48 jobs on Naperville permits, 2022 to 2026: 44 EV charger installations, 4 panel upgrades. 3rd most EV charger permits of 43 contractors in Naperville.

What the records show vs. what they say

The public record next to the business's own words.

QuestionRecords showThey sayMark
Licensed?Naperville publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record48 jobs on Naperville permits, 2022 to 2026: 44 EV charger installations, 4 panel upgrades3rd most EV charger permits of 43 contractors in Naperville. That counts jobs, not quality.Our Naperville permit records cover December 2022 to August 2026.Of their 44 EV charger permits, 31 mention a panel upgrade.

In their words

  • Services: Electrical inspections, Electrical installations, Electrical repairs, Panel upgrades
    and 8 moreRewiring, Lighting installation, Home automation, Ceiling fan installation, EV charger installation, Hot tub electrical hookup, Sauna electrical hookup, Emergency services
  • Works in: Naperville, Downers Grove, Hinsdale, surrounding areas

Records: City of Naperville permits. They say: aardvarkelectricservice.com, read October 2026, summed up by us. We matched the site to this business by its name, city and trade; no license or phone on record could confirm it. We have not checked that the claims are true.

Cost and timing

Permit value (not a price)

Their typical permit lists $1,380 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What EV charger jobs cost in Naperville.

Get 2 or 3 written quotes.

Track record

6 jobs in the last 12 months, down from 10 the year before

Q4 2022: 2 jobsQ1 2023: 4 jobsQ2 2023: 5 jobsQ3 2023: 5 jobsQ4 2023: 6 jobsQ1 2024: 2 jobsQ2 2024: 4 jobsQ3 2024: 4 jobsQ4 2024: 2 jobsQ1 2025: 6 jobsQ3 2025: 2 jobsQ4 2025: 3 jobsQ2 2026: 2 jobsQ3 2026: 1 jobBusiest: 6 jobsLatest: 1 job2023202420252026
Each bar is 3 months of permits. The tallest is 6 jobs, October to December 2023. Across Naperville, all contractors together had 55% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 6056418 jobs
  • 6054014 jobs
  • 6056510 jobs
  • 605636 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jul 6, 2026EV chargerInstall 60A/240V EV circuit for hard wired Emporia Charger EV CHARGER60563$1,840
May 21, 2026EV chargerInstall 60A dual Tesla Gen 3 with power sharing Upgrade 150A underground residential single phase…60565$6,840
May 14, 2026EV chargerInstall 60A/240V circuit for Tesla Universal Charger60540$3,630
Dec 15, 2025EV charger60563$1,830
Oct 23, 2025Panel upgrade1) Your main panel is full and you will require two circuits be moved to your sub panel, to give…60540$1,790
Oct 23, 2025EV charger1) Your main panel is full and you will require two circuits be moved to your sub panel, to give…60540$1,790
Aug 27, 2025EV charger1) Install one 50A/240V EV charger circuit in the existing 100A/240V Square D QO panel. 2) Pipe…60540$1,360
Jul 1, 2025EV charger60565$1,750
Mar 19, 2025EV charger60564$1,190
Mar 19, 2025EV charger1) Add 1 Tandem breaker to make room in your panel for the EV charger circuit. 2) Install one…60564$1,970
Feb 26, 2025EV charger1) Install one 60A/240V EV charger circuit in existing 200A/240V Cutler Hammer panel. 2) Pipe 3/4”…60564$1,720
Feb 12, 2025EV charger60563$1,360
Jan 14, 2025EV charger1) Install one 60A/240V EV charger circuit in existing 200A/240V Challenger panel. 2) Pipe 3/4”…60564$1,360
Jan 7, 2025EV charger1) Install 60A/240V EV charger circuit in existing 100A/240V Eaton panel located in the garage. 2)…60564not stated
Dec 26, 2024EV charger1) Install one 60A/240V EV charger circuit in existing 200A/240V Challenger panel. 2) Pipe 3/4”…60564$1,210
Dec 5, 2024EV charger1) Install one 60A/240V Garage circuit in the existing 200A/240V Siemens panel. 2) Pipe 3/4” steel…60540$2,370
Jul 29, 2024Panel upgradeReplace existing 100A/240V Challenger main breaker panel w 200A/240V 40 space Siemens panel or…60565$3,250
Jul 23, 2024EV charger1) Install one 50A/240V EV charger circuit in the existing 100A/240V Gould panel. 2) Pipe 3/4”…60564$1,060
Jul 1, 2024Panel upgrade1) Move 2 circuits from the main panel to the sub panel, to make room for the EV circuit. 2)…60540$1,740
Jul 1, 2024EV charger1) Move 2 circuits from the main panel to the sub panel, to make room for the EV circuit. 2)…60540$1,740
Jun 11, 2024EV charger1) Install a 60A/240V EV charger circuit in your existing 200A/240V Eaton panel. 2) Pipe 3/4” steel…60564$1,520
May 7, 2024EV charger1) Install 60A/240V EV charger circuit in existing 200A GE HOM panel. 2) Pipe 3/4” steel conduit…60540$1,820
Apr 25, 2024EV charger1.Install 60A/240V EV charger circuit in existing 200A/240V Eaton panel. 2.Pipe 3/4” steel conduit…60540$1,220
Apr 13, 2024EV charger1) Use existing (unused) DRYER breaker location for the new EV charger circuit. 2) Install 60A/240V…60563$1,160
Mar 21, 2024Panel upgrade1) Upgrade existing 100A/240V Zinsco panel and breakers to 200A Siemens or equivalent 40 space…60565$3,250
Mar 14, 2024EV charger1. Install 60A/240V EV charger circuit in existing 200A/240V Siemens panel60564$1,350
Dec 15, 2023EV charger60563$1,450
Dec 15, 2023EV charger60564$1,340
Nov 28, 2023EV charger60564$1,420
Nov 28, 2023EV charger60564not stated
Oct 16, 2023EV charger60564$1,260
Oct 6, 2023EV charger60540$1,450
Sep 27, 2023EV chargerAdd a Square D HOM main lug sub panel to the left of your existing Square D HOM panel. Install…60563$2,275
Sep 13, 2023EV charger1. Install 50A/240V EV charger circuit in existing 200A/240V Siemens panel 2. Install 3 - #6awg…60565$1,490
Aug 26, 2023EV chargerInstall 60A/240V EV charger circuit in existing 200A/240V GE panel. Install 3 - #6awg copper…60540$1,075
Jul 20, 2023EV charger1) Install 60A/240V EV charger circuit in existing 200A/240V Eaton panel. 2) Install 3 - #6awg…60564$1,050
Jul 5, 2023EV charger60564$1,200
Jun 16, 2023EV charger60564$1,150
May 26, 2023EV chargerInstall 50a/240v ev charger circuit from existing 50a/240v hot tub disconnect-install 3 - #6awg…60540$1,320
May 23, 2023EV chargerInstall ev charger ; install 3 #6awg copper conductors60565$1,320

What to ask before you hire

About Aardvark Electric Service Inc

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Aardvark Electric Service Inc

Five quick questions. We pass your request to Aardvark Electric Service Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Aardvark Electric Service Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 60564 and 60540

See all 43 EV charger installers in Naperville, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.