contractors.fyi
Sign in

Good Faith Energy

Solar installer working in Austin.

  • License active

39 jobs on Austin permits, 2022 to 2026: 36 solar installations, 3 panel upgrades. 31st most solar system permits of 115 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 31876, valid until Jun 15, 2027We matched it by the phone on their permits.Checks out
Jobs on record39 jobs on Austin permits, 2022 to 2026: 36 solar installations, 3 panel upgrades31st most solar system permits of 115 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.Of their 36 solar system permits, 23 mention a battery.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a solar system permit stays open about 85 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 7 days. How long solar system jobs take.

Track record

20 jobs in the last 12 months, up from 9 the year before

Q3 2022: 3 jobsQ4 2022: 2 jobsQ1 2024: 1 jobQ2 2024: 1 jobQ3 2024: 3 jobsQ4 2024: 2 jobsQ1 2025: 6 jobsQ2 2025: 1 jobQ3 2025: 2 jobsQ4 2025: 5 jobsQ1 2026: 3 jobsQ2 2026: 9 jobsQ3 2026: 1 jobBusiest: 9 jobs2023202420252026
Each bar is 3 months of permits. The tallest is 9 jobs, April to June 2026. Across Austin, all contractors together had 9% fewer solar system jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787469 jobs
  • 787045 jobs
  • 787314 jobs
  • 787414 jobs
  • 787503 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Sep 9, 2026SolarNo details on the permit78750not stated
Jun 29, 2026Solar, 17.835 kWInstalling a 17.835 kW PV system (2) TESLA INC. 1707000-XX-Y inverters/batteries and (1) TESLA INC.…78746not stated
Jun 8, 2026SolarNo details on the permit78746not stated
May 20, 2026SolarExpress: Installing Tesla solar roof system78731not stated
May 15, 2026SolarExpress: Installing Tesla solar roof system78731not stated
May 5, 2026Solar, 26.136 kWREQUEST TO DISCONNECT. Installing a 26.136 kW PV system and (2) Tesla Inc78727not stated
Apr 17, 2026Panel upgradeInstalling (1) Tesla PW3 Battery and a Main Panel Upgrade (SPAN)78741not stated
Apr 13, 2026Solar, 10.12 kWInstalling a 10.12 kW PV system and (2) Tesla Inc78734not stated
Apr 6, 2026Solar, 26.136 kWREQUEST TO DISCONNECT. Installing a 26.136 kW PV system and (2) Tesla Inc78727not stated
Apr 2, 2026SolarETJ-Contractor is replacing two panels on 4/15/26 with new disconnects then will be doing another…78734not stated
Feb 25, 2026Solar, 26.136 kWInstalling a 26.136 kW PV system and (2) Tesla Inc78727not stated
Jan 16, 2026Solar, 15.225 kWREQUEST TO DISCONNECT. Installing a 15.225 kW PV solar system 1 Tesla PW 3 and 1 Tesla DC expansion78702not stated
Jan 14, 2026Solar, 15.225 kWInstalling a 15.225 kW PV solar system 1 Tesla PW 3 and 1 Tesla DC expansion78702not stated
Nov 18, 2025Solar, 7.83 kWREQUEST TO DISCONNECT Installing a 7.83 kW PV solar system and 1 Tesla PW 3 We need to disconnect…78750not stated
Nov 12, 2025Solar, 36.504 kWREQUEST TO DISCONNECT Installing a 36.504 kW PV Solar System 4 Tesla Inverters 2 Sol-Ark Inverters…78731not stated
Nov 12, 2025Solar, 18.86 kWREQUEST TO DISCONNECT Installing 18.86 kW Solar PV system and 40.5 kWh Energy Storage Systems78704not stated
Nov 4, 2025Solar, 9.2 kWREQUEST TO DISCONNECT Installing a 9.2 kW PV solar system and 1 Tesla PW 3 We need to disconnect…78741not stated
