contractors.fyi
Sign in

Ally Electric &solar Inc./ally Electric

Solar installer based in Richmond. Licensed since 2002.

  • License active
  • Workers' comp on file

7 jobs on San Francisco permits, 2024 to 2026: 3 solar installations, 2 panel upgrades, 2 EV charger installations. 20th most solar system permits of 26 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 806465, active in the state's records on Sep 23, 2026Electrical, solarNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2002
Jobs on record7 jobs on San Francisco permits, 2024 to 2026: 3 solar installations, 2 panel upgrades, 2 EV charger installationsThey are based in Richmond. Work outside San Francisco is not in these records.20th most solar system permits of 26 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover October 2021 to September 2026.Of their 3 solar system permits, 1 mention a battery.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 806465 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $39,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Across San Francisco, half of all solar system permits list $16,000 to $51,000. What solar system jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a solar system permit stays open about about 6 months, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 35 days. How long solar system jobs take.

Track record

6 jobs in the last 12 months, up from 0 the year before

Q2 2024: 1 jobQ1 2026: 1 jobQ2 2026: 5 jobsBusiest: 5 jobs20252026
Each bar is 3 months of permits. The tallest is 5 jobs, April to June 2026. Across San Francisco, all contractors together had 1600% more solar system jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941123 jobs
  • 941313 jobs
  • 941101 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Jun 17, 2026Panel upgrade94112$3,000
Jun 17, 2026EV charger94112$3,000
May 6, 2026Panel upgrade94131$1,200
May 6, 2026EV charger94131$1,200
Apr 29, 2026SolarSolar permit: mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 10 kwh…94131not stated
Mar 23, 2026Solar, 4.86 kWSolar permit: installing 12 solar pv modules, 405 watts per module, total no94110$24,900
Apr 15, 2024Solar, 5.880 kWInstall 5.880kw dc solar system coupled w/ (2)enphase energy encharge-10t1p-na batteries(total…94112$53,100

What to ask before you hire

About Ally Electric &solar Inc./ally Electric

  • Ask what the warranty covers and for how long, in writing.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Ally Electric &solar Inc./ally Electric

Five quick questions. We pass your request to Ally Electric &solar Inc./ally Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Ally Electric &solar Inc./ally Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 94112 and 94131

See all 26 solar installers in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.