contractors.fyi
Sign in

Taylor Made Electric

Panel upgrade electrician working in San Francisco. Licensed since 2016.

  • License active
  • Workers' comp on file

19 jobs on San Francisco permits, 2022 to 2025: 14 panel upgrades, 5 EV charger installations. 261st most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 1010103, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
Workers' comp?Workers' comp policy on file with the stateThis covers their crew if someone is hurt. It is not insurance for your home.On file
In business?Licensed since 2016
Jobs on record19 jobs on San Francisco permits, 2022 to 2025: 14 panel upgrades, 5 EV charger installations261st most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 1010103 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $1,800 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

0 jobs in the last 12 months, down from 15 the year before

Q3 2022: 1 jobQ3 2023: 1 jobQ1 2024: 1 jobQ2 2024: 1 jobQ4 2024: 2 jobsQ1 2025: 9 jobsQ2 2025: 2 jobsQ3 2025: 2 jobsBusiest: 9 jobs202320242025
Each bar is 3 months of permits. The tallest is 9 jobs, January to March 2025. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 941098 jobs
  • 941183 jobs
  • 941272 jobs
  • 941232 jobs
  • 941311 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Jul 29, 2025Panel upgradeReplace sub panel with new panel, install new car charger in garage94127$1,500
Jul 29, 2025EV chargerReplace sub panel with new panel, install new car charger in garage94127$1,500
Jun 2, 2025Panel upgradeElectrical remodel in foyer, dining, kitchen, bath 1 and 2, master bath and closet, new sub panel94109not stated
Jun 2, 2025Panel upgradeRemoving knob and tube wiring and refeeding outlets and lighting throughout unit94118not stated
Mar 24, 2025Panel upgradeRemove existing federal pacific panel in the closet and replace with new sub panel94109$2,500
Mar 19, 2025Panel upgradeReplace the existing federal pacific house panel for common area lighting with new panel for…94109$2,500
Mar 19, 2025Panel upgrade (×5, same day)94109$1,800 each
Feb 12, 2025EV chargerInstall 50a 240v car charger in garage94118$3,000
Jan 24, 2025Panel upgradeMeter socket and main bus was damaged for unit 1 and 2. replacing bus bar and both meter sockets…94131$2,000
Dec 18, 2024Panel upgradeRemoving some old wiring that was hanging surface mount in the garage, back storage, laundry, room…94123$4,000
Oct 17, 2024EV chargerInstall 50a 240v ev car charger unit on garage wall94118not stated
Jun 3, 2024EV chargerUpgrade meter main from one meter to 200a 2 meter main, one for house and one for ev charging94132$1,000
Jan 9, 2024Panel upgradeInstall new 200a sub panel in storage room94121$2,500
Aug 22, 2023Panel upgradeSeparate lower unit circuits from from upper unit circuits, move common area circuits to house…94123not stated
Aug 29, 2022EV chargerInstall 60a car charger in garage94114$1,000

What to ask before you hire

About Taylor Made Electric

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Taylor Made Electric

Five quick questions. We pass your request to Taylor Made Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Taylor Made Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94109 and 94118

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.