Oct 17, 2025Solar, 18.86 kWInstalling 18.86 kW Solar PV system and 40.5 kWh Energy Storage Systems78704not stated
Sep 30, 2025Solar, 7.83 kWInstalling a 7.83 kW PV solar system and 1 Tesla PW 378750not stated
Sep 25, 2025Solar, 9.2 kWInstalling a 9.2 kW PV solar system and 1 Tesla PW 378741not stated
Jun 23, 2025Solar, 36.504 kWDaniel Ladd - Installing a 36.504 kW PV Solar System 4 Tesla Inverters 2 Sol-Ark Inverters 2…78731not stated
Mar 28, 2025Solar, 24.36 kWREQUEST TO DISCONNECT Were installing a 24.36 kW solar system 4 Tesla PW 3 batteries and DG PV meter78738not stated
Mar 28, 2025Panel upgradeREQUEST TO DISCONNECT Installing (1) Tesla PW3 Battery and a Main Panel Upgrade (SPAN)78741not stated
Mar 19, 2025Solar, 2.05 kWInstalling a 2.05 kW solar system 1 Tesla PW 3 battery and 1 Tesla DC expansion battery78704not stated
Feb 12, 2025Solar, 2.05 kWREQUEST TO DISCONNECT for the installation of a 2.05 kW PV solar system 1 Tesla PW 3 battery and 1…78704not stated
Jan 13, 2025Solar, 24.36 kWREQUEST TO DISCONNECT Were installing a 24.36 kW solar system 4 Tesla PW 3 batteries and DG PV…78738not stated
Jan 6, 2025Solar, 24.36 kWInstalling a 24.36 kW PV solar system 4 Tesla PW 3 batteries and DG PV Meter78738not stated
Oct 22, 2024Solar, 5.46 kWInstalling a 5.46 kW solar system (2) Tesla Power Wall 3 batteries and (1) SPAN Panel upgrade in…78726not stated
Oct 18, 2024Panel upgradeUpgradation of existing loads panel78726not stated
Jul 18, 2024Solar, 33.18 kWRequest to Disconnect Installing a 33.18 kW PV solar system (Grid Tied solar system)78746not stated
Jul 18, 2024Solar, 7.02 kWInstalling a 7.02 kW PV solar system and 1 Tesla Powerwall 3 battery78652not stated
Jul 2, 2024Solar, 33.18 kWInstalling a 33.18 kW PV solar system78746not stated
Apr 17, 2024Solar, 7.02 kWInstalling a 7.02 kW PV solar system and 1 Tesla Powerwall 3 battery78652not stated
Jan 29, 2024Solar, 38.5 kWInstalling a 38.5 kW PV solar system and 15 Homegrid batteries78704not stated
Dec 9, 2022Solar**REQUEST TO DISCONNECT** 1/13/2023 Main service meter upgrade (SPAN) and disconnect/reconnect to…78746not stated
Oct 13, 2022SolarExpress: Installing solar roof 4 Tesla power wall 2 batteries and a main panel upgrade78746not stated
Aug 31, 2022SolarExpress: Installing solar roof 4 Tesla power wall 2 batteries and a main panel upgrade78746not stated
Jul 27, 2022Solar, 33.624 kWInstalling a 33.624 kW PV solar glass system 4 Tesla powerwall 2 batteries and a main panel upgrade…78746not stated
Jul 25, 2022Solar, 33.624 kWInstalling a 33.624 kW PV solar glass roof system and 4 Tesla powerwall 2 batteries78746not stated

What to ask before you hire

About Good Faith Energy

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any solar installer

  • Can you show me proof of liability insurance and your bond?
  • What size system, which panels and inverter, and what will it make in a year?
  • Is my roof good for 25 more years, and what if it needs work first?
  • Who handles the permit and the utility's approval to turn it on?

Get a quote from Good Faith Energy

Five quick questions. We pass your request to Good Faith Energy.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Good Faith Energy. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More solar installers near 78746 and 78704

See all 115 solar installers in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.