contractors.fyi
Sign in

Washington Generators LLC

EV charger installer based in Kent.

  • License active
  • Insurance and bond on file

72 jobs on Seattle permits, 2022 to 2026: 54 EV charger installations, 8 heat pump installations, 8 panel upgrades, 2 solar installations. 15th most EV charger permits of 148 contractors in Seattle.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?License WASHIGL795ON, active in the state's records on Oct 3, 2026Construction contractorThe same business also holds license WASHIGL7956N (Electrical contractor), active in the state's records.Checks out
Insurance and bond?Bond $30,000 on file with the state, with no end date (it stays in force until the bond company cancels it)Liability insurance $2,000,000 on file with the state, until Feb 15, 2027.On file
Jobs on record72 jobs on Seattle permits, 2022 to 2026: 54 EV charger installations, 8 heat pump installations, 8 panel upgrades, 2 solar installationsThey are based in Kent. Work outside Seattle is not in these records.15th most EV charger permits of 148 licensed contractors in Seattle. That counts jobs, not quality.Our Seattle permit records cover October 2021 to September 2026.Of their 54 EV charger permits, 3 mention a panel upgrade.

Records: the state Department of Labor and Industries and City of Seattle permits.

Cost and timing

Permit value (not a price)

Their typical permit lists $2,475 (half list more, half less)

That is the figure written on the permit form, which can be far from what you pay. What EV charger jobs cost in Seattle.

Get 2 or 3 written quotes.

Permit timeline

Across Seattle, a EV charger permit stays open about 19 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. How long EV charger jobs take.

Track record

5 jobs in the last 12 months, down from 9 the year before

Q3 2022: 9 jobsQ4 2022: 3 jobsQ1 2023: 14 jobsQ2 2023: 7 jobsQ3 2023: 3 jobsQ4 2023: 5 jobsQ1 2024: 7 jobsQ2 2024: 7 jobsQ3 2024: 3 jobsQ4 2024: 2 jobsQ1 2025: 2 jobsQ2 2025: 3 jobsQ3 2025: 2 jobsQ1 2026: 2 jobsQ2 2026: 2 jobsQ3 2026: 1 jobBusiest: 14 jobsLatest: 1 job2023202420252026
Each bar is 3 months of permits. The tallest is 14 jobs, January to March 2023. Across Seattle, all contractors together had 77% fewer EV charger jobs in the last 12 months than in the 12 months before.

Where they work most

  • 9811511 jobs
  • 981177 jobs
  • 981256 jobs
  • 981186 jobs
  • 981365 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 2, 2026Heat pumpLike in kind gas furnace and heat pump replacement98136$7,000
Jun 4, 2026Heat pumpAdding Heat Pump to HVAC System98115$3,500
Apr 30, 2026Heat pumpAir Handler & Heat Pump Replacement (Like in Kind) Unit 803, STFI (Subject to Field Inspection)98102$13,000
Jan 27, 2026Heat pumpRemove and Replace Heat Pump98112$15,000
Jan 20, 2026Heat pumpRemove & Replace Gas Furnace and Add Heat Pump to HVAC system98125$20,000
Sep 23, 2025EV charger98117$2,475
Jul 31, 2025Panel upgradeMain Panel Swap - Like for Like98133$2,475
Jun 16, 2025Heat pumpRemove & Replace Gas Furnace Remove AC and install new Heat Pump98115$15,000
Jun 2, 2025Heat pumpAdding Heat Pump to HVAC system98122$14,000
Jun 2, 2025Panel upgradeInstall 200amp electrical panel and 230v circuit for heat pump98122$5,000
Mar 6, 2025Heat pumpInstall 4 Zone Ductless Mini Split Heat Pump98115$9,500
Feb 26, 2025Panel upgradeInstallation of standby generator[3/21/2025 Added 200amp Service and 100amp Generator Feeder to…98106$2,475
Dec 19, 2024EV charger98118$2,475
Nov 7, 2024EV chargerNo details on the permit98177$2,475
Sep 4, 2024EV chargerNo details on the permit98118$2,475
Aug 13, 2024SolarInstallation of standby generator and ATS[9/18/2024 JBC Added (2) 200amp Transfer Switches to…98112$2,475
Jul 29, 2024SolarInstallation of 30 x REC Solar 400 Watt Panels (REC400NP3 Black) 30 x IQ8A-72-2-US (Enphase…98112$2,200
Jun 11, 2024EV chargerNo details on the permit98119$2,475
Jun 7, 2024Panel upgradeSpan panel and EV charger installation98107$2,475
Jun 7, 2024EV chargerSpan panel and EV charger installation98107$2,475
May 23, 2024EV chargerInstallation of EV charger [C.Kenefick 6/27/24 - fee for 100a feeder added to permit98199$2,475
May 23, 2024EV chargerNo details on the permit98116$2,475
Apr 30, 2024EV chargerNo details on the permit98105$2,475
Apr 1, 2024EV charger98136$2,475
Mar 18, 2024Panel upgradeService panel upgrade and installation of 2 SPAN electrical Panels with SPAN Drive EV Charger…98199$3,475
Mar 18, 2024EV chargerService panel upgrade and installation of 2 SPAN electrical Panels with SPAN Drive EV Charger…98199$3,475
Mar 5, 2024EV charger98117$2,475
Feb 2, 2024EV charger98115$2,475
Jan 26, 2024EV charger98115$2,475
Jan 19, 2024EV chargerNo details on the permit98115$2,475
Jan 9, 2024EV chargerNo details on the permit98125$2,475
Dec 19, 2023EV chargerNo details on the permit98136$2,475
Dec 19, 2023EV chargerNo details on the permit98177$2,475
Dec 19, 2023EV chargerNo details on the permit98118$2,475
Nov 21, 2023EV chargerNo details on the permit98116$2,475
Oct 23, 2023EV charger98133$2,475
Aug 4, 2023Panel upgradeCurrently have the following permit but need to pull additional permit to reflect 200 amp service…98117$2,475
Jul 12, 2023EV chargerNo details on the permit98125$2,475
Jul 7, 2023EV chargerNo details on the permit98117$2,475
Jun 26, 2023EV chargerNo details on the permit98133$2,475

What to ask before you hire

About Washington Generators LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any EV charger installer

  • Can you show me proof of liability insurance and your bond?
  • Is my panel big enough, or does it need an upgrade first?
  • Where will the wire run, and what does each extra foot cost?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Washington Generators LLC

Five quick questions. We pass your request to Washington Generators LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Washington Generators LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More EV charger installers near 98115 and 98117

See all 148 EV charger installers in Seattle, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.