contractors.fyi
Sign in

In Charge Electrical Services, LLC

Panel upgrade electrician working in Austin.

  • License active

16 jobs on Austin permits, 2021 to 2026: 8 panel upgrades, 5 solar installations, 3 EV charger installations.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 24896, valid until Sep 4, 2027We matched it by the business name in the same city, Round Rock.Checks out
Jobs on record16 jobs on Austin permits, 2021 to 2026: 8 panel upgrades, 5 solar installations, 3 EV charger installationsOur Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

6 jobs in the last 12 months, up from 1 the year before

Q4 2021: 1 jobQ1 2023: 4 jobsQ2 2023: 1 jobQ4 2023: 1 jobQ3 2024: 2 jobsQ4 2024: 1 jobQ4 2025: 1 jobQ1 2026: 1 jobQ2 2026: 1 jobQ3 2026: 3 jobsBusiest: 4 jobsLatest: 3 jobs20222023202420252026
Each bar is 3 months of permits. The tallest is 4 jobs, January to March 2023. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 787235 jobs
  • 787464 jobs
  • 787532 jobs
  • 786601 job
  • 787381 job

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

A row marked ×2 or more stands for that many similar jobs on one day in one ZIP code.

DateWorkZIPOn the permit form
Sep 14, 2026Panel upgradeWe are going to be upgrading the existing really old overhead service with no exterior panel to a…78723not stated
Jul 29, 2026SolarAccording to Patrick Kuhn with AE the solar PV meter was removed by AE crews due to damage to the…78660not stated
Jul 13, 2026Panel upgradeNo details on the permit78746not stated
Jun 15, 2026Panel upgrade300 amp service New construction sfr in the etj 600 amp service78738not stated
Jan 12, 2026Panel upgradeInstall 1 tesla gateway 2 tesla powerwalls and 1 Tesla Charger78746not stated
Dec 10, 2025Panel upgradeUpgrade electrical service from 225 amp to a 300 amp service78757not stated
Oct 31, 2024Panel upgrade1-Story addition to existing SFR addition of primary suite craft room laundry room and screened…78704not stated
Sep 5, 2024Panel upgradeInstalling a new meter and 200A 30-space main breaker panel Installing a new 50A circuit for the…78753not stated
Sep 5, 2024EV chargerInstalling a new meter and 200A 30-space main breaker panel Installing a new 50A circuit for the…78753not stated
Oct 10, 2023EV chargerInstall EV Charger78727not stated
Apr 19, 2023EV chargerStand alone electrical permit to install EV charger78746not stated
Jan 5, 2023Solar (×4, same day)No details on the permit78723not stated
Oct 4, 2021Panel upgradeReplace main panel due to rust damage78746not stated

What to ask before you hire

About In Charge Electrical Services, LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from In Charge Electrical Services, LLC

Five quick questions. We pass your request to In Charge Electrical Services, LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to In Charge Electrical Services, LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78723 and 78746

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.