contractors.fyi
Sign in

Dotz Inc

Solar installer based in Van Nuys. Licensed since 2017.

  • License active
  • Workers' comp on file

75 jobs on Los Angeles permits, 2023 to 2026: 53 solar installations, 10 ADUs, 8 remodels, 2 home additions, 2 roofing jobs. 101st most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1033830, active in the state's records on Sep 23, 2026General engineering, general building, electrical, heating and airNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2017
Jobs on record75 jobs on Los Angeles permits, 2023 to 2026: 53 solar installations, 10 ADUs, 8 remodels, 2 home additions, 2 roofing jobsThey are based in Van Nuys. Work outside Los Angeles is not in these records.101st most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1033830 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

8 jobs in the last 12 months, down from 45 the year before

Q3 2023: 1 jobQ4 2023: 3 jobsQ2 2024: 9 jobsQ3 2024: 10 jobsQ4 2024: 21 jobsQ1 2025: 6 jobsQ2 2025: 10 jobsQ3 2025: 8 jobsQ4 2025: 4 jobsQ2 2026: 1 jobQ3 2026: 2 jobsBusiest: 21 jobsLatest: 2 jobs202420252026
Each bar is 3 months of permits. The tallest is 21 jobs, October to December 2024.

Where they work most

  • 900036 jobs
  • 916015 jobs
  • 913355 jobs
  • 900165 jobs
  • 913644 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Jul 27, 2026RemodelCONVERT PORTION OF SFD AND NEW ADDITION TO ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33 (c) and (e).…91306$80,000
Jul 16, 2026ADUConvert (e) detached garage to an ADU (267 sf) per GC 6632390064$80,000
May 15, 2026RemodelMAJOR REMODEL & ADDITION TO (E) ONE-STORY SFD (NEW BLDG DIM: IRR. SHAPED 44'-10" x 54'-10"…91601$150,000
Dec 22, 2025SolarInstallation of roof-mounted Microinverter/AC module solar photovoltaic (PV) system interconnected…91364not stated
Nov 25, 2025ADUNew 2-story Accessory Dwelling Units (2-units) PER GCS 65852.290001$176,447
Oct 21, 2025SolarPV installation of roof mounted solar panels90064not stated
Oct 21, 2025Solar, 38.4 kW90064not stated
Sep 25, 2025Remodel, 163 sq ftAdd 15'-11" x 14'-11" and 163 sq ft to first floor and 33'-6" x 42'-6" on second floor of existing…90034$100,000
Sep 16, 2025Solar (×2, same day), 38.4 kW90001not stated
Aug 21, 2025AdditionCONVERT (E) GARAGE TO (N) ACCESSORY DWELLING UNIT PER LAMC 12.22A33(c)91335$105,000
Aug 21, 2025ADUCONVERT (E) GARAGE TO (N) ACCESSORY DWELLING UNIT PER LAMC 12.22A33(c)91335$105,000
Aug 12, 2025Solar, 38.4 kW91356not stated
Aug 12, 2025SolarInstallation of roof-mounted Microinverter/AC module solar photovoltaic (PV) system interconnected…90068not stated
Jul 22, 2025Solar, 38.4 kW90043not stated
Jun 23, 2025RemodelNfpa 13d fire sprinklers required90024$75,000
Jun 12, 2025Solar, 38.4 kW91403not stated
Jun 9, 2025ADUNEW DETACHED (2) ADUS PER CA Govt90731$450,000
Jun 4, 2025Solar, 38.4 kWInstallation of a roof-mounted central/string inverter solar photovoltaic (PV) system, not…91335not stated
May 7, 2025Solar, 30.1 kWNew PV1 installation for a single-family dwelling91316not stated
May 5, 2025Solar (×2, same day)90731not stated
Apr 22, 2025Solar, 9.46 kW[ePlan] New roof mounted solar PV1 system rated 9.46kW DC / 8.052kW AC with (22)…91364not stated
Apr 17, 2025Reroof, 90 squares (9,000 sq ft)Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq91335$18,000
Apr 8, 2025Solar12.04 kWDC PV 28 modules with microinverters91356not stated
Mar 18, 2025Solar91344not stated
Feb 26, 2025ADUNew fully electric, detached 11'10" x 33'9" accessory dwelling unit pe91335$40,336
Feb 18, 2025Solar, 8.8 kW91364not stated
Feb 13, 2025Solar, 6.45 kWInstall 6.45 kW DC roof mounted PV system91356not stated
Feb 6, 2025Solar, 38.4 kWInstallation of a roof-mounted central/string inverter solar photovoltaic (PV) system, not…91403not stated
Jan 9, 2025ADUNEW ONE-STORY 32' x 28' BUILDING FOR TWO ACCESSORY DWELLING UNITS PER90016$75,000
Dec 16, 2024Solar (×2, same day), 2.31 kWPv1 plan check for new roof mounted pv system90045not stated
Dec 16, 2024Solar, 38.4 kW91344not stated
Dec 10, 2024Solar, 38.4 kW91352not stated
Dec 4, 2024ADU, 280 sq ftCONVERT (E) ATTACHED GARAGE INTO JADU (280 SQFT) PER GCS 65852.2(e)(1)91606$150,000
Nov 27, 2024Solar, 38.4 kW90077not stated
Nov 26, 2024Remodel4 window(s). Window and door change-out (same size & type) for residential buildings90291$16,000
Nov 19, 2024Solar (×6, same day), 38.4 kW90003not stated
Nov 5, 2024Solar (×4, same day), 38.4 kW91602not stated
Nov 4, 2024Solar (×2, same day), 38.4 kW90016not stated
Nov 4, 2024Solar, 38.4 kW90025not stated
Oct 21, 2024Solar, 38.4 kW90402not stated

What to ask before you hire

About Dotz Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Dotz Inc

Five quick questions. We pass your request to Dotz Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Dotz Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 90003 and 91601

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.