Bright Design Electric
Panel upgrade electrician working in Marin County.
- Marin County publishes no contractor license list we can check
15 jobs on Marin County permits, 2023 to 2025: 14 panel upgrades, 1 EV charger installation.
What the public records show
From the state's license records and the city's permits, one question at a time.
| Question | Records show | Mark |
|---|---|---|
| Licensed? | Marin County publishes no contractor license list we can checkThat says nothing about this business either way. | Ask them |
| Jobs on record | 15 jobs on Marin County permits, 2023 to 2025: 14 panel upgrades, 1 EV charger installationOur Marin County permit records cover October 2021 to October 2026. |
Records: the state license board and City of Marin County permits.
Cost and timing
All panel upgrade jobs in Marin County: $3,000 to $6,600
Half of 2,255 city permits list an amount in this range. Permit amounts are often lower than what you pay.
- Panel upgrades in Marin County: $3,200 to $6,500 (2,133 permits)
How to read this range
Contractors write a job value on the permit form, and the city uses it to set the permit fee. It is not the contract price, and it is often lower than what you pay. A quarter of the permits list less than this range, and a quarter list more. Use it to see if a quote is in the normal range.
Permit value (not a price)
Their typical permit lists $4,000 (half list more, half less)
That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Marin County.
Get 2 or 3 written quotes.
Track record
Jobs per quarter
Where they work most
- 949414 jobs
- 949703 jobs
- 949032 jobs
- 949652 jobs
- 949372 jobs
Jobs by kind of work
Latest jobs
Permit values are what the contractor wrote on the permit form, not what the owner paid.
| Date | Work | ZIP | On the permit form |
|---|---|---|---|
| Dec 5, 2025 | Panel upgradeOverhead-fed upgrade of existing 100A server with new 200A meter/main | 94903 | $8,559 |
| Dec 5, 2025 | Panel upgradeLike-for-like Sub Panel replacement of existing Federal Pacific exterior sub panel with new… | 94965 | $2,732 |
| Sep 11, 2025 | Panel upgradeNew 200A meter/main panel with new 200A-rated riser/weatherhead going straight up | 94941 | $9,860 |
| Dec 19, 2024 | Panel upgradeReplacement of 100A Zinsco with new 200A meter/main service panel | 94941 | $2,500 |
| Oct 2, 2024 | Panel upgradeReplacement of 100A meter/main service with 200A meter/main | 94941 | $2,000 |
| Aug 1, 2024 | EV charger3/4 PVC to be ran under the ground in trench at required depth, number #6THHN to feed car charger | 94970 | $1,100 |
| Jun 26, 2024 | Panel upgrade100 amp to 200 amp overhead-fed meter/main safety replacement of zinsco panel (no added loads) … | 94903 | $5,500 |
| Mar 29, 2024 | Panel upgrade200A upgrade of underground-fed meter/ main electrical panel | 94937 | $4,000 |
| Feb 20, 2024 | Panel upgradeEmergency replacement of meter/main after storm causing fallen tree on power line | 94904 | $5,000 |
| Jan 11, 2024 | Panel upgradeNew 200A like for like from zinsco to be installed at same location with no added loads Service… | 94970 | $4,000 |
| Dec 8, 2023 | Panel upgradeLike-for-like 125A to 125A replacement of Zinsco meter/main panel | 94937 | $3,500 |
| Dec 7, 2023 | Panel upgradeReplacement of Zinsco sub panel Replace Circuits / Outlets | 94965 | $1,500 |
| Nov 27, 2023 | Panel upgradeLike-for-like replacement of underground-fed zinsco 125A meter/main with new panel in existing… | 94970 | $5,900 |
| Sep 6, 2023 | Panel upgrade100A to 200A meter/main Federal Pacific replacement/upgrade Service Upgrade | 94904 | $4,000 |
| Aug 8, 2023 | Panel upgradeReplacement of old circuits with new Romex / grounded wiring and meter/main service panel upgrade… | 94941 | $23,000 |
What to ask before you hire
About Bright Design Electric
- Ask for their license number and check it with the state.
- Ask what the warranty covers and for how long, in writing.
Worth asking any panel upgrade electrician
- Can you show me proof of liability insurance and your bond?
- What size panel, and does the utility need to change the service to my house?
- Who arranges the power shutoff with the utility?
- Who pulls the permit, and who meets the inspector?
Get a quote from Bright Design Electric
Five quick questions. We pass your request to Bright Design Electric.
Request for Bright Design Electric
- Where
- Job
- Start
- Budget
- Goes to
You decide who to hire. Your details go only to the contractors you pick. How we use your details
Sent. We have your request.
We pass it to Bright Design Electric. Replies usually come within a few days.
Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.
Open your job roomMore panel upgrade electricians near 94941 and 94970
- Divine Electric Inc
- Talley Electric Service
- Auto Charge Electric Inc
- Anchor Electric
- Entwisle Electric LLC
- Rock Solid Electrical
See all 96 panel upgrade electricians in Marin County, ranked by jobs
Run this business? Claim this page to get requests by email and reply to homeowners here.