  • License 976336 was not in the state's records on Sep 23, 2026

23 solar system jobs on Los Angeles permits, 2023 to 2024.

We could not find an active or renewable license for this business in the state's records on Sep 23, 2026. Check the license with the state before you hire.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 976336 was not in the state's records on Sep 23, 2026Problem
Jobs on record23 solar system jobs on Los Angeles permits, 2023 to 2024Every permit we have for them is solar system.Our Los Angeles permit records cover June 2023 to September 2026.Of their 23 solar system permits, 1 mention a battery.

Records: the state license board and City of Los Angeles permits.

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

Jobs per quarter

Q2 2023: 2 jobsQ3 2023: 3 jobsQ4 2023: 15 jobsQ1 2024: 3 jobsBusiest: 15 jobs2024
Each bar is 3 months of permits. The tallest is 15 jobs, October to December 2023.

Where they work most

  • 900033 jobs
  • 900112 jobs
  • 900232 jobs
  • 900442 jobs
  • 900022 jobs

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jan 25, 2024Solar, 4.92 kW[eplan] pv1 plan check for roof mounted pv system90003not stated
Jan 24, 2024Solar, 38.4 kW90015not stated
Jan 22, 2024Solar, 38.4 kW90011not stated
Dec 18, 2023Solar, 4.44 kWPlan check for a new PV Solar Installation rated at 4.44 kW - DC/ 3.8 KW AC with 12 modules/…90023not stated
Dec 15, 2023Solar[ePlan][PV1]Installation of 3.8kWAC PV system with 8 modules and 1 central inverter90044not stated
Dec 15, 2023Solar, 38.4 kW90003not stated
Dec 13, 2023Solar, 38.4 kW90011not stated
Dec 12, 2023Solar, 38.4 kW90023not stated
Dec 8, 2023Solar, 38.4 kW90003not stated
Dec 8, 2023Solar, 38.4 kW90002not stated
Dec 7, 2023Solar, 38.4 kW90058not stated
Dec 4, 2023Solar, 38.4 kW90032not stated
Nov 29, 2023Solar, 3.28 kW[ePlanLA] Installation of Roof Mounted Solar PV System (8 panels, 1 inverter/s, 3.28 kW)90065not stated
Nov 28, 2023Solar, 3.8 kW[EPLAN] Installation of Roof Mount Solar PV System 3.95 kWDC/3.8kWAC using 10 panels, 10…90002not stated
Nov 20, 2023Solar, 3.69 kW[eplan] Install 3.69 kW DC roof mounted PV system90065not stated
Nov 20, 2023Solar, 38.4 kW90032not stated
Nov 16, 2023Solar, 38.4 kW90044not stated
Oct 24, 2023Solar[ePlan] New roof-mounted solar PV1 system with (8) modules/optimizers and a central inverter…91605not stated
Aug 30, 2023Solar, 5.28 kW[eplan] Installation of 5.28 kW DC roof mounted PV system and 10 kWh energy storage system90066not stated
Aug 11, 2023Solar, 4.44 kWInstallation of Roof/Ground Mounted Solar PV System (12 panels, 1 inverter/s, 4.44 kW)90005not stated
Aug 7, 2023Solar[ePlan][PV1]Installation of a new 20.2kWDC/15.2kWAC PV system with 46 modules and 2 central…90068not stated
Jun 29, 2023Solar, 20.24 kW[EPLAN]Zero fee due to Ab 1414 and SB 1212 PV1 installation of Roof and Ground Mounted Solar PV…91335not stated
Jun 23, 2023Solar[E-Plan] New PV1 roof mounted solar system consisting of 27 modules, 27 optimizers and 1 central…90045not stated

What to ask before you hire

About Solcius Llc

  • Do not hire until the contractor shows you an active license.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Solcius Llc

Five quick questions. We pass your request to Solcius Llc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Solcius Llc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 90003 and 90011

Also on our San Francisco list.

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.