contractors.fyi
Sign in

47 North Electric

EV charger installer based in Tacoma.

  • License 47NORNE760K8, expired in the state's records on Oct 3, 2026
  • No current bond on the state's list for this license

16 jobs on Seattle permits, 2024 to 2025: 8 EV charger installations, 8 panel upgrades.

The state showed this license as "expired" on Oct 3, 2026. Do not hire until that is cleared.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License 47NORNE760K8, expired in the state's records on Oct 3, 2026GENERALProblem
Insurance and bond?No current bond on the state's list for this licenseNo liability insurance policy on the state's list for this license.Ask them
Jobs on record16 jobs on Seattle permits, 2024 to 2025: 8 EV charger installations, 8 panel upgradesThey are based in Tacoma. Work outside Seattle is not in these records.Our Seattle permit records cover October 2021 to September 2026.Of their 8 EV charger permits, 3 mention a panel upgrade.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $4,200 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What EV charger jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a EV charger permit stays open about 19 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long EV charger jobs take.

Track record

0 jobs in the last 12 months, down from 16 the year before

Q4 2024: 1 jobQ1 2025: 2 jobsQ2 2025: 6 jobsQ3 2025: 7 jobsBusiest: 7 jobs2025
Each bar is 3 months of permits. The tallest is 7 jobs, July to September 2025. Across Seattle, all contractors together had 77% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 981024 jobs
  • 981174 jobs
  • 981192 jobs
  • 981071 job
  • 981051 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 22, 2025EV chargerInstall a 50 amp Level 2 EV Charger on SW corner of house98102$1,800
Sep 2, 2025EV chargerInstall 60 amp Level 2 Car Charger in detached lower garage98107$4,000
Aug 17, 2025Panel upgradeAdd 50 amp level 2 ev charging station to exterior corner of house98102$2,200
Aug 17, 2025Panel upgradeInstall new 200A Nema 3R meter main on NE side of home98117$7,100
Aug 17, 2025EV chargerAdd 50 amp level 2 ev charging station to exterior corner of house98102$2,200
Aug 17, 2025EV chargerInstall new 200A Nema 3R meter main on NE side of home98117$7,100
Jul 30, 2025EV chargerUpper floor remodel98105$10,369
Jun 15, 2025EV chargerMiscellaneous improvements- Add (2) ceiling fans Add lighting to storage closet Relocate switches…98103$7,000
Jun 7, 2025Panel upgradeUpgrade existing sub panel from 50 amp to 125 amp98119$4,400
Jun 7, 2025Panel upgradeUpgrading main panel to increase circuit capacity98102$7,000
Jun 7, 2025EV chargerUpgrade existing sub panel from 50 amp to 125 amp98119$4,400
May 7, 2025Panel upgradeNew DADU west side of main house, separate 200 amp service98117$41,000
Apr 7, 2025EV chargerLimited capacity on current electrical service98109$4,000
Feb 3, 2025Panel upgradePartial knob and tube replacement in main floor bedroom, hallway, dining, and living room- no…98117$15,000
Jan 20, 2025Panel upgradeAddition on East side of home98115$10,400
Oct 28, 2024Panel upgradeUpgrade existing 100amp service new 200amp service98116$4,607

What to ask before you hire

About 47 North Electric

  • Do not hire until the state shows the license as active.
  • Ask for proof of liability insurance and a current bond.
  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from 47 North Electric

Five quick questions. We pass your request to 47 North Electric.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to 47 North Electric. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 98102 and 98117

See all 148 EV charger installers in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.