'x4' fluorescent fixtures and replaced them with 2'x2' led flat panelsnot stated
May 27, 2022Panel upgradeRemove 4 2' by 2' fluorescent fixtures and replace them with 2 2 ' by 2' led flat panelsnot stated
Mar 31, 2022Panel upgradeRemove 15 2' by 4' fluorescent fixtures and replace them with 10 2' by 2' led flat panel fixturesnot stated

What to ask before you hire

About Moody Bible Institute

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Moody Bible Institute

Five quick questions. We pass your request to Moody Bible Institute.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Moody Bible Institute. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 460 panel upgrade electricians in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.