contractors.fyi
Sign in

Green Day Power

Solar installer based in Sacramento.

  • License 1038673 was not in the state's records on Sep 23, 2026

24 jobs on Los Angeles permits, 2020 to 2025: 23 solar installations, 1 panel upgrade.

We could not find an active or renewable license for this business in the state's records on Sep 23, 2026. Check the license with the state before you hire.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1038673 was not in the state's records on Sep 23, 2026Problem
Jobs on record24 jobs on Los Angeles permits, 2020 to 2025: 23 solar installations, 1 panel upgradeThey are based in Sacramento. Work outside Los Angeles is not in these records.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

Jobs per quarter

Q4 2020: 1 jobQ2 2023: 3 jobsQ3 2023: 9 jobsQ4 2023: 10 jobsQ2 2025: 1 jobBusiest: 10 jobs20212022202320242025
Each bar is 3 months of permits. The tallest is 10 jobs, October to December 2023.

Where they work most

  • 914062 jobs
  • 900392 jobs
  • 907442 jobs
  • 913312 jobs
  • 913431 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 27, 2025Solar[ePlan] new PV ballast system :(16) Modules of 395 W, Total: 6.32 kWdc(1) Inverter of 6600 W,…91406not stated
Dec 11, 2023Solar90039not stated
Dec 11, 2023Solar, 5.6 kWRoof mount 5.6 kW DC/ 4KW AC PV system with (14) 400W modules / micro-inverters, 1 combiner box,…91343not stated
Dec 6, 2023Solar, 38.4 kW91364not stated
Dec 6, 2023Solar, 38.4 kW90034not stated
Dec 5, 2023Solar, 38.4 kWInstallation of a roof-mounted central/string inverter solar photovoltaic (PV) system, not…91406not stated
Nov 21, 2023Solar, 2.0 kW[ePlan] New roof-mounted solar PV1 system with (5) modules/microinverters and a combiner box…90065not stated
Nov 17, 2023Solar, 38.4 kW90744not stated
Nov 1, 2023Solar90501not stated
Oct 31, 2023Solar[eplan] new rooftop mounted pv1 installation with (11) modules, (11) optimzers, (1) entral inverter…90062not stated
Oct 25, 2023Solar, 8.80 kWResidential solar install, roof mount - comp22 modules, 8.80 kw dc91423not stated
Sep 26, 2023Solar[eplan] new rooftop mounted pv1 installation with (21) modules, (21) optimizers, (1) central…90031not stated
Sep 26, 2023Solar, 7.9 kW[EPLAN] Roof mount 7.9 kW DC (6.0 kW AC) PV solar system with (20), (2) optimizers and (1) 6.0 kW…90011not stated
Sep 18, 2023Solar, 5.67 kW[eplan] Roof mount 5.67 kW PV solar system with (14) 405W modules, (14) micro-inverters, 125A…90018not stated
Sep 15, 2023Solar, 6.3 kW90026not stated
Sep 11, 2023Solar[E-Plan] NEW PV1 ROOF MOUNTED SOLAR SYSTEM WITH (12) VSUN405-108BMH-BB 405W MODULES, (12) ENPHASE…90043not stated
Jul 24, 2023Solar[ePlan] New roof-mounted solar PV1 system with (13) modules/optimizers and (1) central inverter…90744not stated
Jul 20, 2023Solar, 3.2 kW[eplan] pv1 new rooftop mounted system, system size is 3.2 kw dc/3 kw ac, system includes 8 modules…90044not stated
Jul 17, 2023Solar, 9.6 kW[eplan] pv1 Roof mount 9.6 kW DC/6.9 kw ac PV solar system with 24 400W modules, 24…91367not stated
Jul 17, 2023Solar, 2.77 kW[eplan] Install 2.77 kW DC / 2.0KW AC roof mounted system, addition to (E) PV system91352not stated
Jun 27, 2023Solar[ePlan] New roof-mounted solar PV1 system installed alongside existing PV system91331not stated
Jun 27, 2023Solar(EPlan) PV1 PC for installation of roof mounted solar panels91331not stated
Jun 5, 2023Solar, 10 kWInstallation of roof-mounted microinverter/AC module solar PV system, notexceeding a total AC…90039not stated
Nov 6, 2020Panel upgrade(e-plan) new pv1 roof-mounted installation for a 125 amp service90002not stated

What to ask before you hire

About Green Day Power

  • Do not hire until the contractor shows you an active license.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Green Day Power

Five quick questions. We pass your request to Green Day Power.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Green Day Power. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 91406 and 90039

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.