contractors.fyi
Sign in

Evolution Energy

Solar installer working in Los Angeles. Licensed since 2010.

  • License active
  • Workers' comp on file

65 jobs on Los Angeles permits, 2020 to 2026: 64 solar installations, 1 panel upgrade. 87th most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 944493, active in the state's records on Sep 23, 2026General building, electricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2010
Jobs on record65 jobs on Los Angeles permits, 2020 to 2026: 64 solar installations, 1 panel upgrade87th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.Of their 64 solar system permits, 1 mention a battery.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 944493 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

29 jobs in the last 12 months, up from 20 the year before

Q4 2020: 1 jobQ3 2023: 2 jobsQ4 2023: 2 jobsQ1 2024: 2 jobsQ2 2024: 1 jobQ3 2024: 8 jobsQ4 2024: 4 jobsQ1 2025: 4 jobsQ2 2025: 5 jobsQ3 2025: 10 jobsQ4 2025: 13 jobsQ1 2026: 7 jobsQ2 2026: 4 jobsQ3 2026: 2 jobsBusiest: 13 jobs202120222023202420252026
Each bar is 3 months of permits. The tallest is 13 jobs, October to December 2025.

Where they work most

  • 913267 jobs
  • 900656 jobs
  • 914013 jobs
  • 900663 jobs
  • 900112 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Sep 22, 2026Solar, 38.4 kW90037not stated
Aug 20, 2026Solar, 38.4 kW90016not stated
May 26, 2026Solar, 38.4 kW91364not stated
May 18, 2026Solar, 38.4 kW91602not stated
Apr 20, 2026Solar, 38.4 kW90011not stated
Apr 17, 2026Solar, 38.4 kW91356not stated
Mar 30, 2026Solar, 38.4 kW90011not stated
Mar 18, 2026Solar, 38.4 kW91367not stated
Mar 5, 2026Solar, 38.4 kW91356not stated
Mar 4, 2026Solar, 38.4 kW90003not stated
Mar 3, 2026Solar91326not stated
Feb 2, 2026Solar, 7.2 kW[ePlan] New roof mounted solar PV1 system rated 7.2kW DC / 6.14kW AC with (16)…90025not stated
Jan 28, 2026Solar90065not stated
Dec 26, 2025Solar[ePlan][PV1] Installation of roof mounted solar panels90049not stated
Dec 26, 2025Solar, 38.4 kW91344not stated
Dec 26, 2025Solar, 38.4 kW90003not stated
Dec 18, 2025Solar, 38.4 kW90018not stated
Dec 10, 2025Solar, 6.9 kW[ePlan][PV1] Installation of a roof-mounted solar PV system91401not stated
Dec 5, 2025SolarInstallation of roof-mounted Central/String inverter solar photovoltaic (PV) system interconnected…91326not stated
Dec 4, 2025Solar, 38.4 kW90035not stated
Nov 17, 2025Solar, 38.4 kW91335not stated
Nov 5, 2025SolarInstallation of roof-mounted Central/String inverter solar photovoltaic (PV) system interconnected…90065not stated
Oct 28, 2025Solar91326not stated
Oct 5, 2025Solar, 38.4 kW91325not stated
Oct 5, 2025Solar (×2, same day), 38.4 kW90004not stated
Sep 29, 2025Solar, 6.44 kW[E-PLAN] 6.44kW DC, 5.16 kW AC PV (14) 460W modules (14) microinverters(2) 5kWh ENPHASE ESS units91411not stated
Sep 29, 2025Solar, 38.4 kW90291not stated
Sep 25, 2025Solar, 38.4 kW90018not stated
Sep 2, 2025Solar, 38.4 kW90066not stated
Sep 2, 2025Solar, 38.4 kW90065not stated
Aug 6, 2025Solar, 38.4 kW90065not stated
Jul 31, 2025Solar, 38.4 kW90045not stated
Jul 17, 2025Solar, 38.4 kW90230not stated
Jul 17, 2025Solar, 38.4 kW90066not stated
Jul 17, 2025Solar, 38.4 kW91436not stated
Jun 2, 2025Solar, 38.4 kW90039not stated
May 9, 2025Solar, 38.4 kW90032not stated
May 6, 2025Solar, 38.4 kW90039not stated
May 6, 2025Solar, 38.4 kW91304not stated
Apr 1, 2025Solar, 38.4 kW90064not stated

What to ask before you hire

About Evolution Energy

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Evolution Energy

Five quick questions. We pass your request to Evolution Energy.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Evolution Energy. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 91326 and 90065

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.