Perez Solar Panels Inc
Solar installer working in Los Angeles. Licensed since 2022.
- License active
- Workers' comp on file
25 solar system jobs on Los Angeles permits, 2023 to 2026. 170th most solar system permits of 561 contractors in Los Angeles.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | License 1093574, active in the state's records on Sep 23, 2026General building, electricalNo complaints or citations on the board's public record. | Checks out |
| Workers' comp? | Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home. | On file |
| In business? | Licensed since 2022 | |
| Jobs on record | 25 solar system jobs on Los Angeles permits, 2023 to 2026Every permit we have for them is solar system.170th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.Of their 25 solar system permits, 1 mention a battery. |
Records: the state license board and City of Los Angeles permits.
State license board record
Last checked Oct 4, 2026. This may have changed. Check it on CSLB.
No complaints or citations on the board's public record.
Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1093574 on CSLB
Cost and timing
Solar in Los Angeles: $18,000 to $40,000
Half of 3,193 installs from January 2021 to December 2023 cost an amount in this range.
How to read this range
These are prices homeowners paid, as installers reported them to state programs. Lawrence Berkeley National Laboratory collects them in its Tracking the Sun data. A quarter paid less than this range, and a quarter paid more. The prices are before the federal tax credit.
Permit timeline
Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.
Track record
15 jobs in the last 12 months, up from 4 the year before
Where they work most
- 913426 jobs
- 900393 jobs
- 913522 jobs
- 900342 jobs
- 913312 jobs
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Aug 9, 2026 | Solar (×3, same day), 38.4 kW | 91342 | not stated |
| Aug 8, 2026 | Solar (×3, same day), 38.4 kW | 91342 | not stated |
| May 29, 2026 | Solar (×2, same day), 38.4 kW | 91352 | not stated |
| Apr 23, 2026 | Solar, 38.4 kW | 90034 | not stated |
| Apr 13, 2026 | SolarPV1 for installation of roof mounted solar panels | 90039 | not stated |
| Apr 13, 2026 | SolarPV1 system includes 6 modules 6 microinverters connected to 1 combiner box to an existing main… | 90039 | not stated |
| Mar 3, 2026 | Solar, 38.4 kW | 90039 | not stated |
| Dec 1, 2025 | Solar, 13.200 kW[E-Plan] PV1 13.200KW DC/ 17.6KW AC Roof Mount Central Inverter Solar System With 48KWH Storage… | 90034 | not stated |
| Oct 7, 2025 | Solar, 38.4 kW | 91331 | not stated |
| Sep 29, 2025 | Solar, 38.4 kW | 91311 | not stated |
| Sep 16, 2025 | Solar, 38.4 kW | 91331 | not stated |
| Sep 9, 2025 | Solar, 38.4 kW | 91306 | not stated |
| Aug 28, 2025 | Solar, 38.4 kW | 91356 | not stated |
| Dec 1, 2024 | Solar, 38.4 kW | 90049 | not stated |
| Sep 9, 2024 | Solar, 38.4 kW | 91356 | not stated |
| May 27, 2024 | Solar, 38.4 kW | 90272 | not stated |
| Mar 21, 2024 | Solar, 38.4 kW | 90041 | not stated |
| Oct 23, 2023 | Solar, 38.4 kW | 91307 | not stated |
| Sep 26, 2023 | Solar, 10 kWInstallation of roof-mounted central/string inverter solar PV system, notexceeding a total AC… | 90744 | not stated |
| Sep 23, 2023 | Solar, 10 kWInstallation of roof-mounted microinverter/AC module solar PV system, notexceeding a total AC… | 90744 | not stated |
What to ask before you hire
About Perez Solar Panels Inc
- Ask what the warranty covers and for how long, in writing.
Worth asking any solar installer
- Can you show me proof of liability insurance and your bond?
- What size system, which panels and inverter, and what will it make in a year?
- Is my roof good for 25 more years, and what if it needs work first?
- Who handles the permit and the utility's approval to turn it on?
Get a quote from Perez Solar Panels Inc
Five quick questions. We pass your request to Perez Solar Panels Inc.
Request for Perez Solar Panels Inc
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Perez Solar Panels Inc. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore solar installers near 91342 and 90039
- Sunrun
- Tesla Energy Operations Inc
- Axia Solar Corp
- Green Power Solar
- N E R D Power Ca Llc
- Diamond Solar Inc
See all 561 solar installers in Los Angeles, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.