Action Solar
Solar installer working in Los Angeles. Licensed since 2022.
- License active
- Workers' comp on file
12 solar system jobs on Los Angeles permits, 2024 to 2026. 258th most solar system permits of 561 contractors in Los Angeles.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | License 1089987, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record. | Checks out |
| Workers' comp? | Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home. | On file |
| In business? | Licensed since 2022 | |
| Jobs on record | 12 solar system jobs on Los Angeles permits, 2024 to 2026Every permit we have for them is solar system.258th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026. |
Records: the state license board and City of Los Angeles permits.
State license board record
Last checked Oct 4, 2026. This may have changed. Check it on CSLB.
No complaints or citations on the board's public record.
Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1089987 on CSLB
Cost and timing
Solar in Los Angeles: $18,000 to $40,000
Half of 3,193 installs from January 2021 to December 2023 cost an amount in this range.
How to read this range
These are prices homeowners paid, as installers reported them to state programs. Lawrence Berkeley National Laboratory collects them in its Tracking the Sun data. A quarter paid less than this range, and a quarter paid more. The prices are before the federal tax credit.
Permit timeline
Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.
Track record
7 jobs in the last 12 months, up from 5 the year before
Where they work most
- 913422 jobs
- 913042 jobs
- 913521 job
- 913311 job
- 900321 job
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Sep 2, 2026 | Solar(EPlan) PV1 for installation of roof mounted solar panels | 91352 | not stated |
| Jan 8, 2026 | Solar, 11.4 kW(EPlan) 20.09 kWDC /18.72 kWAC CEC PV 49 modules with 49 optimizers, 2 inverters 11.4 kW | 91342 | not stated |
| Jan 5, 2026 | Solar(EPlan) PV1 for installation of roof mounted solar panels | 91331 | not stated |
| Nov 6, 2025 | Solar, 38.4 kW | 91304 | not stated |
| Oct 16, 2025 | Solar, 11.4 kW(EPlan) 11.48 kWDC/10.53 kWAC PV system includes 28 modules with 28 optimizers and 1 central… | 91342 | not stated |
| Sep 30, 2025 | Solar, 38.4 kW | 91304 | not stated |
| Sep 26, 2025 | Solar, 38.4 kW | 90032 | not stated |
| Mar 7, 2025 | Solar, 38.4 kWInstallation of a roof-mounted Microinverter/AC module solar photovoltaic (PV) system, not… | 90016 | not stated |
| Feb 18, 2025 | Solar, 3.6 kW(PV1) Installation of a 5.1 kWDC/ 3.6 KW AC roof mounted PV system with (12) modules and (12)… | 91406 | not stated |
| Feb 12, 2025 | Solar, 11.9 kW(PV1) Installation of a 11.9kW DC/ 8.1kW AC roof mounted PV1 system with (28)… | 90068 | not stated |
| Dec 10, 2024 | SolarResidential rooftop solar install of 20 mirco inverters and 20 pv panelsThis project qualifies for… | 91364 | not stated |
| Oct 17, 2024 | Solar, 8.2 kWPV solar installation on an existing residential roof, system size 8.2 kW DC/ 5.8KW AC with 20… | 91367 | not stated |
What to ask before you hire
About Action Solar
- Ask what the warranty covers and for how long, in writing.
Worth asking any solar installer
- Can you show me proof of liability insurance and your bond?
- What size system, which panels and inverter, and what will it make in a year?
- Is my roof good for 25 more years, and what if it needs work first?
- Who handles the permit and the utility's approval to turn it on?
Get a quote from Action Solar
Five quick questions. We pass your request to Action Solar.
Request for Action Solar
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Action Solar. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore solar installers near 91342 and 91304
See all 561 solar installers in Los Angeles, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.