Homelink Solar
Solar installer working in Los Angeles. Licensed since 2024.
- License active
79 solar system jobs on Los Angeles permits, 2024 to 2026. 75th most solar system permits of 561 contractors in Los Angeles.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | License 1117534, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record. | Checks out |
| In business? | Licensed since 2024 | |
| Jobs on record | 79 solar system jobs on Los Angeles permits, 2024 to 2026Every permit we have for them is solar system.75th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.Of their 79 solar system permits, 6 mention a battery. |
Records: the state license board and City of Los Angeles permits.
State license board record
Last checked Oct 4, 2026. This may have changed. Check it on CSLB.
No complaints or citations on the board's public record.
Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1117534 on CSLB
Cost and timing
Solar in Los Angeles: $18,000 to $40,000
Half of 3,193 installs from January 2021 to December 2023 cost an amount in this range.
How to read this range
These are prices homeowners paid, as installers reported them to state programs. Lawrence Berkeley National Laboratory collects them in its Tracking the Sun data. A quarter paid less than this range, and a quarter paid more. The prices are before the federal tax credit.
Permit value (not a price)
Their typical permit lists $5,000 (half list more, half less)
That is the figure written on the permit form, which can be far from what you pay. Across Los Angeles, half of all solar system permits list $20,000 to $250,000. What solar system jobs cost in Los Angeles.
Get 2 or 3 written quotes.
Permit timeline
Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.
Track record
22 jobs in the last 12 months, down from 34 the year before
Where they work most
- 913256 jobs
- 913355 jobs
- 913445 jobs
- 913674 jobs
- 913644 jobs
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Sep 25, 2026 | Solar, 38.4 kW | 91367 | not stated |
| Sep 24, 2026 | Solar, 15.84 kWInstallation of new ground mount solar 15.84 KW DC with main breaker derated from 200A to 175A | 91352 | $5,000 |
| Sep 23, 2026 | Solar, 15.84 kW[E-Plan] PV1 installation of new ground mount solar 36 Modules/Inverters 15.84 KW DC/ 11.88KW AC… | 91352 | not stated |
| Sep 11, 2026 | Solar, 38.4 kW | 90019 | not stated |
| Sep 3, 2026 | Solar[EPLAN] NEW ROOF MOUNTED SOLAR PV1 SYSTEM WITH (30) MODULES AND 1 CENTRAL INVERTER/ ESS (1) Backup… | 90065 | not stated |
| Jul 15, 2026 | Solar[ePlan] Installation of a rooftop solar 3.52kWDC/2.56kWAC and 2 Tesla Powerwall 3… | 91343 | not stated |
| Jul 1, 2026 | Solar, 38.4 kW | 91335 | not stated |
| Jun 15, 2026 | Solar(EPlan) PV1 for installation of roof mounted solar panels | 91604 | not stated |
| Jun 8, 2026 | Solar, 38.4 kW | 91335 | not stated |
| May 25, 2026 | Solar, 38.4 kW | 91335 | not stated |
| Apr 7, 2026 | Solar(EPlan) PV1 for installation of roof mounted solar panels and installation of energy storage system | 90065 | not stated |
| Feb 2, 2026 | Solar[ePlan] new ESS & PV System roof mount, PV1, Scope of work include: (12) Modules of 405 W, Total:… | 90047 | not stated |
| Jan 26, 2026 | Solar[EPLAN] NEW ROOF MOUNTED SOLAR PV1 SYSTEM WITH (47) MODULES AND 2 CENTRALINVERTER ESS Powerwalls… | 91367 | not stated |
| Jan 16, 2026 | Solar(EPlan)New PV1 installation of roof mounted solar panels and installation of energy storage system… | 91325 | not stated |
| Jan 2, 2026 | Solar, 2.93 kW(EPlan) 3.96 kWDC/2.93 kW AC PV system (9) HYUNDAI HIS-T440NF(BK)MICRO-INVERTER (9) ENPHASE… | 90008 | not stated |
| Dec 19, 2025 | Solar, 38.4 kW | 90291 | not stated |
| Dec 18, 2025 | Solar, 38.4 kW | 91307 | not stated |
| Dec 4, 2025 | Solar, 38.4 kW | 91307 | not stated |
| Nov 26, 2025 | Solar, 8.36 kWInstallation of new rooftop solar 8.36 KW DC | 91325 | not stated |
| Nov 4, 2025 | Solar, 38.4 kW | 91325 | not stated |
| Oct 30, 2025 | Solar, 38.4 kW | 91356 | not stated |
| Oct 20, 2025 | Solar(EPlan) PV for installation of roof mounted solar panels | 90004 | not stated |
| Sep 8, 2025 | Solar, 38.4 kW | 91604 | not stated |
| Sep 4, 2025 | SolarInstallation of roof-mounted Central/String inverter solar photovoltaic (PV) system interconnected… | 91331 | not stated |
| Aug 26, 2025 | Solar, 38.4 kW | 91436 | not stated |
| Aug 14, 2025 | Solar, 38.4 kW | 90004 | not stated |
| Jul 24, 2025 | Solar(EPlan) PV for installation of roof mounted solar panels | 90034 | not stated |
| Jul 24, 2025 | Solar, 38.4 kW | 91326 | not stated |
| Jul 1, 2025 | Solar[ePlan][PV1] Installation of a new 17.2kWDC/23kWAC PV system with 43 modules and 2 Powerwall 3… | 91326 | not stated |
| Jun 4, 2025 | Solar, 38.4 kW | 91406 | not stated |
| May 27, 2025 | Solar, 38.4 kW | 90035 | not stated |
| May 19, 2025 | Solar, 38.4 kW | 91342 | not stated |
| May 15, 2025 | Solar, 38.4 kW | 91344 | not stated |
| Apr 17, 2025 | Solar, 38.4 kW | 91325 | not stated |
| Mar 24, 2025 | Solar, 38.4 kW | 91335 | not stated |
| Mar 24, 2025 | Solar, 38.4 kW | 91344 | not stated |
| Mar 14, 2025 | Solar, 38.4 kW | 91352 | not stated |
| Feb 27, 2025 | Solar (×2, same day), 38.4 kW | 91364 | not stated |
| Feb 27, 2025 | Solar, 38.4 kW | 90045 | not stated |
| Feb 17, 2025 | Solar, 38.4 kW | 91364 | not stated |
What to ask before you hire
About Homelink Solar
- Ask what the warranty covers and for how long, in writing.
Worth asking any solar installer
- Can you show me proof of liability insurance and your bond?
- What size system, which panels and inverter, and what will it make in a year?
- Is my roof good for 25 more years, and what if it needs work first?
- Who handles the permit and the utility's approval to turn it on?
Get a quote from Homelink Solar
Five quick questions. We pass your request to Homelink Solar.
Request for Homelink Solar
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Homelink Solar. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore solar installers near 91325 and 91335
- South West Builders
- Tesla Energy Operations Inc
- Sunpower Corporation Systems
- Enpower Star
- Green Conception Inc
- Solarmax Renewable Energy Provider Inc
See all 561 solar installers in Los Angeles, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.