contractors.fyi
Sign in

Jonestown Electrical Solutions LLC

Panel upgrade electrician working in Austin.

  • License active

335 jobs on Austin permits, 2021 to 2025: 334 panel upgrades, 1 EV charger installation. The most panel upgrade permits of 327 contractors in Austin.

What the records show vs. what they say

The public record next to the business's own words.

QuestionRecords showThey sayMark
Licensed?Texas electrical contractor license 33171, valid until Dec 2, 2026We matched it by the phone on their permits.Checks out
In business?Says it has 30 years of experience
Jobs on record335 jobs on Austin permits, 2021 to 2025: 334 panel upgrades, 1 EV charger installationThe most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

In their words

  • Services: Residential and commercial electrical installations, Electrical repairs and maintenance, Troubleshooting services, Main electrical panels
    and 10 moreLighting, Outlets, Ceiling fans, Lighting control panels, Generators, Solar installations, New construction electrical work, Electrical consulting, System upgrades, Design services (lighting, dedicated power, main service, one-line diagrams)
  • Regulated by Texas Department of Licensing and Regulation
  • Works in: Jonestown, TX, Austin area

Records: City of Austin permits. They say: jonestownelectricalsolutionsllc.com, read October 2026, summed up by us. We matched the site to this business by its name, city and trade; no license or phone on record could confirm it. We have not checked that the claims are true.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

0 jobs in the last 12 months, down from 24 the year before

Q4 2021: 7 jobsQ1 2022: 22 jobsQ2 2022: 49 jobsQ3 2022: 9 jobsQ4 2022: 29 jobsQ1 2023: 26 jobsQ2 2023: 32 jobsQ3 2023: 27 jobsQ4 2023: 52 jobsQ1 2024: 28 jobsQ2 2024: 9 jobsQ3 2024: 23 jobsQ4 2024: 13 jobsQ1 2025: 9 jobsBusiest: 52 jobs2022202320242025
Each bar is 3 months of permits. The tallest is 52 jobs, October to December 2023. Across Austin, all contractors together had 17% more panel upgrade jobs in the last 12 months than in the 12 months before.

Where they work most

  • 7875949 jobs
  • 7873146 jobs
  • 7874636 jobs
  • 7870324 jobs
  • 7870417 jobs

Jobs by kind of work

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
Mar 9, 2025Panel upgrade, 24 kWInstallation of new 24 kW whole home generator (natural gas) connected to house meter and main…78731not stated
Mar 9, 2025Panel upgrade, 27 kW78757not stated
Feb 25, 2025Panel upgrade, 24 kW78757not stated
Feb 11, 2025Panel upgrade, 24 kW78745not stated
Jan 22, 2025Panel upgrade, 26 kW78750not stated
Jan 9, 2025Panel upgrade, 18 kWDisconnect/Reconnect 18kW whole home generator (Natural Gas) connected to house meter and main panel78749not stated
Jan 9, 2025Panel upgrade, 26 kW78703not stated
Jan 9, 2025Panel upgrade, 22 kW78745not stated
Jan 9, 2025Panel upgrade, 24 kW78754not stated
Dec 11, 2024Panel upgrade, 26 kW78703not stated
Dec 9, 2024Panel upgrade, 26 kWRequest to disconnect 26kW whole home generator (natural gas) and 200amp transfer switch connected…78730not stated
Dec 2, 2024Panel upgrade, 24 kW78704not stated
Dec 2, 2024Panel upgrade, 26 kW78731not stated
Dec 2, 2024Panel upgrade, 24 kW78732not stated
Nov 26, 2024Panel upgrade, 24 kW78726not stated
Nov 21, 2024Panel upgrade, 26 kW78750not stated
Nov 15, 2024Panel upgrade, 26 kW78759not stated
Nov 15, 2024Panel upgrade, 14 kWRequest to disconnect 14kW whole home generator (natural gas) and 200amp transfer switch connected…78732not stated
Nov 7, 2024Panel upgrade, 26 kW78759not stated
Nov 1, 2024Panel upgrade, 26 kWRequest to disconnect78731not stated
Oct 25, 2024EV chargerInstall new EV charger78726not stated
Oct 2, 2024Panel upgrade, 26 kW78730not stated
Sep 23, 2024Panel upgrade, 48 kW78704not stated
Sep 23, 2024Panel upgrade, 26 kW78759not stated
Sep 20, 2024Panel upgrade, 18 kW18kw whole home generator (Natural Gas) connected to house main panel78702not stated
Sep 20, 2024Panel upgrade, 24 kW24kw whole home generator (Natural Gas) connected to main panel78750not stated
Sep 20, 2024Panel upgrade, 26 kWRequest to disconnect78733not stated
Sep 18, 2024Panel upgrade, 26 kW78749not stated
Sep 13, 2024Panel upgrade, 22 kW78717not stated
Sep 6, 2024Panel upgrade, 26 kW78759not stated
Sep 3, 2024Panel upgrade, 26 kW78731not stated
Sep 3, 2024Panel upgrade, 22 kW22kw whole home generator (Liquid Propane) connected to subpanel down stream from main disconnect78749not stated
Aug 22, 2024Panel upgrade, 48 kW78730not stated
Aug 22, 2024Panel upgrade, 26 kW78704not stated
Aug 12, 2024Panel upgrade, 26 kWRequest to disconnect 26kW whole home generator (natural gas) and 200amp transfer switch connected…78746not stated
Jul 26, 2024Panel upgrade, 26 kW78759not stated
Jul 23, 2024Panel upgrade, 26 kW78731not stated
Jul 19, 2024Panel upgrade, 26 kW78735not stated
Jul 19, 2024Panel upgrade, 26 kW78738not stated
Jul 18, 2024Panel upgrade, 26 kW78726not stated

What to ask before you hire

About Jonestown Electrical Solutions LLC

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Jonestown Electrical Solutions LLC

Five quick questions. We pass your request to Jonestown Electrical Solutions LLC.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Jonestown Electrical Solutions LLC. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78759 and 78731

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.