contractors.fyi
Sign in

Lgcy Electric

Solar installer working in Los Angeles. Licensed since 2022.

  • License active
  • Workers' comp on file

181 solar system jobs on Los Angeles permits, 2023 to 2026. 29th most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1099095, active in the state's records on Sep 23, 2026General building, electrical, roofingNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2022
Jobs on record181 solar system jobs on Los Angeles permits, 2023 to 2026Every permit we have for them is solar system.29th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.Of their 181 solar system permits, 16 mention a battery.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1099095 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

99 jobs in the last 12 months, up from 32 the year before

Q3 2023: 2 jobsQ4 2023: 3 jobsQ1 2024: 7 jobsQ2 2024: 19 jobsQ3 2024: 21 jobsQ4 2024: 8 jobsQ1 2025: 2 jobsQ2 2025: 9 jobsQ3 2025: 12 jobsQ4 2025: 19 jobsQ1 2026: 14 jobsQ2 2026: 27 jobsQ3 2026: 38 jobsBusiest: 38 jobs202420252026
Each bar is 3 months of permits. The tallest is 38 jobs, July to September 2026.

Where they work most

  • 900448 jobs
  • 900477 jobs
  • 907447 jobs
  • 900627 jobs
  • 913427 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Sep 25, 2026Solar91367not stated
Sep 18, 2026Solar[ePlan] new PV System roof mount, PV1, Scope of work include: (11) Modules of 410 W, Total: 4.51…90041not stated
Sep 18, 2026Solar8 MODULES - ROOF MOUNT - 3.280 kWDC, 2.792 kWACSYSTEM SUMMARY:(N) 8- QCELLS: Q.PEAK DUO BLK…90023not stated
Sep 17, 2026Solar, 4.92 kW91326not stated
Sep 17, 2026Solar, 38.4 kW90044not stated
Sep 14, 2026Solar, 8.2 kW[ePlan] Roof mounted solar PV1 system with 20 AC modules and 1 combiner90066not stated
Sep 14, 2026Solar90033not stated
Sep 11, 2026Solar91311not stated
Sep 11, 2026Solar, 38.4 kW90043not stated
Sep 7, 2026Solar, 15.17 kW[E-PLAN] Installation of roof-mounted solar PV system into an existing PV system91406not stated
Sep 7, 2026Solar[ePlan] new PV System roof mount with existing PV system, PV1, Scope of work include: (10) Modules…90043not stated
Sep 7, 2026Solar (×2, same day), 38.4 kW90047not stated
Sep 5, 2026Solar, 4.9 kW[E-PLAN] Roof-mounted solar PV1 system91304not stated
Sep 4, 2026Solar, 38.4 kW91303not stated
Sep 2, 2026Solar, 38.4 kW91335not stated
Aug 27, 2026Solar(EPlan) Counter plan check for a new PV system, only a few fees covered under 26041-10000-22514…90066not stated
Aug 27, 2026Solar[ePlan][PV1] INSTALLATION OF 8.610 kWDC, 7.329 kWAC ROOF MOUNT PV SYSTEM INTO AN EXISTING PV…91335not stated
Aug 27, 2026Solar(EPlan) Revisions to express permit per inspector corrections90744not stated
Aug 17, 2026Solar91367not stated
Aug 12, 2026Solar(EPlan)New PV1 roof mounted solar system consisting of 10 AC modules, and 1 combiner box connected…90045not stated
Aug 12, 2026Solar90043not stated
Aug 11, 2026Solar[ePlan] Roof-mounted solar PV system 15 MODULES - ROOF MOUNT - 6.150 kWDC, 5.235 kWACSYSTEM…90004not stated
Aug 11, 2026Solar[E-Plan] PV1 20 MODULES - ROOF MOUNT - 8.200 kWDC, 7.320 kWACSYSTEM SUMMARY:(N) 20- QCELLS Q.PEAK…90025not stated
Aug 7, 2026Solar, 38.4 kW91311not stated
Aug 5, 2026Solar90501not stated
Aug 4, 2026Solar[eplan] roof mounted solar pv1 system90710not stated
Jul 30, 2026Solar90247not stated
Jul 29, 2026Solar90041not stated
Jul 29, 2026Solar[E-Plan] 10 MODULES - ROOF MOUNT - 4.100 kWDC, 3.490 kWACSYSTEM SUMMARY:(N) 10- QCELLS: Q.PEAK DUO…90045not stated
Jul 28, 2026Solar90043not stated
Jul 20, 2026Solar, 5.49 kW[ePlan] new PV System roof mount, PV1, Scope of work include: (15) Modules of 410 W, Total: 6.15…91344not stated
Jul 20, 2026Solar10 MODULES - ROOF MOUNT - 4.100 kWDC, 3.490 kWAC(N) 10- QCELLS Q.PEAK DUO BLK ML-G10.C1+/AC 410…90042not stated
Jul 20, 2026Solar, 8.2 kW[ePlan] Roof mounted solar PV1 system90065not stated
Jul 9, 2026Solar90065not stated
Jul 6, 2026Solar90047not stated
Jul 6, 2026Solar, 38.4 kW90062not stated
Jul 2, 2026Solar, 38.4 kW91311not stated
Jun 24, 2026Solar, 38.4 kW91307not stated
Jun 17, 2026Solar, 38.4 kW91402not stated
Jun 16, 2026Solar, 38.4 kW90008not stated

What to ask before you hire

About Lgcy Electric

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Lgcy Electric

Five quick questions. We pass your request to Lgcy Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Lgcy Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 90044 and 90047

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.