contractors.fyi
Sign in

Terrius Winters

Panel upgrade electrician based in Chicago.

  • License active

37 panel upgrade jobs on Chicago permits, 2021 to 2026. 41st most panel upgrade permits of 460 contractors in Chicago.

What the public records show

From the city's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License ECC94348, active in the city's records on Oct 2, 2026Electrical Contractor (General)We found this license by the business name. No other active license has that name.Checks out
Jobs on record37 panel upgrade jobs on Chicago permits, 2021 to 2026Every permit we have for them is panel upgrade.41st most panel upgrade permits of 460 contractors in Chicago. That counts jobs, not quality.Our Chicago permit records cover September 2021 to September 2026.

Records: the city Department of Buildings and City of Chicago permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Chicago.

Get 2 or 3 written quotes.

Permit wait

Across Chicago, panel upgrade permits usually take same day to be issued

How long panel upgrade jobs take.

Track record

3 jobs in the last 12 months, down from 9 the year before

Q4 2021: 2 jobsQ1 2022: 1 jobQ2 2022: 2 jobsQ3 2022: 3 jobsQ4 2022: 1 jobQ1 2023: 2 jobsQ2 2023: 2 jobsQ3 2023: 2 jobsQ4 2023: 2 jobsQ1 2024: 4 jobsQ2 2024: 2 jobsQ3 2024: 2 jobsQ4 2024: 3 jobsQ1 2025: 3 jobsQ2 2025: 2 jobsQ3 2025: 1 jobQ4 2025: 1 jobQ1 2026: 1 jobQ2 2026: 1 jobBusiest: 4 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, January to March 2024. Across Chicago, all contractors together had 8% more panel upgrade jobs in the last 12 months than in the 12 months before.

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
May 29, 2026Panel upgradenot stated
Mar 26, 2026Panel upgrade$2,800
Nov 25, 2025Panel upgradeSelf-cert 2019$950,000
Aug 12, 2025Panel upgrade$2,000
Apr 27, 2025Panel upgrade$1,800
Apr 3, 2025Panel upgrade$17,000
Mar 20, 2025Panel upgradeLine voltage electrical work$1,200
Mar 5, 2025Panel upgrade$2,000
Jan 6, 2025Panel upgradeLine voltage electrical work$1,900
Dec 24, 2024Panel upgrade$5,000
Nov 5, 2024Panel upgrade$2,000
Oct 16, 2024Panel upgrade$5,000
Aug 20, 2024Panel upgradeInstall 3 gang meter socket with three panels to existing circuits onlynot stated
Jul 16, 2024Panel upgradeCorrect electrical violation sent by city of chicago install public panel and strap electrical…not stated
Jun 25, 2024Panel upgradeRemove single gang meter socket and install two game meter socket with 20 circuit panel onlynot stated
May 7, 2024Panel upgradeInstall 200 amp service to existing location install fixtures,switches receptacles for a drywallnot stated
Mar 13, 2024Panel upgradeInstall 4 gang meter socket and 4 100a 20 circuit panel onlynot stated
Feb 17, 2024Panel upgradeInstall 100amp service with 20 circuit electrical panel to existing location onlynot stated
Jan 18, 2024Panel upgradeInstall 100a single meter service and 100a 20 circuits panel to existing location . 8357 rearnot stated
Jan 18, 2024Panel upgradeInstall 200a 3 gang service with 3 100a 20 circuit panel .8357 frontnot stated
Dec 1, 2023Panel upgradeInstall 200 amp 3 gang meter socket to existing locationnot stated
Oct 11, 2023Panel upgradeReplace existing 100a service with 200a service .install 200a 30 circuit panel to existing circuitsnot stated
Sep 5, 2023Panel upgradeReplace (8) panels to existing circuits with 100a (8) 16 circuits electrical panelsnot stated
Aug 11, 2023Panel upgradeInstall 200a 3 gang meter service 3 panels to existing circuitsnot stated
Jun 27, 2023Panel upgradeReplace panel to existing circuits, replace meter socket to existing replace exit/emergency light…not stated
May 30, 2023Panel upgradeInstall 200a service with disconnect to existing 200a panelnot stated
Mar 7, 2023Panel upgradeInstall temporary hunter amp service single meter onlynot stated
Jan 20, 2023Panel upgradeInstall 200 amp 3 gang meter service and 3 100 ampnot stated
Nov 17, 2022Panel upgradeInstall outdoor meter socket to existing 200a service replace 5 electrical panels to existing…not stated
Sep 22, 2022Panel upgradeInstall 200a single meter service with 200a 30 circuit panel, 20 circuit subpanel onlynot stated
Jul 23, 2022Panel upgradeInstall additional circuit to garage, replace receptacle with single type and g.f.c.i type were-is-…not stated
Jul 11, 2022Panel upgradeRemount existing 100a 12 circuit panel with egcnot stated
Jun 29, 2022Panel upgradeInstall 3 gang meter socket with panel onlynot stated
Apr 14, 2022Panel upgradeInstall 100a service 30 circuit panel onlynot stated
Jan 27, 2022Panel upgradeRough in emt for receptacles , switches, light fixtures rewire existing circuits install 100amp…not stated
Dec 16, 2021Panel upgradeInstall a 200 amp service with a 40 circuit panel to existing replace 4 led fixtures to existingnot stated
Nov 14, 2021Panel upgradeReplace light fixtures, receptacles, switches$2,000

What to ask before you hire

About Terrius Winters

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Terrius Winters

Five quick questions. We pass your request to Terrius Winters.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Terrius Winters. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 460 panel upgrade electricians in Chicago, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.