contractors.fyi
Sign in

Lefty's Electrical Services

Panel upgrade electrician working in Austin.

  • License active

7 panel upgrade jobs on Austin permits, 2024 to 2025. 177th most panel upgrade permits of 327 contractors in Austin.

What the public records show

From the state's license records and the city's permits, one question at a time.

QuestionRecords showMark
Licensed?Texas electrical contractor license 41262, valid until Mar 23, 2027We matched it by the business name in the same city, Austin.Checks out
Jobs on record7 panel upgrade jobs on Austin permits, 2024 to 2025Every permit we have for them is panel upgrade.177th most panel upgrade permits of 327 contractors in Austin. That counts jobs, not quality.Our Austin permit records cover September 2021 to September 2026.

Records: City of Austin permits.

Cost and timing

Permit timeline

Across Austin, a panel upgrade permit stays open about 62 days, from permit to final inspection

This is not how long the crew works at your home: most of it is waiting for the inspection. Ask them how many days the work takes. Waiting for the permit adds about 6 days. How long panel upgrade jobs take.

Track record

Jobs per quarter

Q1 2024: 1 jobQ2 2024: 1 jobQ1 2025: 4 jobsQ2 2025: 1 jobBusiest: 4 jobs20242025
Each bar is 3 months of permits. The tallest is 4 jobs, January to March 2025.

Where they work most

  • 787532 jobs
  • 787511 job
  • 787271 job
  • 787481 job
  • 787461 job

Latest jobs

Permit values are what the contractor wrote on the permit form, not what the owner paid.

DateWorkZIPOn the permit form
May 6, 2025Panel upgradeReplacement of the 200/225 amp main breaker panel upgrade of the main electrical service to 200…78751not stated
Mar 21, 2025Panel upgrade60 amp sub panel replacement with new afci breakers78727not stated
Mar 12, 2025Panel upgradeReplace meter can with new 200 amp meter base replace panel with new 125 amp main breaker panel…78753not stated
Mar 7, 2025Panel upgrade200 amp main breaker panel 200 amp meter base main grounding system surge protection78748not stated
Feb 10, 2025Panel upgrade200 amp main breaker panel replacement 200 amp meter socket replacement main grounding system…78746not stated
Apr 18, 2024Panel upgradeUpgrade to 125 amp panel to 150 amp install all new breakers and copper connections; add whole home…78753not stated
Jan 23, 2024Panel upgradeElectrical panel replacement78745not stated

What to ask before you hire

About Lefty's Electrical Services

  • Ask what the warranty covers and for how long, in writing.
  • Search their name on the Better Business Bureau site, and read their reviews.

Worth asking any panel upgrade electrician

  • Can you show me proof of liability insurance and your bond?
  • What size panel, and does the utility need to change the service to my house?
  • Who arranges the power shutoff with the utility?
  • Who pulls the permit, and who meets the inspector?

Get a quote from Lefty's Electrical Services

Five quick questions. We pass your request to Lefty's Electrical Services.

You decide who to hire. Your details go only to the contractors you pick. How we use your details

1. Where is the job?

We match contractors who work near it. We never ask for your street address.

2. What do you need?

Pick any that fit.

3. When do you want to start?
4. What is your rough budget?

A range is fine. It helps contractors reply with a real number.

5. Where should we send it?

Your contact details go only to who you pick here.

Sent. We have your request.

We pass it to Lefty's Electrical Services. Replies usually come within a few days.

Your job room keeps the request, your photos and every reply in one place, with an assistant that checks prices against city permits. Keep its link: it is the key to your job.

Open your job room

More panel upgrade electricians near 78753 and 78751

See all 327 panel upgrade electricians in Austin, ranked by jobs

Run this business? Claim this page to get requests by email and reply to homeowners here.

Is this your business? Correct a record or add your warranty terms. It is free.

We check every change before it goes on the page, usually within a week, and may call to confirm you run the business.