contractors.fyi
Sign in

Bright Design Electric

Panel upgrade electrician working in Marin County.

  • Marin County publishes no contractor license list we can check

15 jobs on Marin County permits, 2023 to 2025: 14 panel upgrades, 1 EV charger installation.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Marin County publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record15 jobs on Marin County permits, 2023 to 2025: 14 panel upgrades, 1 EV charger installationOur Marin County permit records cover October 2021 to October 2026.

Records: the state license board and City of Marin County permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $4,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Marin County.

Get 2 or 3 written quotes.

Track record

Jobs per quarter

Q3 2023: 2 jobsQ4 2023: 3 jobsQ1 2024: 3 jobsQ2 2024: 1 jobQ3 2024: 1 jobQ4 2024: 2 jobsQ3 2025: 1 jobQ4 2025: 2 jobsBusiest: 3 jobsLatest: 2 jobs20242025
Each bar is 3 months of permits. The tallest is 3 jobs, October to December 2023.

Where they work most

  • 949414 jobs
  • 949703 jobs
  • 949032 jobs
  • 949652 jobs
  • 949372 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Dec 5, 2025Panel upgradeOverhead-fed upgrade of existing 100A server with new 200A meter/main94903$8,559
Dec 5, 2025Panel upgradeLike-for-like Sub Panel replacement of existing Federal Pacific exterior sub panel with new…94965$2,732
Sep 11, 2025Panel upgradeNew 200A meter/main panel with new 200A-rated riser/weatherhead going straight up94941$9,860
Dec 19, 2024Panel upgradeReplacement of 100A Zinsco with new 200A meter/main service panel94941$2,500
Oct 2, 2024Panel upgradeReplacement of 100A meter/main service with 200A meter/main94941$2,000
Aug 1, 2024EV charger3/4 PVC to be ran under the ground in trench at required depth, number #6THHN to feed car charger94970$1,100
Jun 26, 2024Panel upgrade100 amp to 200 amp overhead-fed meter/main safety replacement of zinsco panel (no added loads) …94903$5,500
Mar 29, 2024Panel upgrade200A upgrade of underground-fed meter/ main electrical panel94937$4,000
Feb 20, 2024Panel upgradeEmergency replacement of meter/main after storm causing fallen tree on power line94904$5,000
Jan 11, 2024Panel upgradeNew 200A like for like from zinsco to be installed at same location with no added loads Service…94970$4,000
Dec 8, 2023Panel upgradeLike-for-like 125A to 125A replacement of Zinsco meter/main panel94937$3,500
Dec 7, 2023Panel upgradeReplacement of Zinsco sub panel Replace Circuits / Outlets94965$1,500
Nov 27, 2023Panel upgradeLike-for-like replacement of underground-fed zinsco 125A meter/main with new panel in existing…94970$5,900
Sep 6, 2023Panel upgrade100A to 200A meter/main Federal Pacific replacement/upgrade Service Upgrade94904$4,000
Aug 8, 2023Panel upgradeReplacement of old circuits with new Romex / grounded wiring and meter/main service panel upgrade…94941$23,000

What to ask before you hire

About Bright Design Electric

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Bright Design Electric

Five quick questions. We pass your request to Bright Design Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Bright Design Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94941 and 94970

See all 96 panel upgrade electricians in Marin County, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.