Panel upgrade electrician based in San Francisco. Licensed since 1993.

  • License active

700 jobs on San Francisco permits, 2021 to 2026: 476 panel upgrades, 222 EV charger installations, 2 solar installations. The most panel upgrade permits of 1,063 contractors in San Francisco.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 681529, active in the state's records on Sep 23, 2026ElectricalNo complaints or citations on the board's public record.Checks out
In business?Licensed since 1993
Jobs on record700 jobs on San Francisco permits, 2021 to 2026: 476 panel upgrades, 222 EV charger installations, 2 solar installationsThe most panel upgrade permits of 1,063 licensed contractors in San Francisco. That counts jobs, not quality.Our San Francisco permit records cover September 2021 to September 2026.

Records: the state license board and City of San Francisco permits.

State license board record

No complaints or citations on the board's public record.

Source: California Contractors State License Board, checked Oct 4, 2026. Look up license 681529 on CSLB

Cost and timing

Permit value (not a price)

Their typical permit lists $5,000 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. Over their last 12 months (82 permits) it was $3,000. Kitchen jobs alone: typical permit $10,000 (16 permits). What panel upgrade jobs cost in San Francisco.

Get 2 or 3 written quotes.

Permit timeline

Across San Francisco, a panel upgrade permit stays open about 77 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. The permit itself is usually issued the same day. How long panel upgrade jobs take.

Track record

215 jobs in the last 12 months, about the same as 229 the year before

Q3 2021: 1 jobQ4 2021: 7 jobsQ1 2022: 12 jobsQ2 2022: 23 jobsQ3 2022: 9 jobsQ4 2022: 15 jobsQ1 2023: 6 jobsQ2 2023: 19 jobsQ3 2023: 21 jobsQ4 2023: 37 jobsQ1 2024: 31 jobsQ2 2024: 51 jobsQ3 2024: 40 jobsQ4 2024: 23 jobsQ1 2025: 48 jobsQ2 2025: 55 jobsQ3 2025: 94 jobsQ4 2025: 110 jobsQ1 2026: 44 jobsQ2 2026: 32 jobsQ3 2026: 22 jobsBusiest: 110 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 110 jobs, October to December 2025. Across San Francisco, all contractors together had 21% fewer panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 94102110 jobs
  • 9411051 jobs
  • 9410950 jobs
  • 9411449 jobs
  • 9412248 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 11, 2026EV chargerInstall new level 2 ev charger with load management system94110$3,792
Sep 10, 2026EV charger94122$1,979
Sep 3, 2026EV charger94115$2,300
Aug 28, 2026Panel upgradeRelocating sub panel to be code compliant94121$2,850
Aug 25, 2026EV chargerInstall new level 2 ev charger with load management system94131$2,775
Aug 24, 2026Panel upgradeReplace panel94117$3,000
Aug 20, 2026EV charger94134$2,549
Aug 10, 2026Panel upgradeReplace federal pacific panel with new siemens94108$3,000
Aug 4, 2026EV chargerInstall (1) level 2 ev charger94107$7,325
Jul 31, 2026EV chargerInstall new 240v circuit with new ev charger in garage94123$1,500
Jul 29, 2026Panel upgrade94116$6,000
Jul 28, 2026EV chargerInstalling a level 2 ev charger94102$3,525
Jul 24, 2026EV chargerInstall ev charger with load management in garage on new 240v circuit94122$1,500
Jul 24, 2026EV chargerInstall ev charger on new 240v circuit94127$1,600
Jul 23, 2026EV chargerInstall ev charger in garage on 80a circuit94123$1,500
Jul 21, 2026Panel upgradeReplace 200-amp service with new siemens94123$30,000
Jul 17, 2026Panel upgradeReplace knob & tube with romex94117$15,000
Jul 17, 2026EV chargerInstall new 240v circuit with ev charger in garage with load manager94114$2,500
Jul 16, 2026Panel upgradeNeed green tag - main service panel94116$3,000
Jul 14, 2026Panel upgradeNew 200 amp service, replace knob and tube throughout94112$15,000
Jul 14, 2026Panel upgradeNew 400 amp service, 9 residential meters/ 1 house94103$30,000
Jul 8, 2026Panel upgradeNeed green tag - main service panel94116$50,000
Jun 26, 2026EV chargerInstallation 40a circuit for ever charge ev charger in garage space 14694107$1,900
Jun 11, 2026Panel upgrade30-amp a/c unit94131$2,000
Jun 9, 2026Panel upgradeReference e202112107307- new electrical throughout units, two new subpanels, 2 new main panel…94114$2,000
Jun 4, 2026SolarSolar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 400 vac, with 13.5…94115$18,000
Jun 3, 2026Panel upgradeReplace all knob & tube with romex throughout/install (3) baseboard heaters/install new sub-panel94121$30,000
May 28, 2026EV chargerInstall ev charger on new circuit from unit's meter with load manager94122$2,000
May 26, 2026Panel upgradeReplace 100 amp federal pacific panel for new siemens type94123$3,000
May 26, 2026Panel upgradeInstall ev charger on existing ev charger dedicated panel and load managed by the evercharge system94107$2,000
May 26, 2026EV chargerInstall ev charger on existing ev charger dedicated panel and load managed by the evercharge system94107$2,000
May 18, 2026EV chargerInstall ev charger in garage on 50a circuit94127$1,500
May 15, 2026Panel upgradeUnit 302- replace federal pacific panel with siemens94133$3,000
May 14, 2026Panel upgradeUpgrade 200 amp service94132$1,000
May 12, 2026Panel upgradeAdd 240v circuit from main panel and ev charger in garage94112$1,500
May 12, 2026EV chargerAdd 240v circuit from main panel and ev charger in garage94112$1,500
May 11, 2026Panel upgradeInstall ev charger with load management device from subpanel in garage94122$1,800
May 11, 2026EV chargerInstall ev charger with load management device from subpanel in garage94122$1,800
May 11, 2026EV chargerInstall ev charger in garage on new 60a 240v circuit94131$2,000
Apr 30, 2026Panel upgradeReplace federal pacific panel with siemens type94117$2,000

What to ask before you hire

About Wells Electrical, Inc

  • Ask what the warranty covers and for how long, in writing.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Wells Electrical, Inc

Five quick questions. We pass your request to Wells Electrical, Inc.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Wells Electrical, Inc. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 94102 and 94110

See all 1,063 panel upgrade electricians in San Francisco, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.