contractors.fyi
Sign in

Jovic Construction

Solar installer working in Los Angeles. Licensed since 2006.

  • License active
  • Workers' comp on file

15 solar system jobs on Los Angeles permits, 2023 to 2025. 229th most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 874560, active in the state's records on Sep 23, 2026General building, solarNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2006
Jobs on record15 solar system jobs on Los Angeles permits, 2023 to 2025Every permit we have for them is solar system.229th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.Of their 15 solar system permits, 2 mention a battery.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 874560 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

2 jobs in the last 12 months, down from 5 the year before

Q2 2023: 1 jobQ3 2023: 1 jobQ4 2023: 2 jobsQ1 2024: 2 jobsQ2 2024: 2 jobsQ4 2024: 1 jobQ1 2025: 2 jobsQ2 2025: 1 jobQ3 2025: 1 jobQ4 2025: 2 jobsBusiest: 2 jobsBusiest: 2 jobs20242025
Each bar is 3 months of permits. The tallest is 2 jobs, October to December 2023.

Where they work most

  • 913113 jobs
  • 913242 jobs
  • 913262 jobs
  • 913041 job
  • 913311 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 22, 2025Solar(EPlan) PV1 for installation of roof mounted solar panels91324not stated
Oct 1, 2025Solar, 38.4 kW91311not stated
Jul 2, 2025Solar, 38.4 kW91304not stated
Jun 17, 2025SolarInstallation of roof-mounted Microinverter/AC module solar photovoltaic (PV) system interconnected…91331not stated
Mar 19, 2025Solar, 38.4 kW91325not stated
Feb 28, 2025Solar, 38.4 kW91406not stated
Oct 3, 2024Solar, 10.560 kW[eplan] new 10.560kw dc/8.376 kw ac roof mounted pv dc system (24) modules (24) microinverters (2)…91311not stated
Jun 21, 2024Solar, 11.0 kW[eplan] NEW 11.0KW DC / 8.7KW AC ROOF MOUNTED SOLAR PV1 SYSTEM WITH (25) MODULES/MICROINVERTERS,…91403not stated
Apr 3, 2024Solar, 38.4 kW91326not stated
Mar 25, 2024Solar, 38.4 kW91345not stated
Jan 3, 2024Solar, 13.64 kW[eplan] Install 13.64 kW DC/ 10.8KW AC roof mounted PV system with (31) modules / microinverters…90046not stated
Dec 5, 2023Solar, 38.4 kW91326not stated
Nov 8, 2023Solar[eplan] new roof-mounted solar pv1 system with bess90049not stated
Jul 24, 2023Solar, 11.400 kW[EPLAN] INSTALL NEW 11.400 kW (AC) ROOF MOUNTED SOLAR SYSTEM. INSTALL (30)VMODULES,…91324not stated
Jun 12, 2023Solar, 10 kWInstallation of roof-mounted microinverter/AC module solar PV system, notexceeding a total AC…91311not stated

What to ask before you hire

About Jovic Construction

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Jovic Construction

Five quick questions. We pass your request to Jovic Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Jovic Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 91311 and 91324

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.