Senga Energy Llc
Solar installer working in Los Angeles. Licensed since 2017.
- License active
- Workers' comp on file
6 solar system jobs on Los Angeles permits, 2024. 383rd most solar system permits of 561 contractors in Los Angeles.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | License 1033247, active in the state's records on Sep 23, 2026Electrical, glazingThe board's public record lists 1 item. See the record below. | Checks out |
| Workers' comp? | Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home. | On file |
| In business? | Licensed since 2017 | |
| Jobs on record | 6 solar system jobs on Los Angeles permits, 2024Every permit we have for them is solar system.383rd most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026. |
Records: the state license board and City of Los Angeles permits.
State license board record
Last checked Oct 4, 2026. This may have changed. Check it on CSLB.
How to read this
The Contractors State License Board lists complaints it has sent for legal action, citations it has issued, and warning letters. A complaint or accusation is an allegation, not a finding. A citation is the board's finding that a rule was broken; the contractor can appeal it. Complaints closed in the contractor's favor are never listed. Most contractors have no items.
Warning letter, as of Oct 4, 2026Nov 12, 2025 · Case N A 2024 9664
The board sent a formal warning letter on Nov 12, 2025. A warning letter has no fine.
Listed: departed from trade standards; no description of project, materials or equip to be used
Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1033247 on CSLB
Cost and timing
Solar in Los Angeles: $18,000 to $40,000
Half of 3,193 installs from January 2021 to December 2023 cost an amount in this range.
How to read this range
These are prices homeowners paid, as installers reported them to state programs. Lawrence Berkeley National Laboratory collects them in its Tracking the Sun data. A quarter paid less than this range, and a quarter paid more. The prices are before the federal tax credit.
Permit timeline
Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection
This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.
Track record
Jobs per quarter
Where they work most
- 913113 jobs
- 900661 job
- 913071 job
- 914031 job
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Jun 24, 2024 | Solar, 15.2 kW[ePlanLA] PV1 roof mounted System, PV System size: 15.2KW DC, 14.59KW AC CEC with 38 PV Modules and… | 91311 | not stated |
| May 22, 2024 | Solar, 14.80 kW[EPLAN] Residential roof mounted PV system 37 modules, 37 microinverter ( 14.80kW) with (1)… | 90066 | not stated |
| Apr 29, 2024 | SolarInstallation of roof-mounted Central/String inverter solar photovoltaic (PV) system interconnected… | 91307 | not stated |
| Mar 26, 2024 | Solar, 38.4 kWInstallation of a roof-mounted Microinverter/AC module solar photovoltaic (PV) system, not… | 91311 | not stated |
| Feb 28, 2024 | Solar, 7.6 kW7.6kW DC / 7.2kW AC roof mounted PV1 system with 19 modules/microinverters and 1 combiner box | 91403 | not stated |
| Jan 23, 2024 | Solar, 38.4 kWInstallation of a roof-mounted Microinverter/AC module solar photovoltaic (PV) system, not… | 91311 | not stated |
What to ask before you hire
About Senga Energy Llc
- Ask what the warranty covers and for how long, in writing.
Worth asking any solar installer
- Can you show me proof of liability insurance and your bond?
- What size system, which panels and inverter, and what will it make in a year?
- Is my roof good for 25 more years, and what if it needs work first?
- Who handles the permit and the utility's approval to turn it on?
Get a quote from Senga Energy Llc
Five quick questions. We pass your request to Senga Energy Llc.
Request for Senga Energy Llc
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Senga Energy Llc. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore solar installers near 91311 and 90066
- South West Builders
- Axia Solar Corp
- Los Angeles Solar Pros
- Luxor Energy Inc
- Pacific Sun Technologies Inc
- Power Up Solutions Llc
See all 561 solar installers in Los Angeles, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.