contractors.fyi
Sign in

Gs Solar Electric

Solar installer working in Los Angeles. Licensed since 2024.

  • License active
  • Workers' comp on file

25 solar system jobs on Los Angeles permits, 2024 to 2026. 168th most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1124701, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2024
Jobs on record25 solar system jobs on Los Angeles permits, 2024 to 2026Every permit we have for them is solar system.168th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1124701 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

20 jobs in the last 12 months, up from 5 the year before

Q4 2024: 1 jobQ2 2025: 2 jobsQ3 2025: 4 jobsQ4 2025: 2 jobsQ1 2026: 2 jobsQ2 2026: 2 jobsQ3 2026: 12 jobsBusiest: 12 jobs20252026
Each bar is 3 months of permits. The tallest is 12 jobs, July to September 2026.

Where they work most

  • 913524 jobs
  • 910424 jobs
  • 913243 jobs
  • 913443 jobs
  • 916012 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Sep 25, 2026Solar, 38.4 kW91324not stated
Sep 17, 2026Solar, 22 kW[ePlan] New roof mounted solar PV1 system rated 22kW DC / 19kW AC with (50) modules/microinverters…91324not stated
Sep 15, 2026Solar (×2, same day), 3.9 kWRoof mounted solar PV1 system with 9 modules and 5 microinverters91601not stated
Sep 15, 2026Solar, 38.4 kW91343not stated
Aug 25, 2026Solar, 38.4 kW91344not stated
Aug 21, 2026Solar, 38.4 kW91040not stated
Aug 17, 2026Solar, 38.4 kW91352not stated
Aug 17, 2026Solar, 38.4 kW91042not stated
Aug 5, 2026Solar, 6.88 kWRoof-mounted solar PV system.System size: 6.88kW DC, 6.08kW AC(16) 430W modules(16) 380VA…91344not stated
Aug 3, 2026Solar, 38.4 kW91352not stated
Jul 1, 2026Solar, 38.4 kW91304not stated
May 16, 2026Solar, 38.4 kW91352not stated
May 7, 2026Solar, 38.4 kW91352not stated
Mar 26, 2026Solar, 38.4 kW91344not stated
Jan 2, 2026Solar, 38.4 kW91342not stated
Nov 6, 2025Solar, 38.4 kW91042not stated
Nov 5, 2025SolarPV1. NEW SOLAR SYSTEM ON RESIDENTIAL ROOF-TOP. TOTAL AFFECTED AREA IS 4.00KWac91042not stated
Sep 30, 2025SolarPV1. NEW SOLAR SYSTEM ON A RESIDENTIAL ROOF-TOP. TOTAL AFFECTED AREA IS 15.22KWdc / 14.00KWac91325not stated
Sep 19, 2025Solar, 38.4 kWInstallation of a roof-mounted central/string inverter solar photovoltaic (PV) system, not…91042not stated
Aug 16, 2025SolarPV1. NEW SOLAR SYSTEM ON A RESIDENTIAL ROOF-TOP. TOTAL SYSTEM SIZE IS 2.0KWac91324not stated
Aug 12, 2025Solar, 38.4 kW91040not stated
Jun 25, 2025Solar (×2, same day)PV1. NEW SOLAR SYSTEM ON EXISTING RESIDENTIAL ROOF-TOP. TOTAL SYSTEM SIZE IS 4.13KWac91335not stated
Nov 8, 2024Solar, 6.354 kW[eplan] pv1 installation of 7.120 dc kw/6.354 kw ac solar pv16 pv modules with micro inverter…91326not stated

What to ask before you hire

About Gs Solar Electric

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Gs Solar Electric

Five quick questions. We pass your request to Gs Solar Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Gs Solar Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 91352 and 91042

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.