contractors.fyi
Sign in

Crown Pacific Construction

ADU builder working in San Diego. Licensed since 2017.

  • License active

9 ADU jobs on San Diego permits, 2023 to 2026. 16th most ADU permits of 105 contractors in San Diego.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1026741, active in the state's records on Sep 23, 2026General buildingNo disciplinary case on the state's file.We found this license by the business name. No other active license has that name.Checks out
In business?Licensed since 2017
Jobs on record9 ADU jobs on San Diego permits, 2023 to 2026Every permit we have for them is ADU.16th most ADU permits of 105 contractors in San Diego. That counts jobs, not quality.Our San Diego permit records cover October 2021 to September 2026.

Records: the state license board and City of San Diego permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $34,112 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What ADU jobs cost in San Diego.

Get 2 or 3 written quotes.

Track record

Jobs per quarter

Q2 2023: 1 jobQ4 2023: 1 jobQ2 2024: 2 jobsQ3 2025: 3 jobsQ1 2026: 1 jobQ2 2026: 1 jobBusiest: 3 jobs202420252026
Each bar is 3 months of permits. The tallest is 3 jobs, July to September 2025.

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkOn the permit form
Apr 8, 2026ADUADU MID-CITY:CITY HEIGHTS; Combination building permit for the proposed (N) detached manufactured…$99,402
Jan 27, 2026ADUADU SKYLINE-PARADISE HILLS; Combination Building Permit for a proposed detached single-story ADU,…$78,075
Sep 29, 2025ADUADU CLAIRMONT MESA: Combination building permit for the proposed (2) detached ADUs (Manufactured…$32,025
Sep 26, 2025ADUADU CLAIRMONT MESA: Combination building permit for the proposed (2) detached ADUs (Manufactured…$32,025
Aug 27, 2025ADUADU SOUTHEASTERN SAN DIEGO; Combination building permit for a proposed detached ADU (Manufactured…$88,302
Apr 24, 2024ADU (×2, same day)ADU SOUTHEASTERN SAN DIEGO: Combination permits for two proposed detached ADUs (Manufactured Home)…$34,112 each
Nov 13, 2023ADUADU ENCANTO NEIGHBORHOODS; Combination building permit for proposed manufactured home as detached…$74,880
May 1, 2023ADUSKYLINE-PARADISE HILLS; Combination building permit for a detached manufactured ADU on a lot with…$34,112

What to ask before you hire

About Crown Pacific Construction

  • Ask what the warranty covers and for how long, in writing.

Worth asking any ADU builder

  • Can you show me proof of liability insurance and your bond?
  • Do you handle the plans, engineering and utility hookups, or do I?
  • How long from permit to the final inspection on your last three ADUs?
  • What is the payment schedule, and what is extra?

Get a quote from Crown Pacific Construction

Five quick questions. We pass your request to Crown Pacific Construction.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Crown Pacific Construction. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More ADU builders

See all 105 ADU builders in San Diego, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.