contractors.fyi
Sign in

Via Construction Services

Solar installer working in Los Angeles.

  • License 992721 was not in the state's records on Sep 23, 2026

7 solar system jobs on Los Angeles permits, 2023.

We could not find an active or renewable license for this business in the state's records on Sep 23, 2026. Check the license with the state before you hire.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 992721 was not in the state's records on Sep 23, 2026Problem
Jobs on record7 solar system jobs on Los Angeles permits, 2023Every permit we have for them is solar system.Our Los Angeles permit records cover June 2023 to September 2026.

Records: the state license board and City of Los Angeles permits.

Cost and timing

Permit timeline

Across Los Angeles, a solar system permit stays open about about 8 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 62 days. How long solar system jobs take.

Track record

Jobs per quarter

Q2 2023: 1 jobQ3 2023: 3 jobsQ4 2023: 3 jobsBusiest: 3 jobs
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2023.

Where they work most

  • 900024 jobs
  • 902301 job
  • 900591 job
  • 914061 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Nov 18, 2023Solar, 2.4 kW[eplan] Install 2.4 kW DC roof mounted PV system90002not stated
Oct 17, 2023Solar (×2, same day), 38.4 kWInstallation of a roof-mounted Microinverter/AC module solar photovoltaic (PV) system, not…90002not stated
Aug 9, 2023Solar, 2.4 kWInstall 2.4 kw-dc / 1.7kw ac pv system consisting of (6) 400w modules with micro inverters90002not stated
Jul 28, 2023Solar, 2.0 kW[EPlan] PV1 plan check to install 2.0 KW-DC/1.8 KW AC CEC roof PV system consisting of (5) 400w…90230not stated
Jul 7, 2023Solar, 10 kWInstallation of roof-mounted microinverter/AC module solar PV system, notexceeding a total AC…90059not stated
Jun 13, 2023Solar, 10 kWInstallation of roof-mounted microinverter/AC module solar PV system, notexceeding a total AC…91406not stated

What to ask before you hire

About Via Construction Services

  • Do not hire until the contractor shows you an active license.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Via Construction Services

Five quick questions. We pass your request to Via Construction Services.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Via Construction Services. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 90002 and 90230

See all 561 solar installers in Los Angeles, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.