contractors.fyi
Sign in

Zobel Electric LLC

Panel upgrade electrician working in Riverside.

  • Riverside publishes no contractor license list we can check

58 jobs on Riverside permits, 2022 to 2026: 47 panel upgrades, 11 EV charger installations. 3rd most panel upgrade permits of 117 contractors in Riverside.

What the records show vs. what they say

The public record next to the business's own words.

QuestionRecords showThey sayMark
Licensed?Riverside publishes no contractor license list we can checkThat says nothing about this business either way.Ask them
Jobs on record58 jobs on Riverside permits, 2022 to 2026: 47 panel upgrades, 11 EV charger installations3rd most panel upgrade permits of 117 contractors in Riverside. That counts jobs, not quality.Our Riverside permit records cover September 2021 to September 2026.

In their words

  • Services: Electrical panel upgrades, Electrical panel repairs, Home electrical repairs and remodeling, Circuit breakers and fuses
    and 7 moreTroubleshooting and repair, Indoor and outdoor lighting, Meter upgrades, Commercial upgrades, Whole house fan installation, Electrical home inspections, Generator and solar installation
  • Technicians available around the clock
  • Warranty: Guarantees work will be done correctly
  • Warranty: Guarantee of satisfaction
  • Certified: Licensed and insured (a maker's or trade group's program; each lists its members on its own website)
  • Certified: Certified technicians
  • Works in: Riverside

Records: City of Riverside permits. They say: zobelelectricca.com, read October 2026, summed up by us. We matched the site to this business by its name, city and trade; no license or phone on record could confirm it. We have not checked that the claims are true.

Cost and timing

Permit value (not a price)

Their typical permit lists $3,400 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in Riverside.

Get 2 or 3 written quotes.

Track record

9 jobs in the last 12 months, down from 12 the year before

Q1 2022: 4 jobsQ2 2022: 7 jobsQ3 2022: 5 jobsQ4 2022: 1 jobQ1 2023: 1 jobQ2 2023: 1 jobQ3 2023: 6 jobsQ4 2023: 4 jobsQ1 2024: 1 jobQ2 2024: 3 jobsQ3 2024: 5 jobsQ4 2024: 4 jobsQ1 2025: 3 jobsQ3 2025: 5 jobsQ4 2025: 2 jobsQ1 2026: 1 jobQ2 2026: 3 jobsQ3 2026: 2 jobsBusiest: 7 jobsLatest: 2 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 7 jobs, April to June 2022. Across Riverside, all contractors together had 16% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkOn the permit form
Sep 15, 2026Panel upgrade$5,533
Aug 17, 2026Panel upgrade$5,533
May 4, 2026EV chargerInstall (n) 60 amp circuit for (n) ev chargernot stated
Apr 30, 2026EV chargerEv charger - 60 amps$1,225
Apr 22, 2026EV chargerEv charger - 60 amps$1,350
Mar 13, 2026Panel upgrade$5,333
Dec 19, 2025Panel upgrade$5,333
Dec 10, 2025Panel upgrade$5,333
Sep 26, 2025Panel upgrade$6,463
Sep 17, 2025Panel upgradeInstall (2) ev chargers - (1) hard wired and (1) nemo 14-50 outlet ** existing 200 amp electric…not stated
Sep 17, 2025EV chargerInstall (2) ev chargers - (1) hard wired and (1) nemo 14-50 outlet ** existing 200 amp electric…not stated
Aug 22, 2025Panel upgradeAfter the fact: upgrade electrical service meter panel to 200 amp service upgrade$2,500
Jul 8, 2025Panel upgradeUpgrade electrical service meter panel to 200amps service upgrade$5,333
Feb 5, 2025EV chargerInstall nema oulet in garage for ev charger$1,200
Jan 17, 2025Panel upgradeInstalling (1) 60 amp circuit for a gen 3 tesla electrical vehicle charger (existing service panel…not stated
Jan 17, 2025EV chargerNew ev charger with 50amp circuitnot stated
Dec 11, 2024Panel upgradeUpgrading electric panel from 100 to 200 amps$5,333
Dec 11, 2024Panel upgradeInstall (1) 50 amp circuit with nema 14-50 outlet behind panel for ev chargernot stated
Dec 11, 2024EV chargerInstall (1) 50 amp circuit with nema 14-50 outlet behind panel for ev chargernot stated
Dec 5, 2024Panel upgradeUpgrade electrical service meter panel to 200 amps service upgrade$5,333
Sep 23, 2024EV chargerInstalling a 60 amp designated circuit for ev charging stationnot stated
Aug 21, 2024Panel upgradeUpgrade electric service (meter) panel to 200 amps service upgrade$4,200
Aug 1, 2024Panel upgrade (×2, same day)$2,000 each
Jul 2, 2024Panel upgradeUpgrade electric service (meter) panel to 200 amps service upgrade$4,200
May 28, 2024Panel upgradeInstall ev charger existing 200amp panelnot stated
May 28, 2024EV chargerInstall ev charger existing 200amp panelnot stated
Apr 1, 2024Panel upgradeUpgrade electric service (meter) panel from 100 amps to 200 amps service upgrade$4,138
Mar 11, 2024Panel upgradeUpgrade electric service (meter) panel to from 100 amps to 200 amps service upgrade$4,138
Dec 11, 2023Panel upgradeUpgrade electric service panel to 200 amps 6/4/24 & 8/5/24: revision: upgrade & relocate electric…$4,200
Dec 7, 2023Panel upgradeUpgrade electric service panel to 200 amps service upgrade$4,200
Nov 21, 2023Panel upgradeUpgrade electrical service to 200 amps service upgrade$2,000
Oct 31, 2023Panel upgradeUpgrade electric service panel from 100 amps to 200 amps service upgrade$4,100
Sep 25, 2023Panel upgrade$4,100
Sep 15, 2023Panel upgrade (×2, same day)$4,100 each
Sep 7, 2023Panel upgradeUpgrade electric meter 200 amps change overhead entrance to underground service upgrade$2,000
Jul 6, 2023Panel upgrade$3,900
Jul 6, 2023Panel upgrade$3,400
May 26, 2023Panel upgrade$3,900
Feb 2, 2023EV chargerNew ev charger - 60 ampnot stated
Dec 15, 2022Panel upgradeUpgrade electric service panel to 200 amps service upgrade$3,400

What to ask before you hire

About Zobel Electric LLC

  • Ask for their license number and check it with the state.
  • Ask for the workmanship warranty in writing: how many years, and what it covers.
  • Check each certification on the maker's or group's own website. Contractors must renew them.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Zobel Electric LLC

Five quick questions. We pass your request to Zobel Electric LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Zobel Electric LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians

See all 117 panel upgrade electricians in Riverside, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.