Blake Electric Company
, mostly panel upgrade work
- 14 jobs in Greensboro, 2023 to 2026
- Typical permit value not stated
- 11 of 14 jobs are panel upgrades
Greensboro publishes no contractor license list we can check, so this page counts permits only. Ask for the license number and check it with the state before you hire.
Jobs by type of work
Most recent jobs
| Date | Work | ZIP |
|---|---|---|
| 2026-08-25 | Panel upgradeAdd receptacle in hallway. Install 125A outdoor panel. Run wire from new 125A outdoor panel to small panel in shed for 1 switch, 1 recepta | |
| 2026-07-21 | EV chargerInstall Level 2 Electric Vehicle (EV) Charger(WIFI APP/Plug-play), 32A, 25ft Cable ETL Certified, 220V-240V NEMA 14-50P Plug EVSE w/ J1772 C | |
| 2026-07-09 | EV chargerInstall outlet for EV Charger. | |
| 2026-06-25 | EV chargerInstall EV charger and two outdoor outlets. | |
| 2026-02-17 | Panel upgradeReplace existing 200A indoor panel with a new 200A indoor panel. | |
| 2025-10-09 | Panel upgradeRec room remodel - Install new 125A panel, recess lighting, ceiling fan, bathroom exhaust fan, dryer circuit, etc. | |
| 2025-04-10 | Panel upgradeReplace existing Zinsco panel and meter with new 200A outdoor panel and meter. We will need a same day inspection to get power hooked back | |
| 2025-02-28 | Panel upgradeInstall new 200A outdoor panel and 200A meter. | |
| 2024-11-12 | Panel upgradeReplacing existing meter/panel with a new 200A meter and 200A outdoor panel. | |
| 2024-10-14 | Panel upgradeInstall new 200amp outdoor panel and meter, install wire/add switch and rec for disposal. | |
| 2024-01-09 | Panel upgradeInstall new 200A outdoor panel and meter. | |
| 2023-07-24 | Panel upgradeWe are upgrading current service with new 200A meter and 200A panel. |
More panel upgrade electricians
- Beco, Inc
- Angel Electric Ventures, LLC
- Dr Sparky
- Hodges Electric Inc
- Blaney Electric Company
- Generator Supercenter Raleigh
Get quotes from up to 3 panel upgrade electricians
Tell us about the job. Within one business day we email you up to 3 contractors who do this work near your ZIP code, and pass your request to them. You decide who to hire.
We got your request
Within one business day we will email you up to 3 contractors who fit, and pass your request to them.
Paying for your panel upgrade
Most people use a home equity line, a personal loan or the contractor's own financing. Compare the three.
See all 64 panel upgrade electriciansRanked by jobs in Greensboro