contractors.fyi
Sign in

Smart Solar Construction

Solar installer based in Thousand Oaks. Licensed since 2014.

  • License active
  • Workers' comp on file

68 jobs on Los Angeles permits, 2022 to 2026: 67 solar installations, 1 panel upgrade. 85th most solar system permits of 561 contractors in Los Angeles.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 998255, active in the state's records on Sep 23, 2026SolarNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2014
Jobs on record68 jobs on Los Angeles permits, 2022 to 2026: 67 solar installations, 1 panel upgradeThey are based in Thousand Oaks. Work outside Los Angeles is not in these records.85th most solar system permits of 561 licensed contractors in Los Angeles. That counts jobs, not quality.Our Los Angeles permit records cover June 2023 to September 2026.Of their 67 solar system permits, 7 mention a battery.

Records: the state license board and City of Los Angeles permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 998255 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $10,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Across Los Angeles, half of all solar system permits list $20,000 to $250,000. What solar system jobs cost in Los Angeles.

Get 2 or 3 written quotes.

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

3 jobs in the last 12 months, down from 29 the year before

Q3 2022: 1 jobQ3 2023: 2 jobsQ4 2023: 9 jobsQ1 2024: 6 jobsQ2 2024: 10 jobsQ3 2024: 11 jobsQ4 2024: 14 jobsQ1 2025: 3 jobsQ2 2025: 6 jobsQ3 2025: 3 jobsQ4 2025: 2 jobsQ1 2026: 1 jobBusiest: 14 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 14 jobs, October to December 2024.

Where they work most

  • 900496 jobs
  • 913254 jobs
  • 913164 jobs
  • 914034 jobs
  • 916074 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Feb 12, 2026Solar(EPlan) PV1 for installation of roof mounted solar panels with existing PV system91325not stated
Nov 12, 2025Solar, 19.575 kWPV1 Installation of 19.575kW DC/14.8kWAC roof mounted solar array91326not stated
Oct 17, 2025Solar(EPlan) PV1 installation of roof mounted solar panels and installation of energy storage system91316not stated
Aug 25, 2025Solar[eplan] new roof mounted solar pv1 system with ess90077not stated
Jul 30, 2025Solar, 38.4 kW91403not stated
Jul 28, 2025SolarConstruction of Ground Mounted Solar Array90049$10,000
Jun 25, 2025Solar, 38.4 kW91604not stated
Jun 16, 2025Solar, 38.4 kW91403not stated
May 6, 2025Solar, 4.675 kWInstall 4.675 kW DC/ 4.28 kWAC roof mounted PV system with 13.5 kWh energy storage system90066not stated
Apr 29, 2025Solar, 29.145 kW[E-Plan] PV1 Installation of 29.145kW DC/ 25.728KW AC 67 roof mounted solar modules with…91364not stated
Apr 25, 2025Solar, 17.94 kW[eplan] Install 17.94 kW DC roof mounted PV system91325not stated
Apr 21, 2025Solar, 31.025 kW90049not stated
Mar 14, 2025Solar, 15.12 kWInstallation of 15.12kW DC/ 14.08 kW AC. 36 modules with micro inverters91602not stated
Feb 7, 2025Solar, 38.4 kW91356not stated
Jan 23, 2025Solar, 5.655 kW[eplan] pv1 Solar and ESS5.655 KW DC/5 KW AC13.5 KWH ESS13 X 435 W MAXEON SPR-MAX6-43513 X 384 W…90068not stated
Dec 6, 2024Solar(EPlan) PV1 PC for installation of roof mounted solar panels91403not stated
Nov 18, 2024Solar, 9.35 kW[eplan] Install 9.35 kW DC roof mounted PV system and 13.5 kWh energy storage system90077not stated
Nov 11, 2024Solar, 38.4 kW91423not stated
Nov 1, 2024Solar, 38.4 kW91304not stated
Oct 21, 2024SolarSolar and ESS Install 30 X 425 W MAXEON SPR-MAX3-42530 X 380 W Enphase Energy IQ8X-80-M-US1 X 13500…90049not stated
Oct 21, 2024Solar27 X 440 W MAXEON SPR-MAX6-440GROUND MOUNT SOLARPHOTOVOLTAIC MODULES & ENERGY STORAGE SYSTEM2 X…90049not stated
Oct 21, 2024Solar, 38.4 kW90272not stated
Oct 21, 2024Solar, 38.4 kW91607not stated
Oct 21, 2024Solar, 38.4 kW91325not stated
Oct 15, 2024Solar, 38.4 kW91306not stated
Oct 15, 2024Solar, 38.4 kW91364not stated
Oct 10, 2024Solar, 38.4 kW90019not stated
Oct 9, 2024Solar, 38.4 kW91343not stated
Oct 9, 2024Solar, 38.4 kW91367not stated
Sep 20, 2024Solar, 38.4 kW91607not stated
Sep 18, 2024Solar, 12.1 kW[EPLAN] PV1 Installation of 12.1kW dc/11 kw ac roof mounted solar array and 13kW ESS. 30 pv modules…91344not stated
Sep 18, 2024Solar, 38.4 kW91343not stated
Sep 9, 2024Solar, 38.4 kW91367not stated
Sep 9, 2024Solar, 38.4 kW91403not stated
Sep 9, 2024Solar, 38.4 kW91325not stated
Sep 3, 2024Solar, 11.44 kWInstall 11.44 kW DC roof mounted PV system91436not stated
Sep 3, 2024Solar, 38.4 kW91607not stated
Jul 25, 2024Solar, 16.72 kWInstallation of 16.72kW DC/ 15.44 KW AC roof mounted solar array, consisting of 38 modules /…91436not stated
Jul 11, 2024Solar, 19.221 kW[ePlanLA] PV roof mounted system, PV System size: 19.221KW AC, 20.825KW DC with 49 PV Modules and…91602not stated
Jul 11, 2024Solar, 16.28 kWInstallation of 16.28 kW DC /15.04 KW AC Roof Mounted Solar system, consisting of 37 modules/…91607not stated

What to ask before you hire

About Smart Solar Construction

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Smart Solar Construction

Five quick questions. We pass your request to Smart Solar Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Smart Solar Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 90049 and 91325

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.