contractors.fyi
Sign in

Opal Energy Group LLC

Solar installer based in Dunellen.

  • License active

12 solar system jobs on Chicago permits, 2025 to 2026. 44th most solar system permits of 69 contractors in Chicago.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ECC96578, active in the city's records on Oct 2, 2026Electrical Contractor (General)We found this license by the business name. No other active license has that name.Checks out
Jobs on record12 solar system jobs on Chicago permits, 2025 to 2026Every permit we have for them is solar system.They are based in Dunellen. Work outside Chicago is not in these records.44th most solar system permits of 69 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: the city Department of Buildings and City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $86,400 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What solar system jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, solar system permits usually take 8 days to be issued

How long solar system jobs take.

Track record

4 jobs in the last 12 months, down from 8 the year before

Q2 2025: 1 jobQ3 2025: 7 jobsQ4 2025: 2 jobsQ1 2026: 2 jobsBusiest: 7 jobsLatest: 2 jobs2026
Each bar is 3 months of permits. The tallest is 7 jobs, July to September 2025. Across Chicago, all contractors together had 8% fewer solar system jobs in the last 12 months than in the 12 months before.

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
Jan 13, 2026SolarNo details on the permit$103,680
Jan 9, 2026Solar, 38.4 kWNew rooftop solar installation of 80 panels at 38.4 kw dc and reconnection of any existing…$57,600
Oct 23, 2025Solar$143,370
Oct 15, 2025Solar$49,560
Sep 19, 2025SolarNo details on the permit$121,680
Aug 29, 2025SolarNo details on the permit$120,960
Jul 30, 2025Solar, 44.15 kW$66,240
Jul 22, 2025SolarNo details on the permit$122,400
Jul 16, 2025SolarNo details on the permit$106,560
Jul 16, 2025SolarNo details on the permit$69,120
Jul 14, 2025Solar$49,560
May 2, 2025Solar, 23.04 kW$34,560

What to ask before you hire

About Opal Energy Group LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Opal Energy Group LLC

Five quick questions. We pass your request to Opal Energy Group LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Opal Energy Group LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers

See all 69 solar installers in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.