contractors.fyi
Sign in

Palmetto Solar Electric

Solar installer working in Los Angeles. Licensed since 2019.

  • License active
  • Workers' comp on file

31 jobs on Los Angeles permits, 2022 to 2024: 30 solar installations, 1 panel upgrade. 151st most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1048921, active in the state's records on Sep 23, 2026General building, electricalThe board's public record lists 3 items, 2 open. See the record below.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2019
Jobs on record31 jobs on Los Angeles permits, 2022 to 2024: 30 solar installations, 1 panel upgrade151st most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

State license board record

3 cases. 2 still open.
How to read this

The Contractors State License Board lists complaints it has sent for legal action, citations it has issued, and warning letters. A complaint or accusation is an allegation, not a finding. A citation is the board's finding that a rule was broken; the contractor can appeal it. Complaints closed in the contractor's favor are never listed. Most contractors have no items.

  • Open case: not provenAug 24, 2026 · Case S F 2024 7351

    The board sent this complaint for legal action on Aug 24, 2026. A complaint is an allegation. Nothing is proven yet.

    Charges listed: non-licensed Joint Venture; abandonment without legal excuse of any construction project; departure from trade standards, plans or specs;
    and 1 moreexceeded contract amount.
  • Open case: not provenJul 21, 2026 · Case N 2025 168

    The board filed an accusation on Jul 21, 2026. An accusation lists charges. The charges are not proven.

    Charges listed: departed from trade standards; violated building law - no permit; abandonment without legal excuse of any construction project;
    and 7 morelicense name style variation; willful or fraudulent act; contracted with non-licensee; failed to report the employment of a registered salesperson; HIC No notice title "three" or "five" "Day Right to Cancel"; non-licensed Joint Venture; misrepresentation to obtain contract.

    Read the accusation (CSLB PDF)

  • Warning letterAug 25, 2026 · Case N A 2025 3563

    The board sent a formal warning letter on Aug 25, 2026. A warning letter has no fine.

    Listed: failed to comply with Contractor's License Law; failed to comply - no solar disclosure document

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1048921 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

Jobs per quarter

Q2 2022: 1 jobQ2 2023: 6 jobsQ3 2023: 9 jobsQ4 2023: 5 jobsQ1 2024: 5 jobsQ2 2024: 2 jobsQ3 2024: 3 jobsBusiest: 9 jobs20232024
Each bar is 3 months of permits. The tallest is 9 jobs, July to September 2023.

Where they work most

  • 900114 jobs
  • 913443 jobs
  • 900623 jobs
  • 900642 jobs
  • 900182 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 3, 2024Solar, 38.4 kW91344not stated
Jul 3, 2024Solar, 38.4 kW91406not stated
Jul 2, 2024Solar, 38.4 kW90064not stated
Apr 15, 2024Solar, 38.4 kW90043not stated
Apr 8, 2024Solar, 38.4 kW90064not stated
Mar 26, 2024Solar, 38.4 kW90018not stated
Mar 22, 2024Solar, 12.96 kW[eplan] Install 12.96 kW DC roof mounted PV system91356not stated
Feb 29, 2024Solar, 38.4 kW91367not stated
Feb 26, 2024Solar[ePlanLA] Install roof mounted solar pv array to be interconnected to existing electrical system91343not stated
Jan 2, 2024Solar, 10.935 kW[ePlanLA] Roof mount PV 10.935kW DC grid tied system91335not stated
Nov 29, 2023Solar, 15.39 kW[eplan] PV1 plan check for Installation of a residential, roof mounted 15.39KW-DC/11.4 KW AC system…91344not stated
Nov 29, 2023Solar, 38.4 kW91306not stated
Nov 13, 2023Solar, 4.050 kWInstallation of a residential, roof mounted 4.050KW-DC / 3.8KW AC system with (10) modules /…91335not stated
Nov 8, 2023Solar, 19.035 kW[eplan] pv1 plan check for new roof mounted pv system91344not stated
Oct 17, 2023Solar, 38.4 kW90018not stated
Sep 25, 2023Solar[ePlan] New roof-mounted solar PV1 system with (22) modules/optimizers and a central inverter…90011not stated
Aug 21, 2023Solar, 10 kW90011not stated
Aug 15, 2023Solar, 10 kW90062not stated
Aug 14, 2023Solar, 10 kW90039not stated
Aug 3, 2023Solar, 8.4 kW[EPLAN] ROOF TOP PV1. SYSTEM SIZE IS 8.4 kW DC (6.0 kW AC) USING 21 MODULES, 21 OPTIMIZERS AND 1…91605not stated
Jul 24, 2023Solar[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 7.6KWac 22 MODULES WITH OPTIMZERS AND A…91364not stated
Jul 18, 2023Solar, 9.8 kW[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 9.8kW DC / 7.6kW AC. SYSTEM INCLUDES 25…91331not stated
Jul 5, 2023Solar, 10 kW90011not stated
Jul 3, 2023Solar, 10 kW90062not stated
Jun 30, 2023Solar, 6.715 kWInstallation of a residential, roof mounted 6.715KW-DC / 5KW AC PV system with (17) modules/…91345not stated
Jun 26, 2023Solar, 6.715 kWInstallation of a residential, roof mounted 6.715KW-DC / 5KW AC system with (17) modules and (1)…90003not stated
Jun 13, 2023Solar[eplan] new rooftop mounted pv1 installation with (18) modules, (18) optimizers, (1) central…91325not stated
Jun 13, 2023Solar, 10 kW90062not stated
Jun 8, 2023Solar, 10 kW90011not stated
Jun 8, 2023Solar, 10 kW90032not stated
Apr 15, 2022Panel upgradeRevision to Permit # 220419000006446 The number of panels decreased90037not stated

What to ask before you hire

About Palmetto Solar Electric

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Palmetto Solar Electric

Five quick questions. We pass your request to Palmetto Solar Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Palmetto Solar Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 90011 and 91344

Also on our San Francisco list.

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.