contractors.fyi
Sign in

Blaze-triad, LLC

Panel upgrade electrician working in Greensboro.

  • Greensboro publishes no contractor license list we can check

171 jobs on Greensboro permits, 2022 to 2026: 92 panel upgrades, 62 heat pump installations, 17 EV charger installations. The most panel upgrade permits of 64 contractors in Greensboro.

What the records show vs. what they say

The public record next to the business's own words.

QuestionRecords showThey sayMark
Licensed?Greensboro publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
In business?Says founded in 1979
Jobs on record171 jobs on Greensboro permits, 2022 to 2026: 92 panel upgrades, 62 heat pump installations, 17 EV charger installationsThe most panel upgrade permits of 64 contractors in Greensboro. That counts jobs, not quality.Our Greensboro permit records cover September 2021 to September 2026.

In their words

  • Services: HVAC heating, HVAC cooling, AC repair, AC installation
    and 11 morePlumbing, Water heaters, Drain cleaning, Sewer lines, Leak detection, Electrical service, Generators, EV chargers, Electrical panels, Lighting, Indoor air quality solutions
  • Technicians are licensed, certified, factory-trained, drug-tested, and background-checked
  • Certified: BBB A+ accredited (a maker's or trade group's program; each lists its members on its own website)
  • Certified: Licensed and insured technicians
  • Works in: Winston-Salem, Greensboro, Archdale, Clemmons, High Point, Kernersville, Lewisville, Triad region

Records: City of Greensboro permits. They say: blazeair.com, read October 2026, summed up by us. We matched the site to this business by its name, city and trade; no license or phone on record could confirm it. We have not checked that the claims are true.

Track record

79 jobs in the last 12 months, up from 45 the year before

Q1 2022: 1 jobQ2 2022: 1 jobQ4 2022: 1 jobQ1 2023: 7 jobsQ2 2023: 7 jobsQ3 2023: 13 jobsQ4 2023: 4 jobsQ1 2024: 5 jobsQ2 2024: 5 jobsQ3 2024: 5 jobsQ4 2024: 7 jobsQ1 2025: 16 jobsQ2 2025: 13 jobsQ3 2025: 9 jobsQ4 2025: 25 jobsQ1 2026: 16 jobsQ2 2026: 16 jobsQ3 2026: 20 jobsBusiest: 25 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 25 jobs, October to December 2025. Across Greensboro, all contractors together had 38% more panel upgrade jobs in the last 12 months than in the 12 months before.

