contractors.fyi
Sign in

Polly Electric Company

Panel upgrade electrician based in Elmhurst.

  • License active

20 panel upgrade jobs on Chicago permits, 2021 to 2026. 77th most panel upgrade permits of 460 contractors in Chicago.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ECC24205, active in the city's records on Oct 2, 2026Electrical Contractor (General)We found this license by the business name. No other active license has that name.Checks out
Jobs on record20 panel upgrade jobs on Chicago permits, 2021 to 2026Every permit we have for them is panel upgrade.They are based in Elmhurst. Work outside Chicago is not in these records.77th most panel upgrade permits of 460 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: the city Department of Buildings and City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,500 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, panel upgrade permits usually take same day to be issued

How long panel upgrade jobs take.

Track record

Jobs per quarter

Q4 2021: 6 jobsQ2 2022: 2 jobsQ3 2022: 2 jobsQ4 2022: 4 jobsQ2 2023: 1 jobQ3 2023: 1 jobQ4 2023: 1 jobQ4 2024: 1 jobQ3 2025: 1 jobQ3 2026: 1 jobBusiest: 6 jobsLatest: 1 job20222023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, October to December 2021.

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
Jul 16, 2026Panel upgradeLine voltage electrical work$1,000
Jul 17, 2025Panel upgradeLine voltage electrical work$4,500
Nov 21, 2024Panel upgradeLine voltage electrical work$2,800
Oct 29, 2023Panel upgradeInstall one 200 amp service and replace pipe and wire in basement and forst floor$1,800
Aug 29, 2023Panel upgradeInstall 200 amp service 4 meters one of which is a public meter$9,800
May 12, 2023Panel upgradeInstall 200 amp service with 5 meters one being a public meter$3,000
Dec 16, 2022Panel upgradeInstall a 200 amp service one public meter and two tennant meters$2,500
Dec 9, 2022Panel upgradeInstall a 200 amp service one public meter and two tennant meters$2,800
Oct 21, 2022Panel upgradeInstall 100 amp service$1,500
Oct 21, 2022Panel upgradeInstall 100 amp service with 3 meters (one public and 2 private)$2,000
Sep 1, 2022Panel upgradeReplace existing 100 am panel and replace existing outlets and switches$2,200
Aug 23, 2022Panel upgradeReplace existing 100 amp circuit breaker panel with a new one$1,800
Jun 22, 2022Panel upgradeUpgrade existing service to 100 amp service and rewire two bedrooms and one bathroom$2,300
May 24, 2022Panel upgradeInstall 100 amp service replace existing meters (2) receptacles switches and fixtures where needed…$7,500
Dec 16, 2021Panel upgradeInstall 200 amp service with three meters one public two units$2,200
Nov 30, 2021Panel upgradeInstall 100 amp service and replace existing receptacles switches and light fixtures as needed$2,500
Nov 29, 2021Panel upgradeInstall 100 amp service$2,500
Oct 21, 2021Panel upgradeInstall 200 amp service three units one public totalling 4 meters$2,800
Oct 12, 2021Panel upgradeInstall 100 amp service three meters one public and two apartments$1,800
Oct 2, 2021Panel upgradeInstall electrical wiring around basement and first and second floors$8,000

What to ask before you hire

About Polly Electric Company

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Polly Electric Company

Five quick questions. We pass your request to Polly Electric Company.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Polly Electric Company. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 460 panel upgrade electricians in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.