contractors.fyi
Sign in

Plug It In Solar

Solar installer based in Van Nuys. Licensed since 2013.

  • License active

31 jobs on Los Angeles permits, 2020 to 2023: 27 solar installations, 4 panel upgrades. 161st most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 986882, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
In business?Licensed since 2013
Jobs on record31 jobs on Los Angeles permits, 2020 to 2023: 27 solar installations, 4 panel upgradesThey are based in Van Nuys. Work outside Los Angeles is not in these records.161st most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.Of their 27 solar system permits, 2 mention a battery.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 986882 on CSLB

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

Jobs per quarter

Q1 2020: 1 jobQ2 2021: 1 jobQ3 2022: 1 jobQ2 2023: 5 jobsQ3 2023: 10 jobsQ4 2023: 13 jobsBusiest: 13 jobs2020202120222023
Each bar is 3 months of permits. The tallest is 13 jobs, October to December 2023.

Where they work most

  • 913044 jobs
  • 900343 jobs
  • 914013 jobs
  • 914362 jobs
  • 902722 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 27, 2023Solar[E-Plan] New PV1 roof mounted solar system with battery backup consisting of 45 AC modules and 2…90034not stated
Dec 21, 2023Solar, 38.4 kW91401not stated
Dec 14, 2023Solar, 4.08 kW[eplan] pv1 plan check for new roof mounted pv system91436not stated
Dec 12, 2023Solar, 38.4 kW91306not stated
Dec 5, 2023Solar[E-Plan] New PV1 roof mounted solar system consisting of 28 modules with 28 microinverters…90020not stated
Dec 1, 2023Solar, 38.4 kW90035not stated
Nov 17, 2023Solar, 7.920 kWPlan check for an INSTALLation of 7.920 KW DC/ 6.3KW AC with 22 PV MODULES / microinverters,…91304not stated
Nov 15, 2023Solar[ePlan] New roof-mounted solar PV1 system installed alongside existing PV system91304not stated
Nov 7, 2023Solar, 5.04 kW[eplan] pv1 plan check for addition to existing pv system91304not stated
Nov 3, 2023Solar, 7.2 kW[eplan] Install 7.2 kW DC roof mounted addition to (E) PV system91304not stated
Oct 13, 2023Solar[ePlan] New roof-mounted solar PV1 system with ESS. Scope includes (68) AC modules, (4) Tesla…90034not stated
Oct 10, 2023Solar, 38.4 kW91364not stated
Oct 5, 2023Solar, 38.4 kW90005not stated
Sep 21, 2023Solar, 10 kW90069not stated
Sep 12, 2023Solar90272not stated
Sep 6, 2023Solar, 10 kW90043not stated
Sep 1, 2023Solar, 10 kW90034not stated
Aug 23, 2023Solar, 10 kW91342not stated
Jul 27, 2023Solar91401not stated
Jul 13, 2023Solar, 6.935 kWINSTALL 6.935 KW DC / 7.2KW AC SOLAR PV system with 19 MODULES/ microinverters, along with an…91423not stated
Jul 7, 2023Solar91436not stated
Jul 5, 2023Solar, 21.7 kW[eplan] roof top pv1. system size is 21.7 kw dc (19.53 kw ac) using 62 ac pv modules with 62…90049not stated
Jul 3, 2023Solar, 10 kW90011not stated
Jun 26, 2023Solar, 10 kW90011not stated
Jun 23, 2023Solar[ePlan] New roof-mounted solar PV1 system with (27) modules and (1) combiner box connected to…91401not stated
Jun 13, 2023Solar, 10 kW91423not stated
Jun 7, 2023Solar, 10 kW91604not stated
Apr 25, 2023Panel upgradeAdded new subpanels and loads, revised feeder schedule, voltage drop90006not stated
Aug 3, 2022Panel upgradeInstall new 800 amp single phase service90272not stated
Apr 27, 2021Panel upgradePower plan check for new 800A service with 8 subpanels with lighting a90004not stated
Mar 18, 2020Panel upgrade, 2 kWInstallation of (1) ess (13.5kwh) with (1) panel into existing 2kw dc90291not stated

What to ask before you hire

About Plug It In Solar

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Plug It In Solar

Five quick questions. We pass your request to Plug It In Solar.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Plug It In Solar. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 91304 and 90034

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.