contractors.fyi
Sign in

Elbac Solar

Solar installer working in Riverside.

  • Riverside publishes no contractor license list we can check

14 solar system jobs on Riverside permits, 2022 to 2026. 34th most solar system permits of 161 contractors in Riverside.

What the public records show

From the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Riverside publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record14 solar system jobs on Riverside permits, 2022 to 2026Every permit we have for them is solar system.34th most solar system permits of 161 contractors in Riverside. That counts jobs, not quality.Our Riverside permit records cover September 2021 to September 2026.Of their 14 solar system permits, 1 mention a battery.

Records: City of Riverside permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $30,833 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What solar system jobs cost in Riverside.

Get 2 or 3 written quotes.

Track record

2 jobs in the last 12 months, down from 6 the year before

Q3 2022: 2 jobsQ2 2023: 2 jobsQ3 2023: 1 jobQ1 2024: 1 jobQ4 2024: 4 jobsQ2 2025: 2 jobsQ1 2026: 2 jobsBusiest: 4 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, October to December 2024. Across Riverside, all contractors together had 12% fewer solar system jobs in the last 12 months than in the 12 months before.

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkOn the permit form
Jan 27, 2026Solar, 6.96 kW$39,135
Jan 8, 2026Solar, 3.44 kW$13,180
May 8, 2025Solar, 9.78 kW$75,703
Apr 18, 2025Solar14.3 kwh energy storage system **solar permit: 18-2098** solar$15,276
Nov 14, 2024Solar, 6.970 kW$24,395
Nov 6, 2024Solar, 3.40 kW$19,666
Oct 30, 2024Solar, 9.775 kW$35,264
Oct 30, 2024Solar, 8.075 kW$28,666
Mar 7, 2024Solar, 4.455 kW$34,160
Jul 21, 2023Solar, 5.67 kWInstall pv system wth (14) panels and 5.67kw on residential roof solar$24,908
Jun 6, 2023Solar, 5.67 kWInstall pv system on residential roof: 14 panels & 5.67kw **panel upgrade will be a seperate…$33,348
Apr 11, 2023Solar, 15.390 kWInstall pv system on residntial roof: 38 panels & 15.390kw solar$38,000
Sep 28, 2022Solar, 5.840 kW$16,000
Aug 24, 2022Solar, 12.045 kW$33,000

What to ask before you hire

About Elbac Solar

  • Ask for their license number and check it with the state.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Elbac Solar

Five quick questions. We pass your request to Elbac Solar.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Elbac Solar. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers

See all 161 solar installers in Riverside, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.