contractors.fyi
Sign in

Action Solar

Solar installer working in Los Angeles. Licensed since 2022.

  • License active
  • Workers' comp on file

12 solar system jobs on Los Angeles permits, 2024 to 2026. 258th most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1089987, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2022
Jobs on record12 solar system jobs on Los Angeles permits, 2024 to 2026Every permit we have for them is solar system.258th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1089987 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

7 jobs in the last 12 months, up from 5 the year before

Q4 2024: 2 jobsQ1 2025: 3 jobsQ3 2025: 2 jobsQ4 2025: 2 jobsQ1 2026: 2 jobsQ3 2026: 1 jobBusiest: 3 jobsLatest: 1 job20252026
Each bar is 3 months of permits. The tallest is 3 jobs, January to March 2025.

Where they work most

  • 913422 jobs
  • 913042 jobs
  • 913521 job
  • 913311 job
  • 900321 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 2, 2026Solar(EPlan) PV1 for installation of roof mounted solar panels91352not stated
Jan 8, 2026Solar, 11.4 kW(EPlan) 20.09 kWDC /18.72 kWAC CEC PV 49 modules with 49 optimizers, 2 inverters 11.4 kW91342not stated
Jan 5, 2026Solar(EPlan) PV1 for installation of roof mounted solar panels91331not stated
Nov 6, 2025Solar, 38.4 kW91304not stated
Oct 16, 2025Solar, 11.4 kW(EPlan) 11.48 kWDC/10.53 kWAC PV system includes 28 modules with 28 optimizers and 1 central…91342not stated
Sep 30, 2025Solar, 38.4 kW91304not stated
Sep 26, 2025Solar, 38.4 kW90032not stated
Mar 7, 2025Solar, 38.4 kWInstallation of a roof-mounted Microinverter/AC module solar photovoltaic (PV) system, not…90016not stated
Feb 18, 2025Solar, 3.6 kW(PV1) Installation of a 5.1 kWDC/ 3.6 KW AC roof mounted PV system with (12) modules and (12)…91406not stated
Feb 12, 2025Solar, 11.9 kW(PV1) Installation of a 11.9kW DC/ 8.1kW AC roof mounted PV1 system with (28)…90068not stated
Dec 10, 2024SolarResidential rooftop solar install of 20 mirco inverters and 20 pv panelsThis project qualifies for…91364not stated
Oct 17, 2024Solar, 8.2 kWPV solar installation on an existing residential roof, system size 8.2 kW DC/ 5.8KW AC with 20…91367not stated

What to ask before you hire

About Action Solar

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Action Solar

Five quick questions. We pass your request to Action Solar.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Action Solar. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 91342 and 91304

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.