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
Sep 14, 2026Panel upgradeReplacing indoor 200amp panel Installing new main grounding systemnot stated
Sep 11, 2026Panel upgradeReplace (X2) 200amp inside panels, replace groundingnot stated
Sep 8, 2026Heat pumpInstall 80% 80,000 btu gas furnace and 3 ton coil down flow in closet, install a 3 ton heat pump…not stated
Sep 4, 2026Panel upgradeHome w no power - outside service torn off home Installation of new overhead riser on a 200amp…not stated
Sep 2, 2026Heat pump, 8 kWInstall a 3 ton air handler with 8kw heater in attic Install a 2.5 ton heat pump R454…not stated
Aug 31, 2026Heat pumpInstall a 80% 40,000 btu gas furnace with a 2 ton coil in attic pull low volt t stat wire Install…not stated
Aug 27, 2026Heat pumpInstall a 60,000 btu gas furnace and a 3 ton coil down flow in closet, install 3 ton heat pump, new…not stated
Aug 18, 2026Heat pump, 8 kWInstall a 2 ton air handler with 8kw heater in attic Install 2 ton heat pump R454 unit Replace…not stated
Aug 18, 2026Panel upgrade, 22 kWInstalling 22kw Re feeding indoor panel Installing transfer switch seperate mech permit -…not stated
Aug 14, 2026Panel upgradeInstall whole home surge protector in main panel in garagenot stated
Aug 10, 2026Panel upgradeService Change w Meter Release 8.11 Replacing 200amp outdoor meter and outdoor panel New main…not stated
Aug 7, 2026Heat pumpInstall 80% 60,000btu gas furnace w coil in atic 2 ton heat pump R454b new electrical disconnect…not stated
Aug 3, 2026Heat pump, 5 kWInstall a 2 ton air handler with 5kw heater in attic and run new line set Install a 1.5 ton heat…not stated
Aug 3, 2026Panel upgradeIndoor panel change, grounding systemnot stated
Aug 3, 2026Panel upgradeEmergancy Service - Wires hanging too low after a tree fell - Duke shut off New 200amp Meter…not stated
Jul 29, 2026Heat pump, 8 kWInstall a 2 ton air handler with 8kw heater in attic Need to add a 8” supply in the bedroom on…not stated
Jul 28, 2026Heat pump, 8 kWInstall a 2 ton air handler with 8kw heater in attic up flow Add ons-new line set- line hide cover…not stated
Jul 20, 2026Panel upgradeService change w meter release Replacing outdoor service, new Indoor panel, New main groundingnot stated
Jul 8, 2026Panel upgradeEMERGENCY. Tree fell - Complete new 200 amp service, with new riser, outdoor meter combo, and…not stated
Jul 7, 2026Panel upgradeReplacing outdoor service Relocating indoor panel to outside New main grounding New risernot stated
Jun 24, 2026Heat pump, 5 kWInstall a 2 ton air handler with 5kw heater in utility room up flow and install a 1.5 ton heat pumpnot stated
Jun 24, 2026Heat pumpInstall indoor coil, line set, and 3 ton heat pump r454bnot stated
Jun 24, 2026Panel upgradeTree Hit powerlines and box - Duke disconnected power New 30 space outdoor panel 200 amp New…not stated
Jun 22, 2026Panel upgradeInstalling an EV charger on an EV rated 50 amp plug using #6 wire and 50 amp double pool breakernot stated
Jun 22, 2026EV chargerInstalling an EV charger on an EV rated 50 amp plug using #6 wire and 50 amp double pool breakernot stated
Jun 5, 2026Heat pumpInstall a 90% 40,000 btu gas furnace and a 2 ton coil in crawl space Add one- Replace Line set…not stated
Jun 1, 2026Heat pumpInstall a 90% 40,000 btu gas furnace and 2-ton coil in crawl space run new line set and install a 2…not stated
Jun 1, 2026Panel upgradeReplace 200amp inside panel, install new grounding system, new service feedersnot stated
Jun 1, 2026Panel upgradeWill need meter release New 200A meter base, new main grounding system, new RIGID mast, refeed…not stated
May 27, 2026Panel upgradeRunning a new a/c unit whip from the outdoor main panelnot stated
May 1, 2026Panel upgradeReplace 200amp electrical panel in garage, adding surge protection to panel, and grounding system…not stated
Apr 28, 2026Panel upgradeService change - meter release date of Wednesday April 29th Replacing outdoor meter and out door…not stated
Apr 15, 2026Panel upgradeReplace outdoor panel Run a new dedicated circuit for the fridge about 25 feet will be a 20 amp…not stated
Apr 13, 2026Heat pump, 10 kWInstall a 2 ton air handler with 10kw heater upflow in closet and install a 2 ton heat pumpnot stated
Apr 9, 2026Heat pump, 5 kWInstall a 2 ton air handler with 5kw heater in garage upflow and install a 1.5 ton heat pumpnot stated
Apr 7, 2026Panel upgradeService Changenot stated
Mar 30, 2026Panel upgradeComplete service change - will need meter release Wed, April 1st Changing out outdoor 200amp panel…not stated
Mar 26, 2026Heat pump, 5 kWInstall a 2 ton air handler with 5kw heater in attic and add a 8" bypass damper and install a 2 ton…not stated
Mar 12, 2026Panel upgradeEmergency meter release needed for reconnect with Duke - siding company removed meter and Duke shut…not stated
Feb 24, 2026Panel upgradeTree took service off of house - need emergency meter release! 200amp meter/panel combo change…not stated

What to ask before you hire

About Blaze-triad, LLC

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Check each certification on the maker's or group's own website. Contractors must renew them.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Blaze-triad, LLC

Five quick questions. We pass your request to Blaze-triad, LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Blaze-triad, LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 64 panel upgrade electricians in Greensboro, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.