contractors.fyi
Sign in

Socal Energy Power

Solar installer based in Sherman Oaks.

  • License 1061369 was not in the state's records on Sep 23, 2026

24 jobs on Los Angeles permits, 2023 to 2026: 18 solar installations, 3 home additions, 3 ADUs.

We could not find an active or renewable license for this business in the state's records on Sep 23, 2026. Check the license with the state before you hire.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1061369 was not in the state's records on Sep 23, 2026Problem
Jobs on record24 jobs on Los Angeles permits, 2023 to 2026: 18 solar installations, 3 home additions, 3 ADUsThey are based in Sherman Oaks. Work outside Los Angeles is not in these records.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

Jobs per quarter

Q2 2023: 5 jobsQ3 2023: 13 jobsQ1 2024: 1 jobQ4 2024: 1 jobQ2 2025: 2 jobsQ1 2026: 2 jobsBusiest: 13 jobsLatest: 2 jobs202420252026
Each bar is 3 months of permits. The tallest is 13 jobs, July to September 2023.

Where they work most

  • 914023 jobs
  • 914062 jobs
  • 916052 jobs
  • 900032 jobs
  • 900022 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Jan 7, 2026Addition, 498 sq ftConvert (e) recreation room (498 sq ft) to junior accessory dwelling u91406$30,000
Jan 7, 2026ADU, 498 sq ftConvert (e) recreation room (498 sq ft) to junior accessory dwelling u91406$30,000
May 2, 2025AdditionConvert ex det 17'5"x20'9" garage into accessory dwelling unit per lam91605$45,000
May 2, 2025ADUConvert ex det 17'5"x20'9" garage into accessory dwelling unit per lam91605$45,000
Oct 25, 2024AdditionRemodel, (n) addition 14'-2 x 12'-7" addition to rear of (e) single fa91307$50,000
Jan 10, 2024ADUNEW 31' X 18'-6" TWO STORY ACCESSORY DWELLING UNIT PER GCS 65852.2(e)90003$122,311
Sep 26, 2023Solar, 2.02 kWNew roof-mounted solar PV1 system with (5) modules and (3) microinverters connected to existing…90003not stated
Sep 26, 2023SolarNew roof-mounted solar PV1 system installed alongside existing PV system90002not stated
Sep 20, 2023Solar, 10 kW91604not stated
Sep 1, 2023Solar, 10 kW91402not stated
Sep 1, 2023Solar, 10 kW91325not stated
Sep 1, 2023Solar, 10 kW91405not stated
Aug 31, 2023Solar, 10 kW91344not stated
Aug 18, 2023Solar, 10 kW90018not stated
Aug 14, 2023Solar, 10 kWInstallation of roof-mounted central/string inverter solar PV system, notexceeding a total AC…91335not stated
Aug 14, 2023Solar, 10 kW91606not stated
Aug 8, 2023Solar, 10 kW91606not stated
Jul 18, 2023Solar, 10 kW90744not stated
Jul 12, 2023Solar, 10 kW90044not stated
Jun 30, 2023Solar, 10 kW90031not stated
Jun 22, 2023Solar (×2, same day), 10 kW91402not stated
Jun 20, 2023Solar, 10 kW91306not stated
Jun 14, 2023Solar, 10 kW90002not stated

What to ask before you hire

About Socal Energy Power

  • Do not hire until the contractor shows you an active license.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Socal Energy Power

Five quick questions. We pass your request to Socal Energy Power.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Socal Energy Power. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 91402 and 91406

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.